Quote:
Originally Posted by Migrant_Coconut
It's also half the distance of the Langley extension (I don't think many people realize that Surrey-Langley effectively doubles the Expo Line), and we know how much that one costs.
|
Yes, but Surrey-Langley is primarly going through forests and farmland, along a generally free existing RoW (Fraser Highway).
Phibbs-Metrotown needs a
bridge along with some non-trivial amount of tunnelling, which, rule of thumb, should be around double the cost of elevated rail.
Double the length does not always mean double the price.