SSC forum says site work was taking place in 2015 -
https://www.skyscrapercity.com/threads/c...r-570m-122f-mixed-use-szr.1552182/page-6
It may have been set as under construction in the database here at the time because of the site work being done, although no structure had been started.
Entisar Tower -
https://skyscraperpage.com/cities/?buildingID=100867
Burj Azizi -
https://skyscraperpage.com/cities/?buildingID=149358