  #161  
Old Posted Oct 25, 2024, 4:21 PM
Sojourner_Terminus Sojourner_Terminus is offline
Registered User
 
Join Date: Oct 2020
Posts: 357
Quote:
Originally Posted by GeorgiaPeanuts View Post
It won't be 100% empty. There is a sushi restaurant at least going in the office building lobby level with an Omakase experience on the 8th floor as well.
This is part of why I'm hoping the get a major office tenant. The restaurants will rely in part on office workers/clients dining there.
Reply With Quote
     
     
  #162  
Old Posted Oct 31, 2024, 6:02 PM
Julien Julien is offline
Registered User
 
Join Date: Apr 2021
Location: ATL/Atlantic Station
Posts: 1,104
Opened up on William's St and interestingly they added a bike lane (from/to nowhere). Guess there is a long term plan for a separate bike lane but it will require a lot of work and not sure there is enough space to acquire.



Reply With Quote
     
     
  #163  
Old Posted Oct 31, 2024, 8:03 PM
shivtim's Avatar
shivtim shivtim is offline
Registered User
 
Join Date: Aug 2008
Location: Midtown Atlanta
Posts: 2,623
^It will connect into the 10th street cycle track (Midtown Alliance project which is funded and includes infrastructure on both Williams and Techwood) and the GA tech cycle track expansions.



"Improvements include the creation of a protected two-way bikeway on 10th Street to link up the planned 10th Street multi-use path west of the Connector; a protected two-way bikeway on Williams Street to connect to planned bike facilities on Peachtree Place to the south and 12th Street to the north...."
See slides 78-80 of the bid document. The photo you posted is of the "construction to be completed by others" section on slide 79.

Last edited by shivtim; Nov 1, 2024 at 1:06 PM.
Reply With Quote
     
     
  #164  
Old Posted Nov 1, 2024, 1:09 AM
Street Advocate Street Advocate is offline
Registered User
 
Join Date: Oct 2015
Posts: 3,717
Yeah… Julien I’m noting that Portman cycle track was delivered in conjunction with the 10th St / Williams cycle track shivtim mentioned, notice to proceed was issues 10/1, and construction on the rest of the project is said to be imminent.

I get wanting to be critical, speculate, and be informed on everything going on (there is a lot going on), but please try to avoid posting completely inaccurate information.

https://www.midtownatl.com/midtown-alliance/physical-improvements/under-construction
Reply With Quote
     
     
  #165  
Old Posted Nov 1, 2024, 1:08 PM
shivtim's Avatar
shivtim shivtim is offline
Registered User
 
Join Date: Aug 2008
Location: Midtown Atlanta
Posts: 2,623
^I don't think it's that serious many people just aren't aware of the cycle track plans in this area. Exciting to see them come together!
Reply With Quote
     
     
  #166  
Old Posted Nov 1, 2024, 10:58 PM
Julien Julien is offline
Registered User
 
Join Date: Apr 2021
Location: ATL/Atlantic Station
Posts: 1,104
Quote:
Originally Posted by shivtim View Post
^I don't think it's that serious many people just aren't aware of the cycle track plans in this area. Exciting to see them come together!
Here is the hotel to the south. Not obvious how it would fit.

Reply With Quote
     
     
  #167  
Old Posted Nov 4, 2024, 6:04 PM
shivtim's Avatar
shivtim shivtim is offline
Registered User
 
Join Date: Aug 2008
Location: Midtown Atlanta
Posts: 2,623
^Williams will be reduced to two lanes for that short stretch. Check slides 78-80 of the document I posted above. It has all the engineering specifics.

Last edited by shivtim; Nov 4, 2024 at 6:20 PM.
Reply With Quote
     
     
  #168  
Old Posted Dec 4, 2024, 12:03 AM
smArTaLlone smArTaLlone is offline
Registered User
 
Join Date: Feb 2005
Posts: 8,807
1020 Spring is now officially completed

Reply With Quote
     
     
  #169  
Old Posted Dec 4, 2024, 5:10 PM
jayden jayden is offline
Registered User
 
Join Date: Dec 2007
Location: JERSEY
Posts: 1,600
Hopefully, we get some news soon on the next phase since Sora is leasing so well.
Reply With Quote
     
     
  #170  
Old Posted Dec 4, 2024, 10:47 PM
Street Advocate Street Advocate is offline
Registered User
 
Join Date: Oct 2015
Posts: 3,717
Quote:
Originally Posted by jayden View Post
Hopefully, we get some news soon on the next phase since Sora is leasing so well.
Wouldn’t mind Portman revisiting the proposed hotel… perhaps to include more residences or a towery to compete with the Rockefeller tower.
Reply With Quote
     
     
  #171  
Old Posted Dec 4, 2024, 11:31 PM
Sojourner_Terminus Sojourner_Terminus is offline
Registered User
 
Join Date: Oct 2020
Posts: 357
Quote:
Originally Posted by Street Advocate View Post
Wouldn’t mind Portman revisiting the proposed hotel… perhaps to include more residences or a towery to compete with the Rockefeller tower.
Seriously. Build more residential. They had such an easy time getting Sora filled out, it seems like a no-brainer.
Reply With Quote
     
     
  #172  
Old Posted Dec 5, 2024, 1:50 PM
montydawg montydawg is offline
Registered User
 
Join Date: May 2016
Location: NYC
Posts: 911
Quote:
Originally Posted by Sojourner_Terminus View Post
Seriously. Build more residential. They had such an easy time getting Sora filled out, it seems like a no-brainer.
I think that commercial tower is going to be a drag on their finances until they can get it leased out and sold. They may still have a construction loan on the commercial tower and it is going to be a big drag if they can’t get it refinanced, which I believe they usually do when the tower is mostly filled up. Perhaps someone in the industry has better insight.
Reply With Quote
     
     
  #173  
Old Posted Dec 5, 2024, 4:29 PM
Sojourner_Terminus Sojourner_Terminus is offline
Registered User
 
Join Date: Oct 2020
Posts: 357
Quote:
Originally Posted by montydawg View Post
I think that commercial tower is going to be a drag on their finances until they can get it leased out and sold. They may still have a construction loan on the commercial tower and it is going to be a big drag if they can’t get it refinanced, which I believe they usually do when the tower is mostly filled up. Perhaps someone in the industry has better insight.
Most likely right. I really hope they can land a decent tenant or two to fill this tower up and sell it off to someone.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast > Atlanta
Forum Jump



Forum Jump


All times are GMT. The time now is 5:28 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.