HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
     
     
  #1  
Old Posted Jun 17, 2019, 6:11 AM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is offline
Registered User
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 5,335
Winnipeg Construction X

Winnipeg Construction X



Courtesy of Dan Harper Photography

Previous construction threads:
Winnipeg Construction 9
Winnipeg Construction 8
Winnipeg Construction 7
Winnipeg Construction 6
Winnipeg Construction 5
Winnipeg Construction 4
Winnipeg Construction 3
Winnipeg Construction 2
Winnipeg Construction 1


Winnipeg Developments


True North Square (Phase 1 complete, 17 floor Scotia Bank Tower & 25 floor retail, boutique office & residential tower)
Location: 242 Hargrave St, Winnipeg, MB
Developers: True North Real Estate Development Limited, True North Sports and Entertainment, James Richardson & Sons Limited, Northland Properties
Architect(s) : Perkins+Will in association with Architecture 49
Construction Manager: PCL Constructors Canada Inc
Completion: 2023
Size: 1.5M+ square feet
Project Type: office, retail, residential, hotel
Cost: $650 M+
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: U/C

True North Square Phase 2:
Sutton Place Hotel & Residences at True North Square
18-storey hotel tower, 13-storey La Grande Residences on 4-storey podium of retail & parking
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=130
Video Link


Aug 2021:
[img][/img]

True North Square Phase 3:
Wawanesa Mutual Insurance North American HQ
Location: 372 Graham Avenue and 236 Carlton Street, Winnipeg, MB
Developer: True North Real Estate Development (TNRED) & The Wawanesa Insurance
Architects: Architecture49
Contractor: PCL Constructors Inc
Status: Under Construction
Media: Wawanesa moving to new office tower at True North Square
Documents: http://clkapps.winnipeg.ca/DMIS/View...ctionId=576525
Project Thread: http://skyscraperpage.com/forum/showthread.php?t=245822

Aug 2021:


300 Main Street Apartment Tower
Location: 300 Main Street
Developers: Artis REIT https://300main.ca/
Architect: Raymond SC Wan Architects http://raymondscwanarchitect.com/300-main/
Floors: 42
Height: 465' | 142M
Phase 1: Reclad existing tower at 360 Main (complete)
Phase 2: Residential highrise (under construction)
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: U/C
Video Link


October 2020:


Canada's Diversity Gardens
Location: Assiniboine Park Winnipeg, MB
Developers: Assiniboine Park Conservancy
Architect(s) : KPMB (Design Architect) in association with Architecture 49
Completion: 2020
Size: 84,400 s.f.
Project Type: Cultural
Cost: 97.5M
Status: U/C
Description: 21st century botanical conservatory situated at the head of an existing Formal Garden at Assiniboine Park designed for LEED Silver Certification. It will be a signature piece of architecture that generates awareness and a presence in the park, an interactive destination that focuses on the interrelationships of plants and people, and a sustainable precedent focussing on horticulture, plants and the environment.
Fact: Main structure 'The Leaf' will be made of an extremely lightweight see-through plastic Ethylene tetrafluoroethylene (ETFE) and will contain the largest indoor waterfall in canada at 6-storey in height.
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Video Link


Nov 2020:


Red River College - Innovation Centre Exchange District Campus
Location: Location: 319 Elgin Avenue, Winnipeg, MB, Downtown Exchange District Campus
Architect: Diamond Schmitt Architects inc. and Number TEN Architectural Group
Developers: Red River College
Size: 100,000 sq. ft.
Budget: $95M
Completed: 2020 (targeted)
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: U/C
Video Link


Sept 2020:


James Ave Pumping Station Redevelopment
Location: 109 James Avenue, Winnipeg, MB
Developers: ALSTON PROPERTIES LTD.
Architect(s) : 5468796 Architecture Inc
Status: U/C
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=223833
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=122
Phase 1: 18,600 SF of office/retail space in the James Ave Pumping Station Building. Slated for demolition after 17 attempts to revive the historic structure over the last 14 years, the James Avenue Pumping Station was successfully preserved through the development of a financial / building pro forma that would make it financially feasible. 100% leased. Spring 2018 occupancy.
Phase 2: 28 high end rental apartments on Waterfront Drive available spring 2020.

Sept 2020: (Phase 2)

Phase 3: 65 rental apartments. Winter 2021 occupancy.

Nov 2020 (Phase 3):


OSBORNE PLACE AT THE STATION (Phase 2)
Location 265 Osborne St
Developer: Imperial Properties Winnipeg https://www.imperialproperties.ca/ou...SACEgKo_vD_BwE
Architect: DIN Projects http://www.dinprojects.ca/#http://ww...o/257-osborne/
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=220693
Status: On Hold



Osborne 380
Location: 380 Osborne
Developer:
Architect: DIN Projects
Status: U/C
Media: Infill apartment block planned for 380 Osborne
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...7&postcount=81
Description: 7-storey residential mixed use building with 71 dwelling units and one commercial spac ewith two levels of indoor parking, one underground and one at grade



The Arc Phase 1
Location: Location: 2525 Pembina Hwy , Winnipeg, MB
Architect: Architects + Research + Knowledge, Inc.
Developer: Campus Suites
Size: 352-unit, 16-storey multi-family building
Completion date: Unknown
Budget: $70 M
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=236081
Status: U/C
Renderings & Construction pics: http://forum.skyscraperpage.com/show...1&postcount=91
Description: 570 bed mixed-use student housing community in phase 1, phase 2 under development
http://clkapps.winnipeg.ca/DMIS/View...ctionId=493074
Video Link


Phase 2: Phase 2: The current proposed building (phase 2) is approximately 60 meters tall (18 storeys plus a mechanical penthouse). This will be able to provide 432 Residential units that will vary between 1, 2 and 4-bedrooms. One major feature will be the commercial/retail uses on the main floor of the building, similar to the Arc (2525 Pembina) development. Please note that building details may change based on feedback received throughout the engagement process


281 River Ave
Location: 281 River Ave, Winnipeg, MB
Architect: BLDG architecture office inc.
Developer: Towers Realty Group
Size: five-storey, 100-unit residential complex
Status: Proposed


Royal Aviation Museum of Western Canada
Location: Winnipeg Airports Authority campus on Wellington Avenue
Developer: Royal Aviation Museum of Western Canada
Architect(s): Architecture 49
Budget $45 million
Size 86,000 sf
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=101
Media: Ottawa set to announce $8.8 million for the Royal Aviation Museum
Video Link


May 2021:


Market Lands (2 phases)

Phase 1:The ‘New Market Square’
Location: 151 - 171 Princess Street
Developer: CentreVenture Development Corporation & Winnipeg Housing Rehabilitation Corporation
Architect: Daoust Lestage https://daoustlestage.com/en/project/market-lands/
Status: Demolition complete; RFP issued
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=110
Description: Redevelopment site of former Public Safety Building and civic parkade in The east Exchange District

October 2020:


98 Albert street
Location: 90 Albert St & 98 Albert street Winnipeg, MB
Developer: Unknown
Architect(s) : AtLRG Architecture Inc.
Status: U/C
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=119
Description: 3-storey wedge, main floor restaurant space with future sidewalk patio, 2 prestige residential units and rooftop terrace with garden


31 Riel Ave
Address: 31 Riel Ave street Winnipeg, MB
Location: https://www.google.com/maps/place/31...!4d-97.1163212
Developer: http://www.trademarkbuilders.ca/ https://www.instagram.com/trademarkbuilders/
Architect: https://www.atlrg.ca/
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=121
Description: A four-storey, 82 suite residential building with ground floor commercial suites complete with underground parking. The gable roof extends the amount of liveable space with the inclusion of brightly-lit mezzanine space for the forth floor suites, while also providing a distinctive identity to the local multi-family housing typology.


238 wellington crescent
Address: 238 wellington crescent Winnipeg, MB
Location: https://www.google.com/maps/place/23...67!4d-97.15065
Developer: http://trademarkbuilders.ca
Architect: http://www.5468796.ca/
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=123
Description: Infill development in a mature Winnipeg neighbourhood is starting construction. Six units replacing a single house on Wellington in Osborne.


Smith Street Lofts
Location: 185 Smith St Winnipeg, MB
Developer: Edison Properties
Architect(s) : MMP Architects Inc.
Construction Manager: Akman Construction Ltd.
Status: U/C
Project Thread: https://forum.skyscraperpage.com/sho...d.php?t=240240
Description: Former social housing complex being retrofitted to mix of 250 market-rate rentals and affordable units, renovations expected to be completed in 2021
Media: Smith Street tower will 'look like a very different building'

Nov 2020:


Mayfair Tower
Location: 109 Mayfair Winnipeg, MB
Developer:
Architects: Otto Cheng Architect Incorporated
Status: Proposed
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=131
Description: WRE Developments is considering the construction of a 15-storey, 96 unit residential apartment building located at 109 Mayfair across from downtown along the Assiniboine River.
http://landmarkplanning.ca/project/1...air-avenue.php


NewPortCenter Redevelopment
Location: 330 Portage Ave, Winnipeg, MB
Developer: KingSett Real Estate Growth LP No. 6 and CCI Corpfin Capital Acquisition Fund 1 LP
Status: U/C
Renderings & Construction pics: http://skyscraperpage.com/forum/show...8&postcount=93
Description:Lobby renovations, podium refurbishment & exterior reclad




200 Portage Ave.
Location: 200 Portage Ave
Developer: 200 Portage INC. (Carmyn Aleshka)
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...2&postcount=75
Description:Landlord has comprehensive plan to completely renovate 200 Portage, including the main floor and concourse space, redevelopment plans include upgraded floor to ceiling windows giving unprecedented 360° views of Portage and Main and flooding office spaces with natural light. Other upgrades include new curtain wall, doors, lobbies and elevators which will be replaced or upgraded.


201 Portage Avenue lobby renovations
Address: 201 Portage Winnipeg, MB
Developer: Harvard Property Management Inc
Status: U/C



320 River Avenue
Address: 320 River Avenue
Location: https://www.google.ca/maps/@49.88102...7i13312!8i6656
Architects: http://www.prairiearchitects.ca/
Status: Proposed
3-storey multifamily building with 12 units, he development is clad in brick with some corten steel accents, The development locates the parking inside the building


456 Bannatyne Avenue
Address: 456 Bannatyne Avenue
Location:https://www.google.com/maps/place/45...60692329565936
Architects: http://www.h5architecture.ca/
Status: Proposed
(4) storey mixed use building comprising of twenty six (26) residential units above ground and one (1) commercial unit at grade. The existing row housing on site will be removed.


Terrasse Boisjoli
Location: 989 Ducharme Avenue, St. Norbert, Winnipeg,
Developer: https://legatumdevelopment.co/
Architect(s): 5468796 Architecture Inc
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=103
Media: Renaissance underway in St. Norbert, Planned residential complex incorporates elements of Franco-Manitoban architecture
Description: Terrasse Boisjoli is a new 5 storey mixed-use multi-family project consisting of 40 1-and 2-bedroom suites, in-suite laundry, 9ft ceilings, heated indoor parking, and commercial space on the ground floor.

Mar 2021:


The Halo
Location: 2021 Pembina Highway, Winnipeg, MB
Developer: Private Pension Partners
Architects: Affinity Architecture Inc
Contractor: Unknown
Status: U/C
Media: Mystery revealed
Renderings & Construction pics: https://skyscraperpage.com/forum/sho...3&postcount=92
Description: 2 apartment towers 15 and 16 storeys, combined 406 residential units


Address: 139 Notre Dame St
Location:https://www.google.ca/maps/place/139...!4d-97.1253026
Architects: https://www.2architecture.ca/
Status: Proposed


Address: 235 Dumoulin St
Location:https://www.google.ca/maps/place/235...!4d-97.1200569
Architects: https://www.2architecture.ca/
Status: Proposed
2 Storey townhouse, 6 1000 sq2 units


(RESIDENCE LANGEVIN)
Address: 210 rue Masson
Location:https://www.google.ca/maps/place/210...5!4d-97.120443
Architects: https://www.ft3.ca/
Developer: Towers Realty Group
Status: Proposed
Media: https://ici.radio-canada.ca/nouvelle...oniface-projet
60 unit, 4 storey residential. According to the plan, the three facades of the former 1902 Francophone Normal School will be preserved.


Railside Residential Village at The Forks
PDF Storyboard: http://s3.documentcloud.org/document...al-package.pdf
Developer: The Forks North Portage Partnership
Status: Proposed
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=217747
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=108
Description: Railside at The Forks[/B] is a new kind of development and a major step in the evolution of The Forks. Railside represents the first ever opportunity for residential development at The Forks, on two parking lots known as Railside and Parcel 4. Remaining true to The Forks' founding vision, this significant mixed-use project will build on the site's abundant cultural background.



BOXCAR ALLEY at Union Station
Location: Union Station/The Forks, Winnipeg, MB
Developer: The Forks North Portage Partnership
Architects: PUBLIC CITY
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=108
Description: As a part of the Railside Residential Village at The Forks development, The Box Car Alley design playfully highlights the space under the CN rail line at the Forks, a space that is currently under-utilized and overlooked. The project seeks to brighten the peripheries of The Forks, revitalizing an important public space through public engagement, local business promotion and creative opportunities for artists and visitors.


The Forks National Heritage Site Visitor Centre
Location: 45 Forks Market Road, The Forks National Historic Site, Winnipeg, MB
Developer: The Forks North Portage Partnership
Architect(s): 1x1 architecture inc.
Size: 7,653 sq.ft.
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=159
Description: Due to the requirement by Parks Canada to not increase the built form on the protected site, the proposed Visitor Centre is located at the site of the existing orientation node, and will renovate the existing washroom / office building which consists of a circular structure constructed of tyndall stone plinths carrying a wood trellis. A major east-west axis cuts through the National Historic Site. From the west, this axis starts at the dome of Union Station, situated at the end of the Broadway promenade, continues through the centre of the orientation node and culminates at the Saint Boniface Cathedral-Basilica Parish on the east side of the Red River. This axis symbolically connects St. Boniface to Winnipeg’s downtown. The design intent was not only to maintain this axis, but to enhance it, thus the Visitor Centre was split into two buildings.


227 Stafford
Location: 227 Stafford
Developer: Progressive Real Estate
Architects: Affinity Architecture Inc
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=112
Description: Office space proposed for 2nd and 3rd floor, 4 residential units proposed for top floor
Media The Sou'wester Winnipeg Free Press


PRINCESS STREET APARTMENTS
Location 265 Princess St, Exchange District
Developer: Unknown
Architects: VERNE REIMER ARCHITECTURE INCORPORATED
Status: U/C
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=113
Description: 88 Apartment Units


Urban Square
Location: 230 Good Street (West Broadway)
Developer: Iron Clad
Architects:
Status: U/C
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=115
Description: Six storey multifamily residential building with 145 units.
Media: Approval sought for West Broadway complex; Addition of 145 units would ease city's need for new housing, councillor says

Aug 2021:


129 McDermot Avenue
Location: 129 McDermot Avenue, Exchange District
Developer: United Equities Group
Architects: Number Ten
Status: Proposed; Multiple development options available with large floor plate ((+/-) 24,000 SF)
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=118


Portage Place Redevelopment
Location: 393 Portage Ave
Architects: ARK / PETROFF
Developer: Starlight Investments
Status: Development stage
Media: Portage Place to undergo up to $400-M retrofit, multi-income residential towers added
Description: $400m+ retrofit of exisiting mall; two 20-storey rental residential towers with 500 to 550, new shopping, office spaces, and as a pedestrian-friendly courtyard
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=206



Upper Fort Garry Provincial Park Interpretive Centre
Location: Assiniboine Ave
Architects: designed by landscape architects Hilderman Thomas Frank Cram and architects Cohlmeyer Architecture Ltd.
Status: Proposed; Fundraising stage
Description: An interpretive centre, complete with exhibit space, a multi-purpose theatre, food service, a digital library and office space, will be the final piece within the park.


ZÜ
Location: 160 Osborne St
Developer: Private Pension Partners
Architect(s) : BLDG architecture office inc.
Status: Development stage
Construction Manager: Pre-Con Builders
Construction Pics: https://forum.skyscraperpage.com/sho...&postcount=139
Project Thread: https://forum.skyscraperpage.com/sho...d.php?t=240379
Description: 3 new buildings at the site of the (soon to be demolished) Osborne Village Inn. All three buildings will have covered and underground parking with 207 apartment suites across two lots, a total of 54,110-square-feet and about 14,000 square feet of combined commercial space at street level.
Media: Redevelopment of Osborne Village Inn passes first test
Video Link

  • 160 Osborne St, a six-storey,mixed-use, multi-family apartment building with 89 units
  • 424 and 425 Wardlaw Ave. two four-storey, mixed-use, multi-family complexes with 59 units each


Vue Taché
Location: 780 Taché Ave, (North St. Boniface)
Developer: StreetSide Developments
Architect(s) : 701 Architecture Inc.
Status: Development stage
Construction Manager: Unknown
Renderings & Construction pics: http://skyscraperpage.com/forum/show...&postcount=231
Description:StreetSide Developments is currently developing a 7-storey, concrete multi-family rental building, featuring approximately 87 units and underground parking across from Parc Elzéar Goulet in old St. Boniface.


FORTWHYTE ALIVE EXPANSION
Location: 2505 McGillivray Blvd
Developer: FortWhyte Alive Outdoor Adventure Center
Architect(s): Unknown
Status: Proposed - Construction is slated to begin late 2019
Construction Manager: Unknown
Description: Funding will support FortWhyte Alive in two extensive improvement projects:
  • The renovation of one of FortWhyte Alive’s key facilities – a deep energy retrofit and interior renovation of the iconic 35-year old Interpretive Centre.
  • The construction of a new facility, Buffalo Crossing – an 18,000 square foot multi-purpose building that will serve as a new southern gateway to FortWhyte from McGillivray Blvd. and a hub for new and creative outdoor recreation and education.


Gregg Building (Residential Conversion)
Location: 52 Albert Street, Winnipeg, MB
Developers: Knysh Construction
Status: U/C
Media: 'Rock-solid' reincarnation
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=140
Description: Unoccupied for over a decade plans are to keep the first two floors as commercial space, while floors three, four, and five will be potentially converted into 16 residential spaces.


Cornish Library (ADDITION AND RENOVATION)
Location: 20 WestGate, Winnipeg, MB
Developer: City of Winnipeg
Architects: PUBLIC CITY
Cost: $2.8M
Status: U/C, Summer 2020 opening
Media: Cornish Library closes for upgrades
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=154
Description: Renovations to 104+ year old heritage building include accessible entrance and washroom, complete redesign of spaces with adult, children's and teen areas on main floor, a computer area, and study and leisure spaces. An addition to the south of the building will feature an inviting glass reading room, overlooking both the gardens and riverbank, providing an intriguing view from Sherbrook Street to the northwest.


Mar 2021:


216 Sherbrook
Location: 216 Sherbrook St, Winnipeg, MB
Developer(s): Almaleki Developments Inc
Architect(s): 701 Architecture Inc.
Construction Manager: Ross Construction Limited
Status: Unknown
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=164
Description: 216 Sherbrook will be a mix use project featuring 24 stunning, luxurious apartments with incredible amenities like a rooftop terrace, top