View Single Post
  #205  
Old Posted May 13, 2026, 2:00 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,276
Quote:
Originally Posted by BlueJay View Post
Those forms are being replaced with different fly forms that will be used for the remainder of the tower after the pool floor is poured. With the removal of the forms, that is allowing the pre cast install to complete the hotel portion in the meantime. Crane swap is still happening at the end of May.
Thanks for the insight. Much appreciated!
Reply With Quote