Posted Jan 24, 2023, 11:39 PM
|
 |
Registered User
|
|
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 18,518
|
|
Salt Lake City & MSA/CSA Rundown
Downtown's New Post District Taking Shape - Construction Timeline
Quote:
Originally Posted by scottharding
September 11, 2021...And I drove by the Post District today, and now that it's shaping up, it strikes me how huge that project is. It's going to be incredible.
|
Quote:
Originally Posted by Orlando
|
GALE STREET APARTMENTS
Salt Lake City, UT
Lowe Property Group & Q Factor
5 buildings | 580 units | 461,921 sf residential | 26,833 sf retail
This mixed-use project consists of five buildings with 580-units and 26,833 sf of retail within Type IIIA over Type IA construction. Located in the D-2 downtown area of Salt Lake City, this project will be a catalyst for fostering the development of a sustainable urban neighborhood. The five buildings of new construction are sited to retain existing adaptive-reuse structures to create the “complete block” of old and new. The design promotes a
pedestrian-oriented development with a strong emphasis on scale in an urban context.
Salt Lake City, UT | July 30, 2020 - https://www.cbre.us/people-and-offic...-reuse-project
The Salt Lake City office of CBRE has been selected to oversee leasing of the A&Z Building, the former home of A&Z Produce and adaptive reuse project in The Post District, a $300 million master-planned neighborhood development. Scott
Wilmarth, Nadia Letey and Melina Miramontes will oversee the office leasing requirement.
The A&Z Building is a three-story office building with a garden level, totaling approximately 36,000 square feet. Renovations are already underway, and the building should be ready for occupancy in September of this year. The renovation
transforms an old produce building into a space that unites the historic nature of the structure with a modern aesthetic, featuring exposed brick and beam finishes. The A&Z Building will share an above-grade parking structure with an
adjacent building and has a surface lot that can facilitate additional future phases of development.
"The Post District is a timely development that will redefine the western perimeter of downtown's Central Business District, and the A&Z Building is the first step in this paramount undertaking" noted Nadia Letey, first vice president of CBRE.
"Careful consideration has been taken in the master plan to ensure that the needs of the neighborhood and local businesses have been addressed, including space for housing, retail, and local artist installations in addition to the planned
office space."
The A&Z Building is part of The Post District, a major renovation in the area that aims to revitalize a 14-acre region bordering downtown's Central Business District. The Post District is a $300 million master-planned neighborhood development
with 580 new residential units and over 300,000 square feet of new and redeveloped commercial space providing creative office, walkable restaurants, cafes, shops, open green space, public plazas and more. The initial office developments
are taking place on the southern block of 500 South spanning from 300 West to 400 West.
Interior Photos of the A to Z restoration
April 2021
Kim Raff for the Wall Street Journal
June 13, 2021
Quote:
Originally Posted by SLC PopPunk
Here is the Post District. Mostly doing foundation work, but some framing has started.
|
Photos By SLC PopPunk
August 2, 2021
Photo By Luke Garrott of BuildingSaltLake.com
September 16, 2021
Photo By Reeder113
September 26, 2021
Photos By Blah_Amazing
December 2021
Quote:
Originally Posted by Atlas
|
Photos Courtesy of MVE Architecture
February 16, 2022
Quote:
Originally Posted by bob rulz
Some more photos of the Post District for good measure. I love the way it's filling in this area!
|
.
Last edited by delts145; Jan 30, 2023 at 11:48 AM.
|