The trail won't be truly complete (to me) until the gap in the SW trail is fixed. (Marked WST6 on the map)

Redoing the section thru Glenwood with a new bridge across I-20 (Marked SST 6 Phase II on the map) will be a plus, though. They should consider doing the same where the NW trail crosses the railyard over Marietta Boulevard. But I don't really care for that part of town so it's not really of any concern to me.

Is anyone aware of the progress on the Ponce de Leon ramp, or the bridge to Ansley Mall? Both seem to be essentially complete but were still fenced off, last time I checked. It's a shame I'll never be able to use the former to get to EATS.
Reply With Quote
     
     
  #1622  
Old Posted Oct 16, 2025, 10:31 AM
Julien Julien is offline
Registered User
 
Join Date: Apr 2021
Location: ATL/Atlantic Station
Posts: 1,104
Quote:
Originally Posted by bryantm3 View Post
......or the bridge to Ansley Mall? Both seem to be essentially complete but were still fenced off, last time I checked....
Ansley Mall has construction for the restaurants going on and is blocked off from the mall side too. There is even on overlook level being built for at least one of the locations.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast > Atlanta
Forum Jump



Forum Jump


All times are GMT. The time now is 8:11 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.