HeiTech Padu inks JV agreement to construct next-gen data centre in Shah Alam
Ahmad Naqib Idris March 05, 2021 18:38 pm +08
Quote:
KUALA LUMPUR (March 5): HeiTech Padu Bhd has entered into an unincorporated joint venture (JV) agreement with Regal Orion Sdn Bhd (RO) for the construction of a Tier IV data centre at an unused portion of land owned by the former in Shah Alam, Selangor.

RO, which is involved in engineering, construction and project management, specifically in the data centre development sector, previously bought over a data centre project at Techpark @ Enstek in Labu, Seremban, Negeri Sembilan.

The JV project entails the proposed construction, commissioning and testing of the Tier IV data centre, which comprises a five-storey building with racks to be tenanted upon completion by international or multinational tenants or occupiers.
https://www.theedgemarkets.com/artic...ntre-shah-alam
Reply With Quote
     
     
  #22  
Old Posted Apr 29, 2021, 10:17 PM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 873
Klang



Ramsay Sime Darby Health Care acquires Manipal Hospitals, Klang
By Farah Adilla
April 9, 2021 @ 10:41am



Manipal Hospitals, Klang

Quote:
KUALA LUMPUR: Ramsay Sime Darby Health Care (RSDH) is acquiring entire stake in Manipal Hospitals, Klang from Manipal Health Enterprises Pvt Ltd (MHEPL).

RSDH group chief executive officer Raymond Chong in a statement today said the acquisition allows the company to leverage on a strategic opportunity to unlock more value operationally by expanding reach to deliver its distinctive brand of award-winning healthcare.

The acquisition will see the rebranding of the 220 bed capacity hospital into a tertiary care private facility which geographically complements RSDH's other healthcare facilities.

With the acquisition, RSDH owns four hospitals in Malaysia.

The hospitals under the company currently include Subang Jaya Medical Centre, Ara Damansara Medical Centre and ParkCity Medical Centre.


Accredited with the Malaysian Society for Quality in Health (MSQH), Manipal hospital currently equipped with five operating theatres as well as 15 cardiology or coronary care unit (CCU) and intensive care unit (ICU) beds.

It also has a 1.5T magnetic resonance imaging (MRI) scanner, catheterisation laboratory and 24-hour emergency service, among others.

The seven-storey hospital building occupies a built-up area of 362,000 sq ft with more than 300 car park bays.
https://www.nst.com.my/business/2021...ospitals-klang
Quote:
Ramsay Sime Darby (50:50 Malaysia/Australia joint venture)
https://www.ramsaysimedarby.com/

Reply With Quote
     
     
  #23  
Old Posted Apr 29, 2021, 10:31 PM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 873
Cyberjaya, Sepang



Telekom Malaysia to expand data centre space
By Nuradzimmah Daim and Farah Adilla
April 12, 2021 @ 4:39pm



Klang Valley Core Data Centre (KVDC) in Cyberjaya
Quote:
CYBERJAYA: Telekom Malaysia Bhd (TM) plans to expand its data centre space based on the demand by its clients both from the public and private sectors.

TM group chief executive officer Imri Mokhtar said there was still vacant areas surrounding its Klang Valley Core Data Centre (KVDC) in Cyberjaya, but the company was also eyeing on land outside the area.

It also owns the Iskandar Puteri Core Data Centre (IPDC) in Johor, with 350,000 sq ft in gross floor area.

Currently, the occupancy for both KVDC and IPDC is more than 50 per cent and there is a need for expansion to meet the demand.

Imri said based on the current take up rate of TM's data centre solutions, it foresees high demands for data storage from customers, both domestic and international.

Besides that, he said TM One's world-class Uptime Institute Tier III certified KVDC would undergo a capacity expansion by December 2021, to further provide support to the MyDigital initiative.

To date, all TM One Data Centres are built with the focus on being carrier-neutral facilities with green building design, highly interconnected networks, high availability and security, while ensuring compliance with Malaysia's data residency laws and industry-specific regulations.
https://www.nst.com.my/business/2021...a-centre-space

Last edited by nazrey; Apr 29, 2021 at 10:43 PM.
Reply With Quote
     
     
  #24  
Old Posted May 1, 2021, 1:27 PM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 873
Subang Airport, Petaling Jaya



MAHB's RM1.3bil regeneration of Subang Airport
By Ayisy Yusof April 20, 2021 @ 9:32am



Quote:
SEPANG: Malaysia Airports Holdings Bhd (MAHB) is eyeing a total investment of about RM1.3 billion to regenerate Subang Airport into "more than just a city airport".

MAHB subsidiary KLIA Aeropolis Sdn Bhd general manager Randhill Singh said the investment was on the card as the airport operator would want to generate greater yields from leasing its facilities within the ecosystem.

Randhill said the initial development for the masterplan would begin in early 2022 with the setting up of two MRO facilities slated to be operationalised by 2023.

"The MRO facilities are for helicopter, light aircraft and business jets in Subang Airport. We will announce the two MRO players under a few agreements that will be signed in the coming months," he said.

Randhill said the investment would be mainly for lettable building facilities such as hangar, factories, aerospace manufacturing plants and MRO.

"Upon completion, we will have about 8.0 million sq ft in additional capacity (space) for airside, landslide and common infrastructure facilities," he added.

Randhill said the masterplan development would cover about 250 acres out of the total 400 acres available for industrial development.

This in turn was expected to generate about RM5 billion in economic output in the next five years, he added.

"Currently, we have developed about 60 acres, representing 25 per cent of the total development of 250 acres. We expect a payback in 10 years for the whole development.
https://www.nst.com.my/business/2021...subang-airport
Reply With Quote
     
     
  #25  
Old Posted May 5, 2021, 11:59 PM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 873
Petaling Jaya + Shah Alam



TOLL EXPRESSWAY
DASH (Damansara-Shah Alam)
20.1 km






@ Hafiz Dash



@ Hafiz's Drone
Reply With Quote
     
     
  #26  
Old Posted May 6, 2021, 12:12 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 873
Ampang + Kajang



TOLL EXPRESSWAY
EKVE (East Klang Valley Expressway), part of Kuala Lumpur Outer Ring Road
36.16 km
https://www.theedgemarkets.com/artic...s-spokesperson








@ SZ-eagle Eye Studiors
Quote:

Last edited by nazrey; May 6, 2021 at 1:19 AM.
Reply With Quote
     
     
  #27  
Old Posted May 6, 2021, 12:59 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 873
Kuala Lumpur



TOLL EXPRESSWAY
SUKE - Sungai Besi-Ulu Kelang Elevated Expressway (2022)
31.18 km




Last edited by nazrey; May 6, 2021 at 1:19 AM.
Reply With Quote
     
     
  #28  
Old Posted May 6, 2021, 1:09 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 873
Kuala Lumpur



TOLL EXPRESSWAY
SPE - Setiawangsa-Pantai Expressway (2022)
32 km


Source: WanFly Studio
Reply With Quote
     
     
  #29  
Old Posted May 6, 2021, 1:33 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 873
Putrajaya + Sepang



TOLL EXPRESSWAY
MEX II - Maju Expressway Phase 2
18 km


@SZ-eagle Eye Studiors


Reply With Quote
     
     
  #30  
Old Posted May 6, 2021, 2:12 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 873
Kuala Lumpur



Gombak Integrated Transport Terminal
COMPLETING SOON 2021
  • LRT KJ Line (line 5) - terminated station
  • East Coast Peninsular Intercity Bus hub
  • RapidKL bus


@SCM

@SCM

Last edited by nazrey; May 6, 2021 at 2:48 AM.
Reply With Quote
     
     
  #31  
Old Posted May 6, 2021, 10:10 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 873
Petaling Jaya + Shah Alam + Klang



THIRD LIGH RAIL TRANSIT (LRT) SYSTEM - 2024
Line 11 - Johan Setia Line (the first metro line outside KL) - 37 km









Reply With Quote
     
     
  #32  
Old Posted May 6, 2021, 1:54 PM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 873
Selayang + Kuala Lumpur + Kajang + Sepang + Putrajaya



SECOND MASS RAPID TRANSIT SYSTEM
Line 12 - Putrajaya Line - 57.7 km
PHASE 1 (JULY 2021)
  • Damansara Damai
  • Sri Damansara Barat
  • Sri Damansara Sentral
  • Sri Damansara Timur
  • Metro Prima
  • Kepong Baru
  • Jinjang
  • Sri Delima
  • Kampung Batu
Damansara Damai


https://www.mymrt.com.my/project-upd...sara-damai-28/

Sri Damansara Barat


https://www.mymrt.com.my/project-upd...sara-barat-10/

Sri Damansara Sentral


https://www.mymrt.com.my/project-upd...ara-sentral-8/

Sri Damansara Timur - INTERCHANGE WITH LINE 1 + KTM ETS


https://www.mymrt.com.my/project-upd...nsara-timur-4/

Metro Prima


https://www.mymrt.com.my/project-upd...etro-prima-19/

Kepong Baru


https://www.mymrt.com.my/project-upd...epong-baru-24/
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > Malaysia
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 4:59 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2021, vBulletin Solutions, Inc.