Quote:
Originally Posted by Skintreesnail View Post
Could be something like a plot that would be generated by some machine learning algorithm or some other data visualization
Yeah, that too. Or could just be some meaningless abstract design.
Reply With Quote
     
     
  #15342  
Old Posted Apr 9, 2021, 1:09 AM
Skintreesnail Skintreesnail is online now
Registered User
 
Join Date: Apr 2006
Posts: 367
Impossible!
Reply With Quote
     
     
  #15343  
Old Posted Apr 9, 2021, 1:12 AM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,232
Reply With Quote
     
     
  #15344  
Old Posted Apr 9, 2021, 2:23 PM
Redddog Redddog is offline
Registered User
 
Join Date: Apr 2016
Location: Philadelphia
Posts: 705
Quote:
Originally Posted by Philly Fan View Post
Ju keep using that word. I do not think that word means what you think it means.
Reply With Quote
     
     
  #15345  
Old Posted Yesterday, 11:52 AM
cardeza cardeza is offline
Registered User
 
Join Date: Dec 2018
Posts: 657
Quote:
Originally Posted by Londonee View Post
There's a difference between a "pothole" and what happens when the Water Department comes in and digs a massive trench the entire length of the block to replace water pipes into newly paved asphalt. Within a few months where the trench was poured is expanding, shrinking, absorbing moisture at a different rate/scale than the original pour next to it. This quickly creates a terribly uneven road surface that will soon begin to fail.

Also beyond "potholes" - what happened on my block was Streets came in and paved, re-striped, re-painted all of the crosswalks and bikelanes beautifully. Then, 2 weeks later - the ADA boys showed up and re-cut all of the curbs and drains to install the ADA pads. The Result? All of the crosswalks were patched over with new asphalt and at every intersection the bikelanes were covered up. Just looks sloppy and patchy. I asked the contractor if they'd touch up the janky crosswalks/bikelane lines. "Absolutely," he said. lol

that is how ADA curb ramps are always done- they arent even done by the same types of crews, its a separate part of the project and if it is done properly there is no detrimental impact on the asphalt area near the curb ramp. Again, major replacement projects are coordinated with the City and PennDOT to avoid paving a street before a pipe replacement is scheduled. But there is little that can be done to avoid repairs or new construction related connections that are needed in the months or years after a repave job. A utility patch should not lead to a pothole if sealed properly.
Reply With Quote
     
     
  #15346  
Old Posted Yesterday, 11:56 AM
cardeza cardeza is offline
Registered User
 
Join Date: Dec 2018
Posts: 657
Quote:
Originally Posted by TonyTone View Post
And this is the ISSUE RIGHT HERE.

Why the Hell couldn't the ADA Boys come 2 weeks before and get it done before the paving?

It's like when streets are repaved and restriped someone say hey did x block just get repaved and looks good? Ok good send out the boys to dig up the corners and fix it we could have did it before they came but its better after.

No coordination at all in this city.

It's like putting a skyscraper up first and getting to the 50th floor and then going back down into the basement and connecting the water pipes and sewage lines.
This the the contractor's means and methods and to get the slope properly you need a final elevation of the street to be in place. It is done that way for a reason and if you look around you will see properly done curb ramps all over where there is a nearly seamless transition from the area patched near the ramp and the road surface. BEfore you pave a street you have to mill the entire top level surface or wearing course, you could never install a curb ramp in its entirety BEFORE you mill the road surface, you would end up removing all asphalt right up to the curb line and then have to redo that section to ensure proper slope and transition between the edge of the concrete and new pavement.
Reply With Quote
     
     
  #15347  
Old Posted Yesterday, 2:56 PM
City Wide City Wide is offline
Registered User
 
Join Date: Aug 2014
Posts: 1,487
Quote:
Originally Posted by cardeza View Post
that is how ADA curb ramps are always done- they arent even done by the same types of crews, its a separate part of the project and if it is done properly there is no detrimental impact on the asphalt area near the curb ramp. Again, major replacement projects are coordinated with the City and PennDOT to avoid paving a street before a pipe replacement is scheduled. But there is little that can be done to avoid repairs or new construction related connections that are needed in the months or years after a repave job. A utility patch should not lead to a pothole if sealed properly.
Should and what reality shows are often different.
One practice here in Philly (elsewhere?) is the party making the opening is not responsible for returning the street to a finished state. (except PGW) They backfill the hole, throw a cold patch on it, and that's all folks. The City counts on vehicles driving over the patch to provide further compacting of the soil in the hole. Then after X amount of time the City comes along, digs out a foot or so, then first pours a new concrete patch, then a couple days later does the final asphalt. I think a big part of the problem is the new concrete is not tied into the old concrete, so it floats. As traffic continues to compress the hole, if it wasn't packed correctly to begin with, the whole patch begins to sink, and in a week or so, another you have a problem.
Reply With Quote
     
     
  #15348  
Old Posted Yesterday, 6:20 PM
CleetMcDougle CleetMcDougle is offline
Registered User
 
Join Date: Dec 2020
Posts: 12
Small update on this one: http://www.rising.realestate/64-unit...de-kensington/

The existing building is gone
Reply With Quote
     
     
  #15349  
Old Posted Yesterday, 8:39 PM
cardeza cardeza is offline
Registered User
 
Join Date: Dec 2018
Posts: 657
does anyone know what is slated for the lot (4414 ridge) north of the new townhouses that front Ridge and Kelly Drive? Drove past there and equipment is on site clearing the lot and digging up rocks. I don't see any new permits for that lot. Building Permit was just issued for a 5 story building at the long vacant lot at Kelly drive and calumet. Maybe something will happen this time, its been like 10 years since a project was first scheduled for this site.

edit: nevermind this is 4442 ridge ave. Looks like another apt building.
Reply With Quote
     
     
  #15350  
Old Posted Yesterday, 11:17 PM
allovertown allovertown is offline
Registered User
 
Join Date: Sep 2013
Posts: 1,024
Quote:
Originally Posted by cardeza View Post
This the the contractor's means and methods and to get the slope properly you need a final elevation of the street to be in place. It is done that way for a reason and if you look around you will see properly done curb ramps all over where there is a nearly seamless transition from the area patched near the ramp and the road surface. BEfore you pave a street you have to mill the entire top level surface or wearing course, you could never install a curb ramp in its entirety BEFORE you mill the road surface, you would end up removing all asphalt right up to the curb line and then have to redo that section to ensure proper slope and transition between the edge of the concrete and new pavement.
This is perhaps the largest trough of hot nonsense you've ever tried to serve this group.
Reply With Quote
     
     
  #15351  
Old Posted Today, 1:14 AM
TonyTone's Avatar
TonyTone TonyTone is online now
Registered User
 
Join Date: Jan 2020
Location: Tri-State DE-PA-NJ
Posts: 340
Quote:
Originally Posted by allovertown View Post
This is perhaps the largest trough of hot nonsense you've ever tried to serve this group.
Thank you for chiming in allovertown. Again something wasnt sounding right.

Cardeza why is it every time we have these convos you have an explanation for the backwards ass stuff Philly does.

It can be done before. Last time I checked they can grade freshly poured asphalt to fit curbs & etc.

Cmon.
__________________
Promoting Cities since 1998!
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > General Development
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 7:32 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2021, vBulletin Solutions, Inc.