From the project twitter today:


This is a close-up of the main bridge tower’s lower crossbeam, where large steel pieces are being installed to form the “pier table.”
Once the pier table is completed, crews can begin installing steel beams and concrete deck panels outward from the bridge tower.

https://twitter.com/pattulloproject/status/1750580230438134055
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:54 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.