Posted Jan 25, 2022, 4:03 AM
|
|
BANNED
|
|
Join Date: Apr 2014
Posts: 10,743
|
|
Quote:
Originally Posted by Migrant_Coconut
They didn't need to ensure anything, because SkyTrain is a drop in the bucket energy-wise: 141 GWh total in 2019, and the Broadway extension adds maybe another 10-20. Retiring ICE is a problem. Trains are not.
|
What is the total GWh for BC's production?
|