Form walls on East and South braced. Form walls on North being installed.
Starting on elevated rebar level at top of piers
New conduit work along Guadalupe in trench above and left of the 3rd crane base
I'll be out of town till the 31st, so no more updates for me for 2 weeks. Somebody post a pic of the mat pour if you can.