HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Nov 7, 2023, 10:08 PM
scottN scottN is offline
Registered User
 
Join Date: Mar 2019
Posts: 286
Quote:
Originally Posted by nname View Post
On the discussion guide, they say the capacity at opening day is 3000pphpd. With each cabin of 30 passengers, that means one cabin departs every 36s.

The ultimate capacity is 4000pphpd, not sure if it's achieved by more cabins or fit more people into the cabin. If each cabin still holds 30 passengers, this means a cabin will depart every 27s.
Ultimate capacity of 2.2X the current service level seems pretty low. Even the much maligned canada line has an ultimate capacity that is 3x higher than what it opened with. What's the game plan once the capacity gondola is full? A second gondola?
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:04 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.