  #2041  
Old Posted Dec 14, 2023, 12:30 AM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,105
Cable stays will start to be installed in the next few weeks.

https://twitter.com/pattulloproject/status/1734997531786969340
Reply With Quote
     
     
  #2042  
Old Posted Dec 14, 2023, 2:05 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,558
Pic from the twitter December 12th:


In this photo, you can see all 7 bridge piers in Surrey, the south abutment, and girders installed over Hwy 17.
Girder installations will continue over all piers to form the bridge deck.

https://twitter.com/pattulloproject/status/1734695166240547144

From twitter December 5th:


In the foreground you can see pier N2 and in-river pier N1. In the background you can see the main bridge tower.
26 of 33 segments of the main bridge tower are now complete!

https://twitter.com/pattulloproject/status/1732098469949481361
Reply With Quote
     
     
  #2043  
Old Posted Dec 14, 2023, 2:44 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,016
Quote:
Originally Posted by officedweller View Post
Based on this pic, it looks like the cut-over area (Surrey side) will be on dirt, so that would provide some flexibility on temporary lane allignments.
Quote:
Originally Posted by madog222 View Post
They'll probably do it in stages.
-connect new EB lanes.
-shift EB traffic to new bridge.
-deconstruct old EB lanes and connect new WB lanes in their place.
-shift WB traffic to new bridge.
ah ok thanks for the info
__________________
belowitall
Reply With Quote
     
     
  #2044  
Old Posted Dec 17, 2023, 11:05 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,771
2023-12-16

Untitled by Lexus LX600, on Flickr

Untitled by Lexus LX600, on Flickr

Untitled by Lexus LX600, on Flickr
Reply With Quote
     
     
  #2045  
Old Posted Dec 17, 2023, 11:09 PM
osirisboy's Avatar
osirisboy osirisboy is online now
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,429
It would be nice if they could finish the tower nicely but for some reason we always leave them looking like shit
Reply With Quote
     
     
  #2046  
Old Posted Dec 18, 2023, 7:46 AM
Vantage's Avatar
Vantage Vantage is offline
Registered User
 
Join Date: Jan 2014
Location: Port Coquitlam, BC
Posts: 503
First piece of bridge deck structure going in it looks like
__________________
Vancouver born and raised | My Flickr
Reply With Quote
     
     
  #2047  
Old Posted Dec 25, 2023, 4:33 AM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,771
2023-12-23

Untitled by Lexus LX600, on Flickr

Untitled by Lexus LX600, on Flickr
Reply With Quote
     
     
  #2048  
Old Posted Jan 7, 2024, 4:29 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,771
2024-01-06

Untitled by Lexus LX600, on Flickr

Untitled by Lexus LX600, on Flickr

Untitled by Lexus LX600, on Flickr

Untitled by Lexus LX600, on Flickr

Untitled by Lexus LX600, on Flickr

Untitled by Lexus LX600, on Flickr
Reply With Quote
     
     
  #2049  
Old Posted Jan 8, 2024, 3:18 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,928
Thanks a bunch for the pics!
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #2050  
Old Posted Jan 8, 2024, 3:48 AM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,308
It’s crazy how the first render released to the public didn’t even have shoulders on the bridge deck
Reply With Quote
     
     
  #2051  
Old Posted Jan 8, 2024, 7:21 AM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,105
Quote:
Originally Posted by libtard View Post
It’s crazy how the first render released to the public didn’t even have shoulders on the bridge deck
Are you seriously complaining that a highly conceptual render is highly conceptual?
Reply With Quote
     
     
  #2052  
Old Posted Jan 9, 2024, 2:28 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,928
So, I'm guessing that in order to completed the southbound offramp to SFPR westbound the old Pattullo will need to be closed and have that section removed?

Pic from MOT.

Pattullo Bridge Replacement Project-Aerial by B.C. Ministry of Transportation and Infrastructure, on Flickr
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #2053  
Old Posted Jan 9, 2024, 3:05 AM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,771
I was thinking the same thing. I guess it will happen after the new bridge will be partially open…
Reply With Quote
     
     
  #2054  
Old Posted Jan 9, 2024, 3:26 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,558
Quote:
Originally Posted by Metro-One View Post
So, I'm guessing that in order to completed the southbound offramp to SFPR westbound the old Pattullo will need to be closed and have that section removed?

Probably.
Could depend on the width of the ramp and the spacing of the old bridge supports.
It looks like it join SFPR before the railway.


https://www.pattullobridgereplacement.ca/newsandinfo/renderings-maps/
Reply With Quote
     
     
  #2055  
Old Posted Jan 9, 2024, 4:01 AM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,105
The construction schedule does have that part opening halfway through demo of the existing bridge, looks to be about 4-6 months after the new bridge opens to traffic.
Reply With Quote
     
     
  #2056  
Old Posted Jan 9, 2024, 4:06 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,928
Okay, that makes sense.

Quote:
Originally Posted by officedweller View Post
Probably.
Could depend on the width of the ramp and the spacing of the old bridge supports.
It looks like it join SFPR before the railway.


https://www.pattullobridgereplacement.ca/newsandinfo/renderings-maps/
It looks like it will go over the railway, you can see one of the pillars for it in the bottom left corner of the image right next to the railway.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #2057  
Old Posted Jan 9, 2024, 5:28 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,558
Quote:
Originally Posted by Metro-One View Post
It looks like it will go over the railway, you can see one of the pillars for it in the bottom left corner of the image right next to the railway.
I was wondering about that.
That makes sense.
SFPR ducking under the railway is awful there.
Are there plans for SFPR to go over the railway?
Reply With Quote
     
     
  #2058  
Old Posted Jan 9, 2024, 7:49 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,781
Quote:
Originally Posted by Metro-One View Post
So, I'm guessing that in order to completed the southbound offramp to SFPR westbound the old Pattullo will need to be closed and have that section removed?

Pic from MOT.
In the photo the last elevated span of the existing bridge is the lighter coloured pavement - the small bit of darker pavement you can see just at the lower left corner of the photo is on an embankment. You can see the pedestrian stairs leading down from the end of the embankment to the ground level beneath the bridge.

The obvious way to transition traffic to the new bridge will be to widen the north side of the existing embankment to the level of the new elevated section and then pave it and move the traffic over to it. That can all be done without touching the old elevated sections. Once that's done, they can start removing the old elevated sections, and probably the south side of the embankment as well.
Reply With Quote
     
     
  #2059  
Old Posted Jan 9, 2024, 9:17 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,558
Quote:
Originally Posted by aberdeen5698 View Post
The obvious way to transition traffic to the new bridge will be to widen the north side of the existing embankment to the level of the new elevated section and then pave it and move the traffic over to it. That can all be done without touching the old elevated sections. Once that's done, they can start removing the old elevated sections, and probably the south side of the embankment as well.
The comment was about the offramp to SFPR, on this alignment:

Reply With Quote
     
     
  #2060  
Old Posted Jan 9, 2024, 1:42 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,781
Quote:
Originally Posted by officedweller View Post
The comment was about the offramp to SFPR, on this alignment:
Ah, my bad. Well there's no offramp today, so I guess everyone will have to live with the current situation until at least part of the old approach has been demolished.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:03 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.