Winnipeg Construction X
Courtesy of Dan Harper Photography
Previous construction threads:
Winnipeg Construction 9
Winnipeg Construction 8
Winnipeg Construction 7
Winnipeg Construction 6
Winnipeg Construction 5
Winnipeg Construction 4
Winnipeg Construction 3
Winnipeg Construction 2
Winnipeg Construction 1
Winnipeg Developments
True North Square (
Phase 1 complete, 17 floor Scotia Bank Tower & 25 floor retail, boutique office & residential tower)
Location: 242 Hargrave St, Winnipeg, MB
Developers: True North Real Estate Development Limited, True North Sports and Entertainment, James Richardson & Sons Limited, Northland Properties
Architect(s) : Perkins+Will in association with
Architecture 49
Construction Manager: PCL Constructors Canada Inc
Completion: 2023
Size: 1.5M+ square feet
Project Type: office, retail, residential, hotel
Cost: $650 M+
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: U/C
True North Square Phase 2:
Sutton Place Hotel & Residences at True North Square
18-storey hotel tower, 13-storey La Grande Residences on 4-storey podium of retail & parking
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=130
• Video Link
Aug 2021:
[img]

[/img]
True North Square Phase 3:
Wawanesa Mutual Insurance North American HQ
Location: 372 Graham Avenue and 236 Carlton Street, Winnipeg, MB
Developer: True North Real Estate Development (TNRED) & The Wawanesa Insurance
Architects: Architecture49
Contractor: PCL Constructors Inc
Status: Under Construction
Media: Wawanesa moving to new office tower at True North Square
Documents: http://clkapps.winnipeg.ca/DMIS/View...ctionId=576525
Project Thread: http://skyscraperpage.com/forum/showthread.php?t=245822
Aug 2021:
300 Main Street Apartment Tower
Location: 300 Main Street
Developers: Artis REIT
https://300main.ca/
Architect: Raymond SC Wan Architects
http://raymondscwanarchitect.com/300-main/
Floors: 42
Height: 465' | 142M
Phase 1: Reclad existing tower at 360 Main (complete)
Phase 2: Residential highrise (under construction)
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: U/C
• Video Link
October 2020:
Canada's Diversity Gardens
Location: Assiniboine Park Winnipeg, MB
Developers: Assiniboine Park Conservancy
Architect(s) : KPMB (Design Architect) in association with
Architecture 49
Completion: 2020
Size: 84,400 s.f.
Project Type: Cultural
Cost: 97.5M
Status: U/C
Description: 21st century botanical conservatory situated at the head of an existing Formal Garden at Assiniboine Park designed for LEED Silver Certification. It will be a signature piece of architecture that generates awareness and a presence in the park, an interactive destination that focuses on the interrelationships of plants and people, and a sustainable precedent focussing on horticulture, plants and the environment.
Fact: Main structure 'The Leaf' will be made of an extremely lightweight see-through plastic
Ethylene tetrafluoroethylene (ETFE) and will contain the largest indoor waterfall in canada at 6-storey in height.
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
• Video Link
Nov 2020:
Red River College - Innovation Centre Exchange District Campus
Location: Location: 319 Elgin Avenue, Winnipeg, MB, Downtown Exchange District Campus
Architect: Diamond Schmitt Architects inc. and
Number TEN Architectural Group
Developers: Red River College
Size: 100,000 sq. ft.
Budget: $95M
Completed: 2020 (targeted)
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: U/C
• Video Link

Sept 2020:
James Ave Pumping Station Redevelopment
Location: 109 James Avenue, Winnipeg, MB
Developers: ALSTON PROPERTIES LTD.
Architect(s) : 5468796 Architecture Inc
Status: U/C
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=223833
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=122
Phase 1: 18,600 SF of office/retail space in the James Ave Pumping Station Building. Slated for demolition after 17 attempts to revive the historic structure over the last 14 years, the James Avenue Pumping Station was successfully preserved through the development of a financial / building pro forma that would make it financially feasible. 100% leased. Spring 2018 occupancy.
Phase 2: 28 high end rental apartments on Waterfront Drive available spring 2020.
Sept 2020: (Phase 2)
Phase 3: 65 rental apartments. Winter 2021 occupancy.
Nov 2020 (Phase 3):
OSBORNE PLACE AT THE STATION (Phase 2)
Location 265 Osborne St
Developer: Imperial Properties Winnipeg
https://www.imperialproperties.ca/ou...SACEgKo_vD_BwE
Architect: DIN Projects
http://www.dinprojects.ca/#http://ww...o/257-osborne/
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=220693
Status: On Hold
Osborne 380
Location: 380 Osborne
Developer:
Architect: DIN Projects
Status: U/C
Media: Infill apartment block planned for 380 Osborne
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...7&postcount=81
Description: 7-storey residential mixed use building with 71 dwelling units and one commercial spac ewith two levels of indoor parking, one underground and one at grade
The Arc Phase 1
Location: Location: 2525 Pembina Hwy , Winnipeg, MB
Architect: Architects + Research + Knowledge, Inc.
Developer: Campus Suites
Size: 352-unit, 16-storey multi-family building
Completion date: Unknown
Budget: $70 M
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=236081
Status: U/C
Renderings & Construction pics: http://forum.skyscraperpage.com/show...1&postcount=91
Description: 570 bed mixed-use student housing community in phase 1, phase 2 under development
http://clkapps.winnipeg.ca/DMIS/View...ctionId=493074
• Video Link
Phase 2: Phase 2: The current proposed building (phase 2) is approximately 60 meters tall (18 storeys plus a mechanical penthouse). This will be able to provide 432 Residential units that will vary between 1, 2 and 4-bedrooms. One major feature will be the commercial/retail uses on the main floor of the building, similar to the Arc (2525 Pembina) development. Please note that building details may change based on feedback received throughout the engagement process
281 River Ave
Location: 281 River Ave, Winnipeg, MB
Architect: BLDG architecture office inc.
Developer: Towers Realty Group