Quote:
Originally Posted by Changing City
1999 was when the City report was published, but it's referencing back to the early 1990s. Assuming it's correct, presumably there was no reason why an elevated transit station couldn't have been light rail, rather than SkyTrain? I think they were looking at all the options for both routes.
|
Yeah, the map above shows the Arbutus option, too, but the opposition was stirred by just the elevated possibility on Cambie.