Quote:
Originally Posted by gaviscon
Are we waiting for the millenium line extension to wrap up at Arbutus before the rental tower begins?
|
They got excavation and shoring permission on March 20th but it also says something about waiting for consent from the province
Quote:
To address engineering condition:
under no condition can any construction (shoring and excavation) begin until we receive the official consent letter from the Province. The street use permit on hold.
|
https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=257323857