^It will connect into the 10th street cycle track (Midtown Alliance project which is funded and includes infrastructure on both Williams and Techwood) and the GA tech cycle track expansions.
"Improvements include the creation of a protected two-way bikeway on 10th Street to link up the planned 10th Street multi-use path west of the Connector; a protected two-way bikeway on Williams Street to connect to planned bike facilities on Peachtree Place to the south and 12th Street to the north...."
See slides
78-80 of the bid document. The photo you posted is of the "construction to be completed by others" section on slide 79.