Quote:
Originally Posted by BlueJay
Those forms are being replaced with different fly forms that will be used for the remainder of the tower after the pool floor is poured. With the removal of the forms, that is allowing the pre cast install to complete the hotel portion in the meantime. Crane swap is still happening at the end of May.
|
Thanks for the insight. Much appreciated!