Old Posted Sep 20, 2023, 10:35 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,768
Tree Work Begins At Site Where 800+ Foot Mandarin Oriental Tower Planned

Quote:
Tree removal and relocation appears to be underway at The Residences at Mandarin Oriental site on Brickell Key, according to a post on the Brickell Living Facebook group.

DERM records also show that an application for a $3.2m seawall rebuild at the property was filed in recent days.

The property is privately owned by developer Swire Properties.

According to a tree permit approved earlier this year for the site, the following was planned:

tree relocation – 25
tree removal – 10
tree removal (prohibited species) – 3
tree replacement planning – 4
The Residences at Mandarin Oriental is planned to rise over 800 feet, and will have 220 residential units.

Next door, a second tower is planned to rise around 400 feet. It will include 151 guest rooms, 61 private residences and 28 hotel residences.

Kohn Pedersen Fox Associates is the architect.
===================
NXT
Reply With Quote
     
     
  #22  
Old Posted Sep 21, 2023, 12:11 AM
Charmy2 Charmy2 is offline
Registered User
 
Join Date: Jan 2022
Location: San Francisco
Posts: 351
So is this one approved/under construction?
Reply With Quote
     
     
  #23  
Old Posted Sep 21, 2023, 12:54 PM
colemonkee's Avatar
colemonkee colemonkee is offline
Ridin' into the sunset
 
Join Date: Nov 2004
Location: Los Angeles
Posts: 9,097
This is some way out from being under construction. They'll need to demolish the current Mandarin Oriental hotel building, which is somewhere in the neighborhood of 16-20 stories. If and when they do, highly recommend seeing if you can buy any of the furniture if they are getting rid of it. The rooms are rather nice.
__________________
"Then each time Fleetwood would be not so much overcome by remorse as bedazzled at having been shown the secret backlands of wealth, and how sooner or later it depended on some act of murder, seldom limited to once."

Against the Day, Thomas Pynchon
Reply With Quote
     
     
  #24  
Old Posted Sep 21, 2023, 1:10 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,768
Yeah its in the very early preliminary states. Still ways to go.
Reply With Quote
     
     
  #25  
Old Posted Sep 21, 2023, 2:21 PM
Charmy2 Charmy2 is offline
Registered User
 
Join Date: Jan 2022
Location: San Francisco
Posts: 351
Ah thanks!
Reply With Quote
     
     
  #26  
Old Posted Oct 18, 2023, 5:32 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,768
Swire Signs Utilities Agreement For 800 Foot Brickell Key Tower

Quote:
An affiliate of developer Swire Properties has completed a utilities agreement for two towers it is planning on Brickell Key.

According to the October 5 agreement, the development will include in Phase 1:

6,500 square feet of office
Phase 2 will include:

289 residential units
179 hotel rooms
28,054 square feet of full service restaurant
Henry Bott signed on behalf of the developing entities, Swire Brickell Key Hotel, Ltd. and Swire Jadeco LLC.

A Mandarin Oriental residences building and a hotel building are planned, the developer said earlier this year.

The “architecturally spectacular” towers are being designed by Kohn Pedersen Fox Associates. The taller residences building will rise over 800 feet, with the second tower around 400 feet.

Construction permitting for a temporary sales center with an estimated construction cost of $7 million is underway, according to Miami Building Department records.
=====================
NXT
Reply With Quote
     
     
  #27  
Old Posted Oct 18, 2023, 7:02 PM
UrbanImpact's Avatar
UrbanImpact UrbanImpact is offline
Registered User
 
Join Date: Jul 2002
Location: Fort Lauderdale, FL
Posts: 1,369
Ultimate skyscraper to live in if you don't want any views to be blocked.
Reply With Quote
     
     
  #28  
Old Posted Jan 30, 2024, 2:47 AM
wanderer34 wanderer34 is offline
Registered User
 
Join Date: Jan 2006
Location: Miami/somewhere in paradise
Posts: 1,467
What's the construction status thus far?
Reply With Quote
     
     
  #29  
Old Posted Jan 30, 2024, 6:12 AM
BrickellBased BrickellBased is offline
Registered User
 
Join Date: Apr 2023
Location: Miami, FL
Posts: 165
Last time I saw the site (about 3 weeks ago) they have the park closed and fenced off, there is some digging in the ground with some backhoes etc but no foundation equipment on site.

So I'd consider it 'site prep'. I think @Atloic could add this to his 'site prep' category for Brickell in the rundown he did in the general Miami construction thread.

Quote:
Originally Posted by wanderer34 View Post
What's the construction status thus far?
Reply With Quote
     
     
  #30  
Old Posted Jan 30, 2024, 9:23 PM
Altoic's Avatar
Altoic Altoic is offline
Registered User
 
Join Date: Nov 2020
Location: Florida
Posts: 1,219
Thank you for the status update! I'll add it to my most recent update
Reply With Quote
     
     
  #31  
Old Posted Jan 30, 2024, 11:34 PM
BrickellBased BrickellBased is offline
Registered User
 
Join Date: Apr 2023
Location: Miami, FL
Posts: 165
Cool

The full rundown you did in the Miami thread is incredible. Thanks for that. There's so much going on in the city - it's quite exciting. The city is on track to transform itself again over the next 5 years.

I'll try to upload some more pics to return the favor!

Quote:
Originally Posted by Altoic View Post
Thank you for the status update! I'll add it to my most recent update
Reply With Quote
     
     
  #32  
Old Posted Jan 31, 2024, 3:17 AM
Dale Dale is offline
Registered User
 
Join Date: Dec 2001
Location: Charlotte
Posts: 4,794
Quote:
Originally Posted by BrickellBased View Post
Cool

The full rundown you did in the Miami thread is incredible. Thanks for that. There's so much going on in the city - it's quite exciting. The city is on track to transform itself again over the next 5 years.

I'll try to upload some more pics to return the favor!
I can remember the days of the failed Met III and thinking Miami would never be able to top that boom.
Reply With Quote
     
     
  #33  
Old Posted Jan 31, 2024, 3:48 AM
BrickellBased BrickellBased is offline
Registered User
 
Join Date: Apr 2023
Location: Miami, FL
Posts: 165
I'm glad you were wrong

Anyone know or have reference to the crane count in Miaimi or in the region? It curiously tends to be left off such indices. Going by Altoic's under construction projects averaging 1 crane per project, that would put it at 50 cranes...

Meanwhile Toronto going up Dubai style https://www.bdcnetwork.com/construct...e-high-q1-2023

Fascinating we don't hear more hype about it - construction there is meteoric.

Quote:
Originally Posted by Dale View Post
I can remember the days of the failed Met III and thinking Miami would never be able to top that boom.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 8:06 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.