HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Aug 16, 2024, 7:27 PM
chowhou's Avatar
chowhou chowhou is offline
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,655
Quote:
Originally Posted by Migrant_Coconut View Post
It's also half the distance of the Langley extension (I don't think many people realize that Surrey-Langley effectively doubles the Expo Line), and we know how much that one costs.
Yes, but Surrey-Langley is primarly going through forests and farmland, along a generally free existing RoW (Fraser Highway).

Phibbs-Metrotown needs a bridge along with some non-trivial amount of tunnelling, which, rule of thumb, should be around double the cost of elevated rail.

Double the length does not always mean double the price.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:35 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.