HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Sep 10, 2020, 1:00 AM
GoTrans GoTrans is offline
Registered User
 
Join Date: Jan 2010
Posts: 695
Quote:
Originally Posted by roger1818 View Post
That certainly fits in well with the Downs–Thomson paradox. As Truenorth00 says though, this won't become an issue on the vast majority of the Trans-Canada Highway for a very long time.

Having said that, there is a big difference between twinning a highway and widening it for increased capacity. Two lane highways can be dangerous and all you need is one slow farm vehicle to cause all sorts of problems that aren't really congestion related. Once you have a 4 lane highway, we should be looking for transit related solutions to congestion issues before further widening the highway.
The problem is that governments like to do the incremental approach. As a result you can't currently stop highway expansion. The rail network needs more massive amounts of investment. We suffer from main lines that don't have enough double track to maintain a reasonable speed for passenger trains and branch lines that don't have enough freight or passenger traffic to recover capital investments on a commercial basis. We cut back passenger services that once had multiple daily service so the quality of the line is downgraded and allowed to degenerate so that it almost requires total rebuilding. Provinces only build roads and the federal government builds nothing.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 8:16 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.