HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates


Reply

 
Thread Tools Display Modes
     
     
  #101  
Old Posted Jan 3, 2025, 4:08 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Heavy equipment now working the site prep for this future LTC home.
Reply With Quote
     
     
  #102  
Old Posted Feb 11, 2025, 3:17 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Lots of heavy equipment working on the new road along the north end of the site. New sewer and utilities being installed.
Reply With Quote
     
     
  #103  
Old Posted Apr 2, 2025, 2:32 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Caisson drilling machine and heavy equipment now working the foundation for the new LTC home. Work is still happening on the new road as well.
Reply With Quote
     
     
  #104  
Old Posted Apr 13, 2025, 1:09 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Reply With Quote
     
     
  #105  
Old Posted May 11, 2025, 10:41 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,216
While taking drone footage of Highbury I spun the drone around to take a shot of whatever is going on over here. Doesn't look like much from the air, but they are doing work here. Looks like some foundation poured along the Ashland Ave side of the property.

Reply With Quote
     
     
  #106  
Old Posted May 31, 2025, 7:39 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Work continues on forming and pouring the L1 foundation walls for the new LTC Home. Probably start seeing the L1 floor slab pours in another month. The old factory building is an epic eyesore and disaster waiting to happen. Would be really nice if Sierra Construction would actually move ahead with the redevelopment or sell it off to a developer who will. The new connector road on the north side has not seen any work in months and is just dirt with the new sewer lines and utilities installed. Why they haven't finished is a mystery.
Reply With Quote
     
     
  #107  
Old Posted Jun 16, 2025, 12:07 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,216
Reply With Quote
     
     
  #108  
Old Posted Jul 12, 2025, 12:56 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Work continues on forming and pouring the foundation footings and walls for the LTC Home
Reply With Quote
     
     
  #109  
Old Posted Aug 17, 2025, 7:19 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Have started forming for the ground floor slab along the east side of this future LTC home. Still nothing on the factory building itself as more and more of the windows are being broken out and smashed by vandals. It's starting to look like the worst of urban wasteland Detroit.

City has done nothing with the extension of the street along the north end of the property either.
Reply With Quote
     
     
  #110  
Old Posted Aug 25, 2025, 4:20 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
They poured the ground floor slab in the NE corner of the LTC home today.
Reply With Quote
     
     
  #111  
Old Posted Sep 7, 2025, 2:44 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
They have now poured the ground floor slab in the SE corner. Have started installing structural steel posts and prefab steel wall module panels for the ground floor walls.
Reply With Quote
     
     
  #112  
Old Posted Oct 4, 2025, 7:16 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Have poured some of the 2nd floor slab on the LTC building now as they continue to install steel modular wall panel units to build the structure. These appear much more robust then the wall panels used by Drewlo on their many low rise apartments.

Still no progress on the new road extension along the north side or on the factory building as Sierra Construction doesn't seem to have any plan for the factory. It's looking more and more like the factory will be seeing the wrecking ball in its future.
Reply With Quote
     
     
  #113  
Old Posted Nov 13, 2025, 5:16 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Making progress installing the 2nd floor steel modular wall panels on the north wing of the LTC home. Have already started installing the window units on the ground floor level.
Reply With Quote
     
     
  #114  
Old Posted Dec 9, 2025, 5:08 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Starting to make progress installing the 3rd floor modular steel wall panels along the east side of the LTC home. Pace has noticeably slowed in recent months.
Reply With Quote
     
     
  #115  
Old Posted Jan 7, 2026, 8:29 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Have made progress installing the 3rd floor steel modular wall panels on the south wing.
Reply With Quote
     
     
  #116  
Old Posted Jan 16, 2026, 10:14 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Wrapping up the 3rd floor steel modular wall panel installs on the north wing.
Reply With Quote
     
     
  #117  
Old Posted Feb 26, 2026, 10:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Roofing contractor has started prep on installing the roof on the LTC home. Window units continue to be installed and exterior insulation on the walls ahead of masonry contractor starting.
Reply With Quote
     
     
  #118  
Old Posted Mar 14, 2026, 6:55 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Windows are now installed and appears that the roofing contractor has made a lot of progress on installing the roof now on the new LTC home. Sierra Construction has done nothing with the old McCormick factory building which continues to rot away with most of the windows now broken out.
Reply With Quote
     
     
  #119  
Old Posted Apr 7, 2026, 3:26 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,976
Finding history on the site of the factory.

https://www.cbc.ca/news/canada/london/mccormicks-factory-artifacts-9.7153794

Meanwhile nothing but crickets from Sierra Construction.
Reply With Quote
     
     
  #120  
Old Posted Apr 7, 2026, 6:02 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
Pass me the Vomit Bag.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 50,940
Interesting article. I wonder what that 3cent token for the cafeteria would buy back in the day? Maybe a sandwich?
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell). Sweet Loretta fart thought she was a cleaner, but she was a frying pan. (John Lennon)
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump