HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > India


Reply

 
Thread Tools Display Modes
     
     
  #622  
Old Posted Sep 14, 2023, 1:53 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,124

Last edited by BolliBatlu; Mar 26, 2024 at 5:01 AM.
Reply With Quote
     
     
  #624  
Old Posted Sep 15, 2023, 1:35 PM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,124
Make in Kudla

MRPL net profit declines 10.7 per cent to ₹2,638 cr in FY ‘23 2

Civil aviation ministry's consultative panel discusses sustainable aviation fuel
Quote:
Besides, Mangalore Refinery and Petrochemicals Ltd is planning to build a bio-ATF pilot plant at Mangalore using CSIR-Indian Institute of Petroleum's technology using non edible oils and used cooking oil as feedstock.
Green hydrogen: State oil firms target 38,000 tonnes/year capacity by 2024-25
Quote:
Bharat Petroleum is targeting 25 MW capacity while Numaligarh Refinery and Mangalore Refinery & Petrochemicals are aiming for 20 MW and 3 MW respectively.
ಕರಾವಳಿಯಲ್ಲಿ ಹೆಚ್ಚಾಯ್ತು ಜೇನುತುಪ್ಪ ಸಂಗ್ರಹ, ಬೇಸಿಗೆಯೇ ಕಾರಣ!

BASF India Ltd Expansion Works
Quote:
The proposal is for amendment in the Environmental Clearance (EC) granted by the Ministry vide letter no. J-11011/456/2008-IA-II(I) dated 6.11.2008 for expansion of Dyes Manufacturing Plant from (2,225 TPA to 4,225 TPA) and Production of Textile Auxiliaries (13,000 TPA), Dispersions (70,000 TPA) at Mangalore works, Suratkal Bajpe Road, Bala village, Mangalore Taluka, Dakshina Kannada District, Karnataka by M/s BASF India Ltd.
Quote:
To be revised/read as, Manufacturing of formulation products such as Additives (Sovermol & Loxanol) - 10,000 TPA, Mining Auxiliaries - 5,000 TPA; along with existing formulation products such as Micronutrients - 15,000 TPA, Synthetic Specialty Coatings and CED emulsions - 19,000 TPA, Precious Metal Slurry Catalyst - 230 TPA, Paint, textile and leather auxiliaries - 10,000 TPA; and Dyes - 4,225 TPA, Textile Auxiliary - 13,000 TPA, Dispersions - 70,000 TPA.
India’s KIOCL temporarily shuts Mangalore pellet plant

CAMPCO forced to rely on cocoa beans from A.P. due to shortage in Karnataka, Kerala

India plans to fill Mangalore SPR with 5.5 mln barrels of oil after Oct: source

ವಿಶ್ವದ ಗಮನ ಸೆಳೆದ ಮಂಗಳೂರಿನ ಐಸ್ಕ್ರೀಮ್!

MRPL becomes largest single location PSU-refinery of India

Flow of untreated water from MRPL unit causes concern among residents in Kuthethoor, Katipalla

MRPL Q1 Results Profit declines 62.6% at ₹1,015 crore, net worth rises YoY

ಉಡುಪಿ ಸೀರೆಗಳಿಗೆ ಅಡಕೆ ಚೊಗರಿನ ನೈಸರ್ಗಿಕ ಬಣ್ಣ ನೀಡುವ ಪ್ರಯೋಗ ಯಶಸ್ಸು

Top 9 Metro Cities in South India for IT Sector Placements

MRPL to make calibrated investments in petrochemicals
Quote:
An integrated refinery with 25-30 per cent petrochemical intensity would require an investment of two-to-three times that of a conventional refinery. Mentioning that the present petrochemical intensity of MRPL is 10 per cent, the annual report said the company would make calibrated investments in petrochemicals to embrace long-term changes, while continuing to ensure relevance and viability of its existing assets.
Coworking office space solutions in Mangalore– MyBranch

Centre plans to fill Mangalore SPR with 5.5 mn barrels of oil after Oct

KIOCL: Miniratna PSU stock falls 5% after company stops pellet production due to raw material shortage
India’s KIOCL Limited slips into the red in Q1 FY 2023-24

ONGC plans oil-to-chemical plants in pivot towards energy transition

Indian refiner MRPL to phase out exports as it adds retail outlets

ONGC eyes up ambitious renewables output with $12bn investment by 2030
Quote:
ONGC also aims to set up a 1 million tonnes per annum green ammonia plant at Mangalore.
Gail Mangalore Petrochemicals

Why Mangalore instead of Mangaluru?

Plastic Park set for inauguration in Jan 2024: Union minister Khuba
Complete work on Plastic Park project in Mangaluru by December: Minister Bhagawanth Khuba

MRPL – Iso-Butyl Benzene Production Plant – Karnataka
Quote:
MRPL – Iso-Butyl Benzene Production Plant – Karnataka involves the construction of an Iso-Butyl Benzene production plant capable of producing 50,000 metric tons per year in Mangalore, Karnataka, India. The US$35 million project includes the following:

1. Construction of a production facility
2. Construction of a storage facility
3. Construction of three large storage tanks
‘MRPL intends to set up world-scale isobutylbenzene production facility in future’
Quote:
Speaking at the 35th annual general body meeting held virtually, Mr. Varma said, a vital active pharma ingredient for the production of painkillers, IBB production will leverage an already granted patent of MRPL.
MRPL Holds 35th Annual General Meeting
Quote:
Apart from this, MRPL is also actively considering setting up a few other speciality chemical plants within the existing complex itself.
Automated factory manufacturing export-oriented bio plates made from arecanut palm leaf to be commissioned at Nidle village in Dakshina Kannada
Quote:
He said that the factory in the rural area provided direct employment to 180 persons and indirect employment to about 500 persons. ...

The factory’s production of finished products now stands between five and six containers per month. “The company intends to double it post January, 2024,” he said.

“Post January 2024, we will emerge as the top manufacturing and export oriented unit for bio plates made from arecanut leaf in the country,” he said.
Small-scale industrial park to come up at Aryapu, says Darshanapur

Protect land reserved for industries, says minister

Karnataka coast to get 56 artificial reefs to facilitate fish breeding

MRPL bags global water management company award

SIDBI to open branches soon in Belagavi and Mangaluru to serve MSMEs

Various organizations are already interested in setting up an IT park in Mangalore 2

I think these organizations are westline, golfinch, northernsky etc.

India’s KIOCL Limited resumes operation of pellet plant

Plan to transition to an 'energy' company HPCL chief Pushp Kumar Joshi
Quote:
We are constructing an LPG cavern in Mangalore which is in advanced stage and by ast quarter of this fiscal or first quarter of next fiscal we will be able to commission that. It will bring in alot of synergies for us on the LPG front.
The new LPG cavern is a safe storage facility, HPCL tells House Committee
Quote:
The new 80,000 metric tonne capacity cavern coming up in Mangaluru at cost of ₹854 crore is a safe storage facility, ...
Study report about pollution by large-scale industries received – B M Farook

Waive penalty for forest law violations in Western Ghats: KIOCL to govt

RFP of IT park proposed at Derebail in Mangaluru will be ready in next two months, says Dinesh Gundu Rao
Mangaluru IT park under PPP mode gets government nod
Quote:
... A request for proposal (RFP) for the project will be ready within two months, the minister (Dinesh Gundu Rao) said here on Monday.

... The government is considering the increase in the PPP term rom 30 years to 60 years for the project," he said.
Government greenlights IT Park in Derebail, Mangaluru

Beyond Bengaluru: Karnataka secures 25 LoIs from Saudi Arabia for Mangaluru digital economy cluster
Quote:
The Karnataka Digital Economy Mission (KDEM) on September 15 stated that it has signed more than 25 Letter of Intents (LoIs) with companies from Saudi Arabia interested in expanding their business in the Mangaluru cluster.

KDEM staged a roadshow on September 7 in Al-Khobar, Saudi Arabia, led by industries from the Mangaluru cluster, now popularly known as 'The Silicon Beach of India.' The aim of the roadshow was to showcase the potential of the Mangaluru cluster as an emerging technology hub and investment destination, according to a statement from KDEM.
‘Saudi companies express interest in investing Mangaluru Digital Economy Cluster’
25 LOIs Inked at Saudi Roadshow to Expand their Businesses in Mangaluru Cluster
Karnataka Digital Economy Mission signs over 25 letters of intent with Saudi Arabian companies for Mangaluru Digital Economy Cluster
Quote:
Mr. Bhat said the successful meetings and interactions with the local medium and large companies from eastern province of Saudi Arabia indicated that they are looking to make Mangaluru as their second home for their business with focus areas of IT services, Back Office operations and Engineering Design Services.
ಮಂಗ್ಳೂರಲ್ಲಿ ದೇಶದ ಅತೀ ದೊಡ್ಡ ಭೂಗತ ಗ್ಯಾಸ್ ಸಂಗ್ರಹಾಗಾರ..!


CAMPCO seeks minimum support price for rubber growers in Karnataka as farmers are in dire straits

MRPL Wins in 12 Categories at PRCI Global Communication Conclave

Mangaluru has all the potential to become a key economic hub, says MRPL Managing Director
MRPL MD bats for Mangaluru as the Commercial Capital of Karnataka at Inaugural of KCCI Renovated Building

Epsilon Carbon becomes the first Indian company to export liquid Coal Tar Pitch

MCC panel to review steps taken by mushroom factory to stop foul smell

Campco releases Ayush and Poushtik manures under its brand for arecanut farmers

India’s state-run pellet produce KIOCL Limited shuts down plant again

ಮಂಗಳೂರಿನಲ್ಲಿ ಹಸುರು ಹೈಡ್ರೋಜನ್ ಘಟಕ?- ವಿವಿಧ ಕಂಪೆನಿಗಳ ಆಸಕ್ತಿ; NMPA ಸನಿಹ ಸರ್ವೇ
Quote:
ಪಣಂಬೂರಿನ ನವ ಮಂಗಳೂರು ಬಂದರು ಸಮೀಪದಲ್ಲೇ ಇರುವ ವಿಶೇಷ ಆರ್ಥಿಕ ವಲಯ (ಎಸ್ಇಝಡ್)ದ ಸುಮಾರು 100 ಎಕರೆಗಿಂತಲೂ ಅಧಿಕ ಜಾಗದಲ್ಲಿ ಪ್ರಸ್ತಾವಿತ ಹಸುರು ಹೈಡ್ರೋಜನ್ ಘಟಕ ಅಥವಾ ದಾಸ್ತಾನು ಕೇಂದ್ರ ನಿರ್ಮಾಣಕ್ಕೆ ಅವಕಾಶ ಸಿಗುವ ಸಾಧ್ಯತೆ ಇದೆ.
Quote:
ಗ್ರೀನ್ ಹೈಡ್ರೋಜನ್ ಉತ್ಪಾದನ ಘಟಕವನ್ನು ಮಂಗಳೂರಿನಲ್ಲಿ ಆರಂಭಿಸಲು ಕೆಲವು ಕಂಪೆನಿಯವರು ಈಗಾಗಲೇ ಸರ್ವೇ ನಡೆಸಿದ್ದಾರೆ. ರಫ್ತು ಮಾಡಲು ಸುಲಭ ವಾಗುವಂತೆ ನವಮಂಗಳೂರು ಬಂದರು ಸಮೀಪದ ಎಸ್ಇಝಡ್ ನಲ್ಲಿಯೇ ಜಾಗ ಪರಿಶೀಲಿಸಿದ್ದಾರೆ. ಅಂತಿಮ ತೀರ್ಮಾನ ಇನ್ನಷ್ಟೇ ಆಗಬೇಕಿದೆ.
Summary: 7 companies have shown interest in investing in Green Hydrogen in Mangaluru. Out of them 4 companies have surveyed land at MSEZ & have got green signal from the state government.

When is the central government going to release money for constructing Indian Institute of Green Energy?

Quote:
Originally Posted by BolliBatlu View Post

1MWp solar farm off M’luru coast soon


So now, the government can plan for sea-based electricity for Green Hydrogen & Ammonia production!

Now, even for Subsea Data Centers electricity can be supplied from near by sea-based power plant. Hope that Adani will plan for Subsea Data Centers for Data Park at Yellur.

I wonder whether there could be combined solar+wave or wind+wave energy to electricity converters which could be mounted on single installation on sea! And then ocean current as third addition! ref: net-zero data centre
Mangaluru having stable seabed is definitely a help towards net-zero data centre! 1 2
Whether any company is showing interest to setup floating Green Hydrogen Plant in Mangaluru? Having floating Green Hydrogen plant near sea-based solar/wind plants will be more enrgy efficient.

Floating Offshore Wind Hydrogen Production
Floating Power Plant - Floating wind and hydrogen will make oil and gas a lot greener
12toZERO combines floating wind and hydrogen storage | #PortOfRotterdam

Why not NITK carry out a feasibility study on this?

Mangalore-the future green hydrogen hub


GAIL Mangalore Petrochemicals Plant to be commissioned by March 2025

GAIL Gas commences supply of PNG to many industrial and commercial establishments and some households in Mangaluru
Quote:
A diverse segment of customers in Baikampady Industrial Area are being supplied PNG by GAIL Gas, ...

GAIL Gas has forged gas sale agreements for PNG supply to additional 40 industrial units and 124 commercial establishments, including hotels and restaurants.
Quote:
The release said GAIL Gas is steadfast in its commitment to enhancing the CGD Network in next 8 years, with plans to establish 100 CNG stations across the district. Soon, the convenience of CNG will extend to areas like Puttur, Sullia, and Nellyadi.

On the PNG front, 3.5 lakh households will benefit from the safe and accessible PNG fuel in longer span of time. The initial phase will witness PNG connectivity in areas such as Surathkal, Mukka, Mulki, Kulai and Bondel, with plans for expansion into other residential regions.
Rapture Innovation Labs Redefining Audio Experience

Do they have development center in Mangalore?

India's Largest LPG Storage Tunnel Takes Shape in Mangaluru 2

26th Energy Technology Meet: MRPL bags the "Best Innovation in the Refinery" award

"ಮಂಗಳೂರಿನಿಂದ ಮಲೇಷ್ಯಾ, ಚೀನಾ, ಸಿಂಗಾಪುರಕ್ಕೆ ಜೀವಂತ ಏಡಿ ರಫ್ತು.." | Crab Exports | Mangaluru | China

India’s KIOCL resumes operations at iron ore pellet plant

Ramanath Rai bats for underground or submarine line to transmit power from UPCL to Kasaragod

NMPA inks deals worth ₹8,347 crore at Global Maritime Summit
Quote:
These MoUs will pave the way for further development and expansion of the port and its associated infrastructure, said a release from NMPA. On the first day, NMPA exchanged two MoUs with Mangalore Refinery and Petrochemicals Ltd. of ₹5,000 crore for Port Based Infrastructure for Business Development ₹1,500 crore for Desalination Plant (Augmentation and New Capacities).

On the second day, four MoUs of total amount of ₹1,800 crore were exchanged with various stakeholders like HPCL, IOCL, Karnataka Maritime Board and Sealord Containers Ltd. under Port Led Industrialisation. On the last day, Thursday, one MOU was exchanged with PHPC for setting and installing Tank farms/Storage Infrastructure for total amount of ₹47 crore.
In a first, Karnataka to explore ‘blue energy’
Quote:
The minister told The New Indian Express: “I had a meeting with a team from the Netherlands, where they explained that energy can be generated using river and seawater. They have sought support to undertake a pilot project in Mangaluru. We have told them that this will be discussed with the CM. We also told them to go to Mangaluru and take a look.”
Are they going to use brine water from desalination plant? How much fresh water is needed? (What is Blue Energy? Blue Energy- Salinity gradient power | ACCIONA Imnovation)

MCFL shuts operations at Mangaluru phosphatic plant due to lack of raw material

Efforts are under way to grow oranges beyond Kodagu district

DK milk union procures 1L litres from outside to bridge deficit

India’s KIOCL Limited shuts down pellet plant yet again

Veterinary dept will grow green fodder to tackle cattle feed crisis

ಮತ್ಸ ಸಂಪತ್ತು ವೃದ್ಧಿಗೆ ಮಂಗಳೂರು, ಉಡುಪಿ, ಕಾರವಾರ ಬಳಿ ಸಮುದ್ರಕ್ಕೆ ಕೃತಕ ಕಲ್ಲು! ಇದರಿಂದೇನು ಲಾಭ?

ಎಲ್ಪಿಜಿ ಭೂಗತ ಸಂಗ್ರಹಾಗಾರ

MRPL turns around with Rs 1,059-crore profit in Q2; shares rally nearly 3%

CII Southern Region to focus on nine tracks to transform South India by 2047
Quote:
Inaugurating a new office of CII in Mangaluru earlier, Mr. Bali said CII’s office network in South India has now increased to 17. CII could extend its services to members and other stakeholders with specific interventions for development of MSMEs in Mangaluru region.
Govt ready to Support setting up Gold Processing Unit in Mangaluru – HM Dr G Parameshwar

Quote:
Udupi: There is an opportunity to set up a gold processing (SOC) unit in Mangalore. If businessmen come forward, the government will provide the necessary space for it. A gold processing plant can be started by businessmen investing with the cooperation of the government said Home Minister Dr G Parameshwar.

Mangaluru Sets Its Sights on Tourism and Tech: Post-Festival Gathering to Chart
Quote:
"Our aim is to enhance both the tourism and IT landscape in the region. We will assess the previously designated land for establishing IT units and take necessary steps to boost the sector. Our emphasis will also be on nurturing environmentally friendly industries in this area," Health Minister and Dakshina Kannada district in-charge Dinesh Gundu Rao told reporters in Mangaluru Wednesday.
As a health ministed why can't he try to set up Medical Devices Park in Mangaluru?

Boomsma Shipping and Leonhardt & Blumberg link up for up to eight newbuilds in India 2

MRPL lost nearly a sixth of its profit margin to windfall taxes

Mangaluru-based Mukka Proteins Gets SEBI Nod For IPO

MRPL ವಿಶ್ವದರ್ಜೆಯ ಸ್ಥಾವರ ನಿರ್ಮಾಣಕ್ಕೆ ಸಿದ್ಧತೆ - ನೋವು ನಿವಾರಕ ತಯಾರಿಗೂ ಎಂಆರ್ಪಿಎಲ್ನಿಂದ ಕಚ್ಚಾವಸ್ತು

Summa: MRPL has got manufacturing process patent for Isobutylbenzene (IBB) which is used for medicines (painkillers like ibuprofen, aspirin etc), polycarbonate, polystyrene & other plastic products. Now MRPL is going to construct world's biggest manufacturing plant of capacity 2 lakh metric tonnes in its Mangaluru premises for both local & export purposes transforming India from an importing nation to an exporting one.

KIOCL restarts operation at Mangaluru pellet plant

Government tells GMPL to resolve project displaced families’ employment issue by December 1

Trust to popularise jasmine cultivation

Today’s need is to build a corridor between Mangaluru and Bangaluru – HM Dr G Parameshwar
Quote:
Today’s need is to build a corridor between Bangalore and Mangalore which are growing very fast and I am confident that this work will be done. If this project is implemented, the time to travel from Mangalore to Bangalore will be just three and a half hours, he said.
ಸದ್ಯದಲ್ಲೇ ಬೆಂಗಳೂರು- ಮಂಗಳೂರು ಕಾರಿಡಾರ್ ನಿರ್ಮಾಣ !! ಗೃಹಸಚಿವರಿಂದ ಮಹತ್ವದ ಘೋಷಣೆ

Karnataka proposes Mangaluru–Bengaluru Integrated High-Speed Corridor

Whether this will be a feeder corridor for India-Middle East-Europe Economic Corridor?

High-speed rail corridor in the works from Bengaluru to Mangaluru

Brevera Technologies reaches 10th anniversary milestone brevera

KDEM conducts ‘Mangaluru Blue’ to connect start-ups with potential investors
Quote:
The ‘Mangaluru Blue’ event witnessed registrations from 35 start-ups. After a preliminary screening process, 15 finalists were selected, and they pitched their ideas before a panel of investors and venture capitalists (VCs).
Quote:
Following were the top fund-ready start-ups at ‘Mangakuru Blue’ after the collective evaluation of the jury: Bucolic Kailash Agritech and FMCG Pvt Ltd; Remiteazy Technologies LLP; Tiny Prism Labs Pvt Ltd; and Trachealth Technologies Pvt Ltd.

The top fund-ready start-ups secured complimentary booths at the Bengaluru Tech Summit (BTS), and priority pitching access for the Mangaluru Cluster Seed Fund and the Karnataka Acceleration Network programme.

The top 15 start-ups secured the all-access passes to the BTS 2023 scheduled from November 29 to December 1. They will also be provided a start-up showcase table at the Mangaluru Technovanza, which is scheduled in December.
M’luru Blue: 4 startups shortlisted for funding


Mangalore-the future green hydrogen hub

Petronas, GIC, Greenko Energy Holdings to invest USD two bln in AM Green platform
Quote:
The investments will be utilised for the production of five million tpa of green ammonia (NH3) by 2028-2030 across four-five locations such as Kakinada, Tuticorin, Mangaluru and Kandla. ...
South Canara Coconut Farmers’ Producer Company Ltd. to release bio-fertiliser made from coconut water, and other products on November 16
Quote:
A bio-fertiliser made from coconut water and other ingredients and a plant immunity booster made from coconut tree petiole are among the four new products to be released by South Canara Coconut Farmers’ Producer Company Ltd. (FPC), Puttur, at a function in Mangaluru on Thursday, November 16.

The other two products will be chutney powder made from copra and coconut oil.
South Canara Coconut Farmers Producer Company's regional office inaugurated

Artificial reefs dropped into sea to facilitate fish breeding in coastal region

India’s KIOCL Limited seeks offshore supplier for 200,000 mt of iron ore concentrate

National Bee Board sanctions ₹2.22 crore to Gramajanya Farmers’ Producer Company to set up honey, bee wax processing unit at Puttur

Mangaluru Realty bets big on IT, to develop 15 lakh sq ft space in 3 years
  • The district has over 200 tech and tech-enabled startups occupying 3 lakh sq ft of space.
  • Karuna Infra Properties India Pvt Ltd is confident that the city will be ready with 10 lakh to 15 lakh sq ft of space for IT in the next three years.
  • Bharath Developers are in the drawing stage for a building 1.25 lakh sq ft, which should come up in the next three years.
  • Rohan Corporation have 3 lakh sq ft of ready to occupy space available for IT and intend to develop close to 10 lakh sq ft of space.

Last edited by BolliBatlu; Nov 22, 2023 at 2:55 PM.
Reply With Quote
     
     
  #625  
Old Posted Sep 23, 2023, 8:25 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,124
Under Renovation Srinivas Hotel, GHS Road
Reply With Quote
     
     
  #627  
Old Posted Dec 8, 2023, 8:18 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,124
Invest Rs 32 lac in ‘Mcvin - Transit Gateway’, earn rentals of Rs 32,000 per month
McVin Gateway | McVin Habitats
Quote:
5000 SqFt, fully-furnished co-working space with a cafeteria, meeting rooms, high speed Internet connectivity, printers, lounges and more. Access to the co-working space comes at an affordable monthly membership fee.


I am expecting n private IT Park in Deralakatte.
Reply With Quote
     
     
  #628  
Old Posted Dec 9, 2023, 3:56 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,124
BMK Sky Villa, Land Trades


Land Trades to unveil exciting new projects in Dubai
Quote:
The first project at Alake will be situated close to Kudroli Sri Gokarnanatheshwara Temple on 1.5 acres of prime land. The 33-story building will feature 162 spacious 2BHK, 3BHK flats, and 4BHK duplex apartments. The project is conceived in a 60:40 ratio, with 60% of the land dedicated to lush green landscaping and only 40% of the land being used for the built-up structure.
Quote:
The other project at Vas Lane will be an ambitious venture aimed at the super premium segment. It will be built on 48 cents of prime land and will rise 24 stories tall. It will feature 23 exclusive super-spacious flats, with only one home on every floor, thereby guaranteeing maximum exclusivity, privacy, and security. The homes will have an extended ceiling height of 12 feet.
Reply With Quote
     
     
  #630  
Old Posted Jan 19, 2024, 9:10 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,124
Water Transportation

Coastal economy
Quote:
The Chief Minister said that he has asked his Ministers in the region to develop the districts with all amenities. While supplementary programmes are formulated in the Budget, work on expansion of Mangaluru and Karwar ports have been taken up. Grants have been provided to develop eight fishing harbours while subsidies will be provided for deep sea fishing boats. All these should boost the coastal economy. The State government has submitted proposals for 24 projects with a total investment of ₹2,400 crore have been submitted to the Central Government.
NMPA receives the first mainline container vessel

Epsilon Carbon to set up storage facility at Mangalore port

Karnataka’s port-development spree ignores coastal communities’ concerns

Karnataka’s Mangaluru port handles its largest container vessel

PPP projects herald growth of major ports, says Shripad Naik
Investment of ₹1,126.69 crore has been made for the development of mechanised coal and container handling terminals at New Mangalore Port

PM to inaugurate port projects in Mangaluru on Sept 2
Quote:
Prime Minister Narendra Modi will inaugurate a few mechanisation and industrialisation projects, and lay the foundation stone for a few others, in all worth around ₹3,800 crore, in Mangaluru on September 2.

According to a release by Press Information Bureau, Modi will inaugurate an over ₹280-crore project for the mechanisation of berth no. 14 for handling containers and other cargo, undertaken by the New Mangalore Port Authority (NMPA).

The mechanised terminal will increase efficiency and reduce turnaround time, pre-berthing delay and dwell time in the port by around 35 per cent, thereby boosting the business environment, it said.

Phase-1 of the project has been completed, adding over 4.2 million tonnes per annum (MTPA) handling capacity. This would increase to over 6 MTPA by 2025, it said.

Modi will also lay the foundation stone of five projects worth around ₹1,000 crore at the port.

This includes an integrated LPG and bulk liquid POL facility. Equipped with a cryogenic LPG storage tank terminal, it will be capable of unloading full load VLGC (very large gas carriers) of 45,000 tonnes. The press release said the facility will bolster the Pradhan Mantri Ujjwala Yojana (LPG supply scheme for needy families) in the region while reinforcing the port’s status as a top LPG importer.

The Prime Minister will lay the foundation stone of projects for construction of storage tanks and edible oil refinery, and construction of bitumen and edible oil storage and allied facilities. These projects will improve the turnaround time of bitumen and edible oil vessels and reduce the overall freight cost for trade, it said.

The Prime Minister will also lay the foundation stone for the development of the fishing harbour at Kulai in Mangaluru. This work will be undertaken under the umbrella of the Sagarmala Programme, and will result in significant socio-economic benefits for the fishermen community, the release said.
PM Narendra Modi inaugurates Rs 3800 cr projects in Mangaluru

New storage facilities to help strengthen edible oil security of Karnataka
New Mangalore Port to add edible oil storage facilities
Quote:
The proposed infrastructure projects at the NMPA are the construction of edible oil storage tanks and an edible refinery by the Hyderabad-based Santoshimathaa Edible Oil Refineries Pvt Ltd (Priya Gold); and the construction of bitumen, edible oil storage tanks and allied facilities by the Mangaluru-based Anagha Refineries Pvt Ltd.
Upgraded CRCL of Mangaluru Customs inaugurated
Inauguration of Upgraded Laboratory at Mangalore Customs
Quote:
Shri Sandeep Prakash, Director of CRCL, ... also informed that this is 12th laboratory of CBIC and it has all the sophisticated testing equipment for testing of coal, vegetable oil etc. and soon cashewnut testing facility would be provided. Dr Venkata Ramana Akkaraju, Chairman NMPA, in his address said that Customs has taken many initiatives to facilitate the ease of doing business. He thanked the Chairman CBIC for the newly modernized and revamped laboratory and said that he was confident that things will be easier for the importers and exporters.
Three NMPA projects inaugurated, foundation stone laid for new ones
Quote:
The projects that were inaugurated include modernised Mallya (Main) Gate, Solid Waste Management Facility and the bi-lingual website of the port. Foundation stone was laid for the construction of a concrete road from KIOCL Junction to Mallya Gate and construction of a truck terminal next to Customs House.
Silt removal in fishing port not done, boat navigation difficult

Cruise vessel calls at New Mangalore Port

New Mangalore Port Authority produces 38.45 million units of solar power in six years

Fishing jetty project third phase yet to begin in port of city

K’taka Governor virtually inaugurates automation of existing weigh-bridges at NMPA

One more boat-building yard to come up at Mangaluru Old Port

Cargo traffic at major ports rises 12 pc in February: IPA

ನೇತ್ರಾವತಿ- ಫಲ್ಗುಣಿಯಲ್ಲಿ 7 ತೇಲುವ ಜೆಟ್ಟಿ
Quote:
ಸುಲ್ತಾನ್ ಬತ್ತೇರಿ, ಬಂದರು ಫೆರ್ರಿ, ಸ್ಯಾಂಡ್ ಪಿಟ್ ಬೆಂಗ್ರೆ, ಉತ್ತರ ಸ್ಯಾಂಡ್ಬಾರ್, ಹಳೆ ಬಂದರು, ಜಪ್ಪಿನಮೊಗರು ಹಳೆ ಫೆರ್ರಿ ಮತ್ತು ಕಸಬ ಬೆಂಗರೆಯಲ್ಲಿ ಕೇಂದ್ರ ಸರಕಾರದ ಬಹು ನಿರೀಕ್ಷೆಯ ಸಾಗರಮಾಲಾ ಯೋಜನೆಯಡಿ ಈ ಜೆಟ್ಟಿಗಳಿಗೆ ಮಂಜೂರಾತಿ ದೊರಕಿದ್ದು, ಈ ಯೋಜನೆಯ ಶೇ. 100ರಷ್ಟು ಅನುದಾನ, 26 ಕೋಟಿ ರೂ.ಗಳನ್ನು ಕೇಂದ್ರ ಸಚಿವಾಲಯ ಒದಗಿಸಲಿದೆ.
M’luru to get 4 more floating jetty projects
Quote:
These projects — envisaged off Thannirbhavi Church, Bangra Kulur, Kulur Bridge and Jeppinamogaru NH bridge — are located primarily on rivers Gurupura and Nethravati, and shall be used for tourism purposes.
New Mangalore Port Welcomes First Direct Mainline Container Service

Green hydrogen bunkering, refuelling facilities to be set up at all major ports by 2035

JSW Infrastructure to invest Rs 152 crore to increase container capacity at NMPT

after 24-jul-2023
Container freight stations. Mangaluru shores up infra to boost container handling

NMPA expects handling 48 MT of cargo during 2023-24, says chairman

Global Maritime India Summit Karnataka curtain raiser on August 20

New Mangalore Port posts 9% growth in traffic during four months of this fiscal, says Shripad Yesso Naik

Mangaluru Takes Center Stage in GMIS 2023 NMPA Set to Emerge as a Major Player

JSW Infrastructure: Mangalore Container Terminal Expansion Starts Sep 2023
JSW Mangalore Container Terminal Expansion Underway

Mangalore port gears up to handle surge in cargo by 2030
Quote:
New Mangalore Port Authority targets a throughput of 58-plus million tonnes of cargo by 2030
Dedicated Jetty, Cargo & Cruise Terminals for Lakshadweep at the Old Mangalore Port

JSW Infra to launch Rs 2,800 crore IPO by September-end (includes NMPT container terminal)

Iron ore exports recommence after a decade at New Mangalore Port

NMPA inks deals worth ₹8,347 crore at Global Maritime Summit
PM virtually inaugurates Global Maritime India Summit 2023 held
Culmination of Global Maritime India Summit 2023: A Resounding Success in Mumbai
Quote:
On the first day, NMPA exchanged two MoUs with Mangalore Refinery and Petrochemicals Ltd of Rs. 5000 Crores for Port-Based Infrastructure for Business Development & Rs. 1500 Crores for Desalination Plant (Augmentation and New Capacities). On the second day 04 MOUs of a total amount of Rs. 1800 Crores were exchanged with various stakeholders like HPCL, IOCL, Karnataka Maritime Board & Sealord Containers Ltd under Port Led Industrialization. On the last day, one MOU was exchanged with PHPC for setting up and installing Tank farms/Storage Infrastructure for the total amount of Rs. 47 crores.
Mayor to decide on WTP after spot visit

ಹಳೆ ಬಂದರಿನಲ್ಲಿ “ಹಡಗು ಟರ್ಮಿನಲ್’ಗೆ ಹಸುರು ನಿಶಾನೆ
Ship terminal to come up at old port in Bunder in Mangaluru soon
Ship terminal to come up at old port in Bunder soon
Quote:
The new commercial jetty will be built on an area of 300 meters on the north side of the port at a cost of Rs 65 crore in joint venture of union government and Lakshadweep administration group. In addition to Cargo jetty, an 80-meter long well-equipped passenger terminal and one godown will be built.
ಮಂಗಳೂರು, ಕಾರವಾರದಲ್ಲಿ ಬಂದರು ನಿರ್ಮಾಣ – 13 ಐಲ್ಯಾಂಡ್ ಅಭಿವೃದ್ಧಿ: ಮಂಕಾಳ್ ವೈದ್ಯ
Karnataka govt explores cruise tourism; Karwar and Mangaluru considered as first ports

Do they construct this in addition to Lakshadweep Jetty?

Yes. The cruise port is planned at Ullal.

Ullal ಉಳ್ಳಾಲ ಬಳಿ ಕ್ರೂಸ್ ಬಂದರು- ಪ್ರವಾಸೋದ್ಯಮ ಉತ್ತೇಜನಕ್ಕೆ ಸರಕಾರದ ಪ್ರಸ್ತಾವನೆ

Summa: Cruise port of 1,325 meters width and 625 meters length is planned between Talapady & Battapady beaches of Ullal. The port, with terminal, vehicle parking & other facilities, can handle minimum two cruise ships of 10 meters depth simultaneously.

Boost to tourism: Cruise port to be established at Ullal

What happened to Marina Plan?

Aegis Logistics to setup India’s largest Cryogenic Terminal at Mangalore by FY25
Quote:
Aegis already has a terminal in Mangalore with a storage capacity of 76,000 KL for handling chemicals and POL. To further its capabilities, Aegis has acquired an additional 22 acres of land to establish a state-of-the-art LPG cryogenic terminal in Mangalore. With a static storage capacity of 80,000 metric tons and the potential to handle a throughput of 5 million-plus metric tons of LPG per annum, this terminal is a pioneering venture in Mangalore. It would be India’s largest Cryogenic Terminal. The total cost is estimated to be around Rs. 500 Crores.
Connecting Karnataka By Waterways: IWAI Invites EoI To Operationalise Five National Waterways 2
Quote:
The identified waterways include, Gurupur River (NW 43), Kabini River (NW 51), Kali River (NW 52), Netravathi River (NW 74) and Sharavati River (NW 90).
New Mangalore Port to attract 10 cruise vessels

Three fishing ports of coastal region to be modernised

MP Nalin Kumar Kateel advocates for revival of direct cruise service from Mangaluru to Lakshadweep

What had happened to this - The Lakshadweep Islands Tourism Development Authority will start Mangalore-Lakshadweep tourist liner service from 6 November 2010?

Demand to revive passenger ships from Mangaluru to Lakshadweep

Construction of a dedicated jetty at mangaluru for lakshadweepa

ಮಂಗಳೂರಿನಲ್ಲಿ ವಾಟರ್ ಮೆಟ್ರೊಗೆ ಅನುಮೋದನೆ
Summa: The state government has approved Rs. 1600 crores water metro for Mangaluru & asked to prepare DPR. Initially Bengre & Ullal will be connected to Mangaluru. An International Ship Terminal will also be built. Also an MoU is signed with Centre of Excellence in Maritime & Shipbuilding (CEMS) for starting maritime training centre.

I wish for amphibious buses from Ulla & Tannibhavi to State Bank & Central Railway Station. Let us hope that the DPR will include arrangements for smooth movement of amphibious vehicles between land & rivers/sea.

How are they going to integrate water metro project with the project here in this link - Shipping Ministry sanctions seven floating jetties for Mangaluru, to fund 100% estimated cost of ₹26 crore?

Dredger Wanted: Bare Silt in Mangalore’s Halebandar! Dredger urgently needed!

ಫಲ್ಗುಣಿಯಲ್ಲಿ ರೋರೋ; ಮಂಗಳೂರು ಬಂದರು-ಹೆದ್ದಾರಿ ಮಧ್ಯೆ ಹಡಗುಯಾನ

Summa: To reduce traffic from Old Port through the city by developing waterways, Netravathi & Phlaguni (Gurupura) rivers are renamed as National Waterway-43 (Phalguni) and National Waterway-74 (Netravathi). Integrated development proposal of these waterways is already dispatched to Sagarmala cell and Central Ministry of Ports, Shipping & Waterways has sanctioned Rs. 29.62 crores for the develop of Phalguni waterway (National Waterway-43) in the first phase.

Kulai Fishing Harbour Project witnesses 12.5 % progress in six months, fishermen for extending length of breakwaters for smooth entry, exit of boats
ಕುಳಾಯಿ ಜೆಟ್ಟಿ: ಬ್ರೇಕ್ ವಾಟರ್ ವಿಸ್ತರಣೆಗೆ ಬೇಡಿಕೆ

Lakshadweep: ಹೀಗೇ ಆದ್ರೆ ಮಂಗಳೂರಿನಿಂದ ಲಕ್ಷದ್ವೀಪಕ್ಕೆ ದೋಣಿ-ಹಡಗು ಸಂಚಾರವೇ ಬಂದ್ ಆಗಬಹುದು! | Lakshadweep To Mangaluru boats may be stop if silt of phalguni river increased

Rs 70 crore water cruise project from Netravati to Bolar Sea face – Meeting ends up in chaos

Last edited by BolliBatlu; Feb 1, 2024 at 8:12 AM.
Reply With Quote
     
     
  #632  
Old Posted Mar 26, 2024, 3:38 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,124
Digital Kudla

ರೈತರೇ, ಸಹಾಯಧನ ಪಡೆಯಲು ಈ ಆ್ಯಪ್​ನಲ್ಲಿ ಬೆಳೆ ಮಾಹಿತಿ ಸಲ್ಲಿಸಿ

Life certificate through face recognition

Updated e-aasthi to help get e-khata for land in Mangaluru in 7-10 days

BSNL aggressively pushes Fibre to Home internet in DK Telecom District

Anvayaa is launching personalised eldercare services in Mangalore

Karnataka Bank enables online payment of customs duty

DK Police implement technology for effective patrols and crime detection

MCC starts biometric attendance for pourakarmikas

BSNL ups mobile network connectivity, to build 102 towers in coastal villages

Water consumers in Mangaluru can soon pay bills at doorstep through point of sale devices with bill collectors

Govt will reintroduce sand bazaar app, says Congress

In-Land real estate web portal launched to ease buying-selling-renting

Online system to make e-khata process simple

Expedite distribution of UDID cards, says DK DC Muhilan

MU tops in Karnataka for e-governance practices
Reply With Quote
     
     
  #633  
Old Posted Mar 26, 2024, 3:42 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,124
Smart Kudla

In-charge minister Sunil Kumar inspects Smart City work progress

Smart City projects will be completed by December: Min

Smart City Limited, MCC plant saplings as part of weeklong drive

Rains play spoilsport, woeful to complete smart city roads

Smart design!


Engineers' 'super brains' in Smart City projects has netizens in splits

ಮಳೆಗೆ ಬಯಲಾಯ್ತು ಸ್ಮಾರ್ಟ್ ಸಿಟಿ ಮಂಗಳೂರಿನ ಡ್ರೈನೇಜ್ ಅವ್ಯವಸ್ಥೆ | Mangaluru | Smart City | Rain

Blue Print of Netravathi Waterfront Development Project by Mangaluru Smart City Ltd(MSCL)
Quote:
•Project Cost: Rs 185 crs
• Waterfront will have a biodiversity park,bird watching area,outdoor gym,play area for children, pet park and boardwalk facility.
•Project Deadline:March 2023
MSCL Waerfront Development



‘Ensure works do not overlap at Tannirbhavi’

Onetouchmangaluru : App For Filing Complains And Information About The City
Smart City app for M’luru residents ready for launch
Integrated Command and Control Centre Enables Mangaluru Smart City to Leverage Real Time Data for City Operations

Integrated Command and Control Centre Enables Mangaluru Smart City to Leverage Real Time Data for City Operations

Smart City plan - Underpass to be built at Pumpwell
Quote:
The new underpass will be 5.5 meter in height and 10 meters wide. The Smart City officers say that the underpass will reduce the traffic jam at Pumpwell.

One underpass was built during the construction of an overbridge at Pumpwell. This underpass at Ujjodi, connects Kankanady from Indiana hospital. However, heavy vehicles cannot pass through this. So there is a possibility that the new underpass will have provision for bus movement.
Quote:
Earlier, though tender was called thrice, no company showed interest in the project as the cost was a whopping Rs 445 crore. Now the design is modified a bit and the project will cost Rs 100 crore.
Smart city horror - Elderly lady falls into open gutter near Jyothi

Integrated Command and Control Centre Enables Mangaluru Smart City to Leverage Real Time Data for City Operations

Just in paper?

ಲಕ್ಷಾಂತರ ಸಿಸಿ ಕೆಮರಾಗಳ ಜಿಯೋ ಟ್ಯಾಗಿಂಗ್; ಅಪರಾಧ ಪತ್ತೆ, ತನಿಖೆಗೆ ಅನುಕೂಲ

Whether these cameras have special eyes to monitor common people as per interests of elites?

Foundation Smart City Projects To Open Tomorrow

There will be no stoppage of funds for Mangaluru Smart City works: Kateel
MP Nalin Kumar Kateel inaugurates newly constructed pavilion in Mangala Stadium
Quote:
Mangaluru City is now in third position in implementing the projects of Smart City, which includes the concretization of roads, development of circles and sports complex, international swimming pool, Kabbadi and Shuttle courts, and several other projects to facilitate the sportsmen.

Today, the pavilion, physiotherapy, and gym have been introduced to the stadium, and soon the international swimming pool, Kabbadi, and shuttle courts will be launched. People should utilize this facility. Mangaluru is a growing city, and people from other districts are lauding the development program that took place in the city," he said.
Quote:
MLA Vedavyas Kamath said that the launch of waterfront and riverfront projects should be started. Rs 300 crores have been allocated for the waterfront project. On March 5th, the MP and District In-Charge minister will lay the foundation stone for these projects, and work will begin.

"There are government and private lands in the area, and it has taken time to include private land after proper negotiations. There was CRZ clearance, and even a foundation stone will be laid for the central market and Sultan Battery on the same day," the MLA said.
ಕೈಕೊಟ್ಟಿದೆ ಕ್ಲಾಕ್ ಟವರ್ ಕಾರಂಜಿ: ಮಂಗಳೂರಿಗೆ ಕಲಶಪ್ರಾಯವಾದ ಯೋಜನೆ ದುಸ್ಥಿತಿಗೆ
Clock Tower fountain not functioning due to poor maintenance
ಉದ್ಘಾಟನೆಗೂ ಮೊದಲೇ ಪಾಳು ಬಿದ್ದ ಕೋಟಿ ರೂಪಾಯಿ ಮೌಲ್ಯದ ಕ್ಲಾಕ್ಟವರ್

Rs 315 crore worth works to be set in motion on Sunday – MLA Vedavyas Kamath 2
Quote:
The projects to be launched include the construction of a central market costing Rs 114 crore, development of water resources regions costing Rs 140 crore, Sultan Battery Pedestrian Hanging Bridge works costing Rs 45 crore, and the Kadri road project costing Rs 16.5 crore. The inauguration ceremony will be attended by the district in charge minister, MP, and elected representatives.
MSCL projects to be launched tomorrow
Redeveloped Kadri Park road to be inaugurated on Sunday
Quote:
Central Market

Mr. Anchan said that rebuilding of the six-storey Central Market building will cost ₹114 crore. Somayaji Estates Pvt. Ltd. is the PPP partner. The building will have about five lakh sqft area of which the PPP partner will have to hand over 1.5 lakh sqft area to Mangaluru City Corporation (MCC) in the ground floor level as per the agreement. The building will come up on 3.6 acres of which 0.6 acres have been reserved for roads. The building will have lower ground, ground, upper ground, first, second and third floors. It will have parking facility for 650 cars, of which 500 cars will be on the terrace, and 150 two-wheelers. It will have refrigeration facility for storing fruits, vegetables, fish, and meat. There will be two escalators and 10 lifts. The PPP partner’s agreement with the MCC will be for 30 years and the partner will have to pay ₹3.07 crore to MCC every year. This payment amount will go up by 5% every year till 30 years.
Inauguration of Redeveloped Kadri Park Road & Launch of 3 Smart City Projects on Sunday
Quote:
“The building will come up on 3.6 acres of which 0.6 acres have been reserved for roads. The building will have lower ground, ground, upper ground, first, second and third floors. It will have a parking facility for 650 cars, of which 500 cars will be on the terrace, and 150 two-wheelers. It will have a refrigeration facility for storing fruits, vegetables, fish, and meat. There will be two escalators and 10 lifts. The PPP partner’s agreement with the MCC will be for 30 years and the partner will have to pay Rs 3.07 crore to MCC every year. This payment amount will go up by 5% every year till 30 years”.
₹732 crore spent on Mangaluru Smart City projects in the last four years: Nalin Kumar Kateel

Much-awaited bicycle track plan under Smart City project almost shelved 2
Smart City cycle track project is in doldrums
Technical Reasons Put a Hold on Smart City Cycle Track Project

Mangaluru Smart City projects are lagging, says Dinesh Gundu Rao

Mangaluru Smart City projects are lagging, says Dinesh Gundu Rao
Smart City waterfront project gains momentum
Dinesh Gundu Rao pulls up officials over delay in Smart City work completion
Quote:
Riverfront projects The MSCL MD said that riverfront projects worth Rs 185.48 crore has been planned. However, the works could not be taken up due to failure to get CRZ clearance. Nair Kudru development proposal was sent as per the CRZ notification of 2011. However, the authorities have asked to prepare an island management plan as per CRZ 2019 notification. Promenade works as a part of river front project is planned on 2.1-km stretch on the waterfront from Nethravathi river bank to Gurpura river bank. Some stretches have land issues. The work on the pedestrian bridge in Suthan Bathery too is waiting for CRZ clearance.
No takers for 38 shops built by Mangaluru Smart City Limited near Kadri Park

Annual grant of ₹25 crore for tourism development is abysmally low, says Vedavyas Kamath
Quote:
Stating about the river front development project taken up by Mangaluru Smart City Limited, Mr. Kamath said there will be a garden, birdwatching facility, and cycle track in this ₹200-crore project, which is coming up on government land and private lands.
Stakeholders Oppose Netravati Riverfront Promenade Work- Meet Minister Dinesh Gundu Rao

What is promenade development under Netravathi Waterfront Development Project ?
Quote:
What is promenade development under Netravathi Waterfront Development Project taken up under Mangaluru Smart City Mission?

According to MSCL, promenade development is one of the key features of the project. It includes setting up a biodiversity park and creation of a bird-watching area near the Netravati railway bridge, building a pathway of 6 m width for a stretch of 2.1 km and laying a cycle track of 3 m width from the bridge to Bolar sea face.

The other facilities to be created include establishing an outdoor gym, creating a cycle stand, and a buggy point for the introduction of buggies, setting up of play area for children, a pet park, and developing a park with seating arrangements and landscaping.

In addition, there will be a ghat to enable the visitors to touch the water. A boardwalk facility will be created inside the waters at the south point. It will have a boat making experience yard. The entry and exit plaza will be built near the Netravati bridge.

There will be decks, kiosks for shops, ticket counter, security, washrooms, and other public amenities. A sewage treatment plant too will be constructed. The treated water will be used for watering parks and gardens.

The promenade development project, which will be taken up in two phases, will cost about ₹60 crore. Phase I will be from Netravati bridge to south point covering 1.3 km and phase II will be from south point to Bolara sea face, covering 0.75 k.m.

According to the MSCL, the waterfront promenade development is proposed to re-engage the city with the varied water-related experiences that its settings provide.

It intends to connect the city to the river and the sea with the help of proposed landmarks and nodes. These landmarks and nodes are further connected to the city through a series of road network that will act as pendants between the city and the promenade.
33 projects under Smart City Mission in progress in Mangaluru: Nalin Kumar Kateel

Go ahead with Netravathi Riverfront Promenade on available land, says Kateel
Quote:
When Mr. Kateel visited the work site in Mulihitlu, MSCL officials said of the 2.25 km proposed promenade, 1.75 km of port land was available to execute the work while private persons were still holding on to about 500 metre long land on lease.
Smart City project to be inspected every fortnight

DC directs MSCL to take possession of land for Netravathi riverfront promenade project

ಮಂಗಳೂರು ಸ್ಮಾರ್ಟ್ ಸಿಟಿ ಹೆಸರಿನಲ್ಲಿ ನೇತ್ರಾವತಿ ನದಿ ಒಡಲನ್ನು ಬರಿದು ಮಾಡ ಹೊರಟ ಧೂರ್ತರು..!

Netravathi riverfront promenade seeks to reconnect people with rivers MSCL
Quote:
Once people start visiting the riverbank, illegal activities including river encroachment, will stop, say officials
Quote:
Estimated to cost around ₹70 crore, ... The 2.2 km promenade from Netravathi Bridge of NH-66 at Jeppinamogaru to Bolara Sea Face would have a 6’ wide walkway and 3’ wide bicycle track.

Wooden walkway

The walkway and bicycle tract between the road bridge and the railway bridge would be on wooden bridge amid the Mangroves ... Five-six small roads towards Netravathi would be widened to 6 mt ... a biodiversity park ... route the walkway above the boatyards ...

Mr. Prabha said dialogues are on with the leaseholders of port land where the promenade would pass, to get that land. ...
MSCL app to track school bus movements in city

MSCL will develop Yemme Kere ground at a cost of ₹2 crore, says Mayor

Urban Development Minister asks MSCL to drop plans of developing Nayar Kudru island under Smart City Mission
Minister Byrathi Suresh to review 2.1–km road works under waterfront project in Mangaluru
Urban development min to review promenade project

Dinesh Gundu Rao inspects Netravathi waterfront project works

MSCL officials asked to work together with landholders to push forward promenade project

ಮಂಗಳೂರಿನ ನೇತ್ರಾವತಿ ತಟದಲ್ಲಿ ವಾಕಿಂಗ್, ಸೈಕ್ಲಿಂಗ್ ಟ್ರ್ಯಾಕ್!: 2 ಕಿಮೀ ದಾರಿಯಲ್ಲಿ ಹತ್ತಾರು ಕಾಮಗಾರಿ
Quote:
ಏನೆಲ್ಲಇರುತ್ತೆ?ಕೇವಲ ವಾಕಿಂಗ್, ಸೈಕ್ಲಿಂಗ್ ಟ್ರ್ಯಾಕ್ ಮಾತ್ರವಲ್ಲದೆ 2.1 ಕಿ.ಮೀ. ಉದ್ದದ ನದಿ ತೀರದಲ್ಲಿ10 ಪ್ರಮುಖ ಯೋಜನೆಗಳನ್ನು ಕೈಗೊಳ್ಳಲಾಗುತ್ತಿದೆ. ನದಿ ತೀರದ ಆರಂಭಿಕ ಭಾಗದಲ್ಲಿಪಾರ್ಕಿಂಗ್ಗೆ ಅವಕಾಶ ಮಾಡಿಕೊಡಲಾಗುತ್ತದೆ. ನಂತರ ಜನರು ನಡೆದುಕೊಂಡು ಅಥವಾ ಸೈಕ್ಲಿಂಗ್ ಮೂಲಕ ಭೇಟಿ ನೀಡಬಹುದು ಮತ್ತು ಸಮಯ ಕಳೆಯಬಹುದಾಗಿದೆ.

ಈಗಾಗಲೇ ಶೇ.10 ರಷ್ಟು ಕಾಮಗಾರಿ ಆಗಿದೆ. ಇದು ರಸ್ತೆಯಲ್ಲ, ವಾಕಿಂಗ್, ಸೈಕ್ಲಿಂಗ್ ಟ್ರ್ಯಾಕ್ ಜತೆಗೆ ಪಾರ್ಕ್ ಹಾಗೂ ನಾನಾ ಆಕರ್ಷಣಿಯ ಸ್ಥಳಗಳನ್ನು ನಿರ್ಮಿಸಲಾಗುತ್ತಿರುವ ಹಿನ್ನೆಲೆಯಲ್ಲಿ ಆರಂಭಿಕ ಹಂತದ ಯೋಜನೆಗೆ 70 ಕೋಟಿ ವ್ಯಯಿಸಲಾಗುತ್ತಿದೆ.
ಅರುಣ್ ಪ್ರಭ, ವ್ಯವಸ್ಥಾಪಕ ನಿರ್ದೇಶಕ, ಸ್ಮಾರ್ಟ್ ಸಿಟಿ ಮಂಗಳೂರು.

ಜೈವಿಕ ವೈವಿಧ್ಯ ಉದ್ಯಾನ (ಬಯೋ ಡೈವರ್ಸಿಟಿ ಪಾರ್ಕ್) ನದಿ ತೀರದ ಕೆಲವು ಸಸ್ಯಗಳ ಜತೆಗೆ ಇನ್ನಿತರ ಕೆಲವು ಪ್ರಮುಖ ಗಿಡಗಳನ್ನು ಸಂರಕ್ಷಿಸಿ ಅದರ ಬಗ್ಗೆ ಜನರಿಗೆ ಮಾಹಿತಿ ನೀಡುವ ಜತೆಗೆ, ನೀರಿನ ನಡುವೆ ಸಣ್ಣ ಬ್ರಿಡ್ಜ್ಗಳನ್ನು ನಿರ್ಮಿಸಿ ಪಾರ್ಕಿನಲ್ಲಿಜನರಿಗೆ ಸಂಚರಿಸಲು ವ್ಯವಸ್ಥೆ ಮಾಡಲಾಗುತ್ತದೆ.

ಪಕ್ಷಿ ವೀಕ್ಷಣಾ ಪ್ರದೇಶ (ಬರ್ಡ್ ವಾಚಿಂಗ್ ಏರಿಯಾ): ನದಿ ತೀರದಲ್ಲಿಕುದ್ರು ಇದ್ದು ಇದಕ್ಕೆ ಜನರ ಸಂಚಾರಕ್ಕೆ ಅವಕಾಶ ಇಲ್ಲ. ಆದರೆ ಕುದ್ರುವಿಗೆ ಆನೇಕ ಪಕ್ಷಿಗಳು ವಲಸೆ ಬರುತ್ತದೆ, ಆದ್ದರಿಂದ ಇದನ್ನು ನದಿ ತೀರದಿಂದ ವೀಕ್ಷಣೆ ಮಾಡಲು ಪ್ರದೇಶವನ್ನು ಸುಂದರಗೊಳಿಸಿ ವ್ಯವಸ್ಥೆ ಮಾಡಲಾಗುತ್ತದೆ.

ಜಪ್ಪು ಫೆರ್ರಿ: ಫೆರ್ರಿಗಳ ನಿಲುಗಡೆಗೆ ವ್ಯವಸ್ಥೆ ಮಾಡಿ, ಬೋಟ್ಗಳಲ್ಲಿ ಸಂಚಾರಕ್ಕೆ ಅವಕಾಶ.
ಟೈಲ್ ಫ್ಯಾಕ್ಟರಿ ಏರಿಯಾ: ಈ ಭಾಗದಲ್ಲಿ ಮುಚ್ಚಿಹೋಗಿರುವ 10ಕ್ಕೂ ಹೆಚ್ಚು ಹಂಚಿನ ಕಾರ್ಖಾನೆಗಳನ್ನು ಮ್ಯೂಸಿಯಂ, ಆಡಿಟೋರಿಯಂ ಆಗಿ ಪರಿವರ್ತಿಸುವ ಯೋಜನೆ.
ಸೌತ್ ಪಾಯಿಂಟ್: ಮಂಗಳೂರು ನಗರದ ಕೊನೆಯ ಜಾಗವಾಗಿರುವ ಈ ಪ್ರದೇಶದಲ್ಲಿಜೆಟ್ಟಿಗಳನ್ನು ನಿರ್ಮಿಸಿ, ಸಣ್ಣ ದೋಣಿ, ಬೋಟ್ಗಳ ಸಂಚಾರಕ್ಕೆ ಅವಕಾಶ.
ವೆಟ್ಲ್ಯಾಂಡ್ಸ್: ಕಲುಷಿತ ನೀರು ನದಿಗೆ ಸೇರದಂತೆ ನೈಸರ್ಗಿಕವಾಗಿ ಸಂಸ್ಕರಿಸುವ ಪ್ಲ್ಯಾನ್.
ಓಪನ್ ಏರ್ ಥಿಯೇಟರ್: ಏರ್ ಥಿಯೇಟರ್ ಅಭಿವೃದ್ಧಿಯಾಗುವ ಜಾಗ ಮಂಗಳಾದೇವಿ ದೇವಸ್ಥಾನಕ್ಕೆ ಕೇವಲ 150 ಮೀ. ದೂರವಿದೆ, ಆದ್ದರಿಂದ ದೇಗುಲಕ್ಕೆ ಬಂದವರು ನ
ನದಿ ತೀರಕ್ಕೆ ಬರುವಂತೆ ಘಾಟ್ ರೀತಿ ಅಭಿವೃದ್ಧಿಪಡಿಸುವ ಯೋಜನೆ.
ಪೆಟ್ ಪಾರ್ಕ್ ಮತ್ತು ಸ್ಟೋರ್: ನಾಯಿ ಹಾಗೂ ಇನ್ನಿತರ ಸಾಕು ಪ್ರಾಣಿಗಳನ್ನು ನದಿ ತೀರಕ್ಕೆ ಕರೆದುಕೊಂಡು ಬಂದು ಸಮಯ ಕಳೆಯುವುದಕ್ಕಾಗಿ ಪಾರ್ಕ್ ನಿರ್ಮಾಣ.
ಬೋಟ್ ಬಿಲ್ಡಿಂಗ್ ಯಾರ್ಡ್: ಬೋಟ್ಗಳ ತಯಾರಿ ಮತ್ತು ರಿಪೇರಿ ನಡೆಯುತ್ತಿದ್ದು ಅದನ್ನು ಯಾರ್ಡ್ ಒಳಗೆ ಹೋಗಿ ಜನರಿಗೆ ವೀಕ್ಷಣೆ ಮಾಡಲು ವ್ಯವಸ್ಥೆ.
ಬೋಳಾರ ಸಮುದ್ರ ಭಾಗ: ಬೋಳಾರ ಸಮುದ್ರ ಭಾಗದಲ್ಲಿಸಣ್ಣ ಮಟ್ಟದಲ್ಲಿರುವ ಸಮುದ್ರ ವೀಕ್ಷಣಾ ಜಾಗವನ್ನು ದೊಡ್ಡ ಮಟ್ಟದಲ್ಲಿಅಭಿವೃದ್ಧಿ ಮಾಡಿ, ಸಣ್ಣ ಬ್ರಿಡ್ಜ್ಗಳ ರೀತಿ ನಿರ್ಮಿಸಿ ವ್ಯೂ ಪಾಯಿಂಟ್ ಮಾದರಿ ಅಭಿವೃದ್ಧಿ.
Activist alleges misuse of Smart City funds

MSCL initiates road widening for Mangaluru Waterfront Project Area

MSCL Rs 4.75 Crore ‘Skill Development Centre’ Inaugurated in Feb 2023 Remains CLOSED

DC Directs Officials to Ensure the Timely Completion of Pending Smart City Works

Expedite Smart City works: DC

All departments should cooperate in execution of the waterfront promenade project, says Dinesh Gundu Rao

"70 ಕೋಟಿ ರೂ. ಖರ್ಚು ಮಾಡಿ ತಾತ್ಕಾಲಿಕ ಕಟ್ಟಡ ಕಟ್ಟೋದಂತೆ.." | Mangaluru | Smart city
Boatyard operators, fish net makers demand compensation from government for move to vacate them from Promenade project area
Protest warned over riverfront project



Meeting to give information on Netravati Riverfront Promenade Project ends amid chaos
Riverfront Project Chaos Marks Mscl Meeting

Mangaluru waterfront development project under Smart City Mission can’t be completed within deadline, says Urban Development Minister

NGT takes suo moto cognisance of Netravati riverfront project in Mangaluru, constitutes committee for spot inspection
Reply With Quote
     
     
  #634  
Old Posted Mar 26, 2024, 3:46 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,124
Healthcare

Hemophilia Treatment Centre inaugurated at Kasturba Hospital

Zulekha Yenepoya Institute of Oncology opens in M’luru

ಹೆಚ್ಚುವರಿ ಆಯುಷ್ ಕೇಂದ್ರಕ್ಕೆ ಪ್ರಸ್ತಾವ

Advanced Immunoanalyzer inaugurated at Kasturba Hospital Manipal

Producer Abhishek Rao sets up an oxygen plant in Mangalore

KMC Hospital demonstrates world-class quality outcomes for Knee & Hip patients

14 ‘Namma’ medical clinics to come up in Dakshina Kannada

A.J Hospital Has First Successfully Performed Lung Surgery For Rare Congenital Disease

Oasis Fertility Centre inaugurated at A J Hospital

ಉಡುಪಿಯಲ್ಲಿ ಪೈಲಟ್ ಯೋಜನೆ; ತಂಬಾಕು ಮುಕ್ತ ಅಪಾರ್ಟ್ಮೆಂಟ್

Healthcare sector attracts students, patients from far and wide

KMC Hospital, Mangalore to Utilize WhatsApp Chatbot to Facilitate Appointment Services

State-of-the-art Neuro-ENT-Navigation System inaugurated at Mangala Hospital

Namma Clinics will start functioning in DK by December-end: DHO

Advanced cath lab inaugurated at Indiana Hospital

ಕುಕ್ಕೆ ಸುಬ್ರಹ್ಮಣ್ಯಕ್ಕೆ ಸುಸಜ್ಜಿತ ಆಸ್ಪತ್ರೆ ಬೇಕು ಎಂದು ಭಕ್ತರ ಒತ್ತಾಯ

ಪಶು ಸಂಜೀವಿನಿ ದಕ್ಷಿಣ ಕನ್ನಡ ಜಿಲ್ಲೆಗೆ 9 ವಾಹನ

ICU for high-risk pregnancy to be opened at Lady Goschen

Land finalised to build Ayush Sports Medicine Centre in Mangaluru
Quote:
The government has sanctioned 30 cents of land near Karavali Utsav ground for the purpose. After finalising the land, a Detailed Project Report (DPR) was submitted to the Ayush department of the central government.
Neuropathology Lab opens First Neuro Brain and Spine Super Speciality Hospital
Quote:
First Neuro Brain and Spine Super Speciality Hospital’s Neuropathology Lab is unique in being the only one of its kind in the city that supports the diagnosis of all biopsies of the central and peripheral nervous system and muscles.

First Neuro Brain and Spine Super Specialty hospital, is the only state-of-the-art hospital in Karavali Karnataka and North Kerala specialised in neurosciences with an exclusive team for brain and spine related problems.

So far in Karnataka such a facility was available only in NIMHANS, Bengaluru.

For the first time a state-of-the-art neuropathological lab of this type is available at First Neuro Brain and Spine Super Speciality Hospital, Mangaluru, in the sector of private hospitals in the state.
Inauguration of the SPECT facility at Zulekha Yenepoya Institute of Oncology
SPECT Facility inaugurated at Zulekha Yenepoya Institute of Oncology

Isolation ward set up at Wenlock hospital over Covid scare

KMC Hospital Attavar receives highest level of NABH certification for nursing services

ಉಡುಪಿಯ ಇಎಸ್ಐ ಆಸ್ಪತ್ರೆ ನಿರ್ವಹಣೆ ರಾಜ್ಯ ಸರಕಾರದಿಂದ ಕೇಂದ್ರಕ್ಕೆ ಪ್ರಸ್ತಾವನೆ

KMC Hospital releases video on 'Traffic Behaviour - Make Way for the Ambulance'

ಕರಾವಳಿಯಲ್ಲಿ ಫುಡ್ ಟೆಸ್ಟ್ ಲ್ಯಾಬ್ಗಳೇ ಇಲ್ಲ ರಾಜ್ಯದಲ್ಲಿ 4 ಕಡೆ ಮಾತ್ರ ಲ್ಯಾಬ್ ಸೆಂಟರ್ ವರದಿಗೆ ಕಾಯಬೇಕು ಒಂದು ವಾರ!

ಮಂಗಳೂರಿನಲ್ಲಿ ಆಯುಷ್ಮತಿ ಮಹಿಳಾ ಕ್ಲಿನಿಕ್ ನಾಲ್ಕು ಪ್ರಾಥಮಿಕ ಆರೋಗ್ಯ ಕೇಂದ್ರದಲ್ಲಿ ಸ್ಥಾಪನೆ, ನಗರ ಭಾಗದಲ್ಲಿ ಸೌಲಭ್ಯ ಲಭ್ಯ
Ayushmati women clinic to be established in four PHCs

Lady Goschen hospital’s breastmilk bank receives good response

Lack of NABL-accredited food testing labs haunt Dakshina Kannada, Udupi

Niasha Ayurveda – For vedic healing in its most authentic form

Preventive Oncology Clinic and Colposcope Facility Inaugurated at Zulekha Yenepoya Institute of Oncology

ಪುತ್ತೂರು ಸಮುದಾಯ ಆರೋಗ್ಯ ಕೇಂದ್ರವಾಗಿ ಪಾಣಾಜೆ ಕೇಂದ್ರ ಮೇಲ್ದರ್ಜೆಗೆ

Manipal Comprehensive Liver Clinic (MCLC) Launched at KMC Hospital, Mangaluru

Govt Ayush hospital set to introduce hydrotherapy

Telemedicine ECG unit mooted at Kukke temple in Karnataka

Forums to protest against PPP model for fully-funded medical colleges

Coastal dists get 5 Ayushmati Clinics

New polyclinic building for cattle and pets opens in Mangaluru

Govt AYUSH hospital in Mangalore set to introduce hydrotherapy facility

Dr H S Ballal Inaugurates Advanced Multi Slice CT Scan Machine at KMC Attavar

New Rs 2.10 Crore DK District Vet Polyclinic Ready to Treat Your Pets & Domestic Animals

SDM Law College Mediation Centre Most Sought By Lawyers

Kateel appeals to Union government to open CGHS wellness centre in Mangaluru

Ayush Hospital to be upgraded within a month - Dr Mohammed Iqbal
District Wenlock Ayush Hospital to have a Sophisticated Operation Theatre (OT) by Aug End

ರೊಬೋಟಿಕ್ ತಂತ್ರಜ್ಞಾನ ಆಧಾರಿತ ಕೀಲು ಬದಲಾವಣೆ ಘಟಕ ಉದ್ಘಾಟನೆ
First-of-its-kind joint replacement robotic unit inaugurated at Yenepoya hospital

Dinesh Gundu Rao opens First Neuro Brain & Spine Hospital's Advanced Neuro Radiology

ಮಂಗಳೂರಿನ ವೆನ್ಲಾಕ್ ಆಸ್ಪತ್ರೆಯ ಡಯಾಲಿಸಿಸ್ ಯಂತ್ರಗಳಿಗೆ ರೋಗ ಬಾಧೆ, ದುರಸ್ತಿಯಾಗುತ್ತಿಲ್ಲ ಯಂತ್ರಗಳು !

Fr Muller Medical College Hospital launches 3T MRI, foetal imaging USG, Kranium tech

Mangaluru City Master Plan Draft To Be Ready Soon

KMC Hospital Attavar Inaugurates 30 bedded Physical Medicine and Rehabilitation (PMR) Department

Mangaluru Smart City Limited drops plan to close Railway Station Road
Quote:
Mr. Rao said foundation stone for the new 50-bedded critical care unit at the cost of ₹25 crore will be laid in another two months. He said new that integrated public health laboratory will come up in the building housing District Early Intervention Centre.
Quote:
The Minister asked Dr. Sadashiva to form a committee, which includes representatives from KMC Mangaluru, for preparing a plan of action to put to use the new surgical block. Dr. Sadashiva said ₹8.79 crore worth new equipment and ₹2.17 crore of civil works were needed for the surgical block built by the MSCL.
‘Easy Ayurveda Hospital’ inaugurated at Morgans Gate
Quote:
Easy Ayurveda Hospital is a 55-bed hospital with all kind of facilities, deluxe rooms, general wards, pharmacy, operation theatre, and full-fledged panchakarma therapy. The hospital offers all kinds of therapies from hair to toe, mind and body related treatment as well.
KMC Hospital inaugurates 'Emergency Medicine Club Mangalore' (EMCM)

Govt Provides 12 Acre Land to Set Up a Hospital & Rehabilitation Centre for Stray Animals

Dengue Case ಕರಾವಳಿಯಲ್ಲಿ ಈ ಬಾರಿ ದಾಖಲೆ ಡೆಂಗ್ಯೂ

DK to form village-level teams to support endosulfan victims

Health Minister to open surgery, physiotherapy and laboratory units at Govt. AYUSH Hospital in Mangaluru on December 2

MDIndia Health Insurance TPA Expands Footprint with Inauguration of its brand-new state-of-the-art Office in Mangalore, Karnataka

Pvt institute to maintain govt hospital in Ullal

Brain Tumour Removal Surgery Life-saving Brain Tumour Removal Surgery Performed

DC directs to set up cath lab at Wenlock District Hospital

Healthcare expansion along the coast “Namma Clinic” plans new centers in DK & Udupi

Health dept plans to expand Namma Clinics in DK dist

Govt committed to provide better health facilities: Min

Cancer care centre opened at Kasturba Medical College Hospital, Attavar

Medicinal plants preserved at PHC

MP urges min to upgrade ESI hospital

ಮಂಗಳೂರಿಗೆ CGHS ವೆಲ್ನೆಸ್ ಸೆಂಟರ್ ಮಂಜೂರು: ನಳಿನ್ ಹರ್ಷ
Centre gives nod for CGHS wellness centre in Mangaluru

SDPI demands govt medical college, super speciality hospital with 1000 beds in Mangaluru

First Neuro Hospital accredited as advanced stroke centre by QAI of India
[QUOTE]
First Neuro Brain and Spine Super Speciality Hospital is the 12th in the country and 3rd in Karnataka and only one in this region to get the accreditation.
[/QUOTE

What To Expect And What Not To Expect From The CM’s 15th Budget
Quote:
What seemed to be the most awaited moment among the citizens of the state has sadly turned out to be severe disappointment as CM Siddaramaiah seems to have merely let down the people of his state, with the 15th budget which, when presented, showed as just a fluff.
Mangaluru is second in tax payment but no where in getting it back.

Urban Development Minister asks Mangaluru civic body to prepare action plan for ₹200 crore special grant announced in Karnataka budget

AJ Hospital and Research Centre launches ‘Vayah Vikas’ nodal center

New multi-speciality hospital to come up in New Mangalore Port by September 2026

ವೆನ್ಲಾಕ್ ಆಸ್ಪತ್ರೆಗೆ ಕ್ರಿಟಿಕಲ್ ಕೇರ್ ಬ್ಲಾಕ್; ಒಂದೇ ಕಡೆಯಲ್ಲಿ ಎಲ್ಲ ವ್ಯವಸ್ಥೆ

Fr Muller Rotary Skin Bank inaugurated at medical college hospital
Reply With Quote
     
     
  #635  
Old Posted Mar 26, 2024, 3:50 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,124
Waste Management

Bengaluru-based firm asked pay cost of defective waste management plant

Startup awaits nod from MCC to start waste mgmt

ಗೊಬ್ಬರವಾಗಲಿದೆ ಪಚ್ಚನಾಡಿ ತ್ಯಾಜ್ಯ! ಬಯೋಮೈನಿಂಗ್ ವ್ಯವಸ್ಥೆಗೆ ಕಾರ್ಯಾದೇಶ

MCC’s WhatsApp connect to keep city clean yields results

Corporation to have system in place for disposing off construction waste in Mangaluru
City councillors want proper system for solid waste management

ಜಿಲ್ಲೆಯ ಪ್ರಥಮ ಎಂಆರ್ಎಫ್ ಘಟಕ ಅಕ್ಟೋಬರ್ನಲ್ಲಿ ಕಾರ್ಯಾರಂಭ

Intl Coastal Cleanup Day observed by Kar Coast Guard No 3 New Mangalore

Mangalore Has Been Selected For A Study Of Sustainable Solid Waste Management By Government

Laundryman teaches kids to make seed paper pens in Karnataka

M’luru Shortlisted For Hygiene Award

City ranks fifth in Swaccha survey campaign in Karnataka, 146th in India

Eco-friendly 'crackers' grow into vegetable plants

TAC recommends sewage surveillance in Mangaluru, north Karnataka

MCC council urges Karnataka govt. to extend SWM contract term of Antony Waste Handling Cell Pvt. Ltd. by six more months
Tender Coconut Sellers making MESS, MCC to Charge them with Solid Waste Management CESS

"Antony Waste" is a big Waste!

Before Antony Waste our Paura Karmikas used to keep roads clean by collecting roadside garbage regularly. Now everything is dirty. Make alternate arrangement please.

ಬೆಳ್ತಂಗಡಿ: ಪ್ಲಾಸ್ಟಿಕ್ ನಿರ್ಮೂಲನೆ ಅಸ್ತ್ರ ಎಂಆರ್ಎಫ್ ಘಟಕ

Miyawaki Forest: ನೆಕ್ಕಿಲದ ಡಂಪಿಂಗ್ ಯಾರ್ಡ್ ಬಳಿ ಸಮತಟ್ಟು

MCC keen on getting 9 lakh tonnes of legacy waste at Pachchanady cleared in two years: Commissioner

Moodbidri TMC plans zero-waste Kambala

ಕಸದಿಂದ ವಿದ್ಯುತ್ ಉತ್ಪಾದನೆ ರಾಜ್ಯಕ್ಕೆ ವಿಸ್ತರಿಸಲು ಯೋಚನೆ: ಸುಳ್ಯದಲ್ಲಿ ಗ್ಯಾಸಿಫಿಕೇಶನ್ ಯಂತ್ರ ಉದ್ಘಾಟನೆ

ಪಚ್ಚನಾಡಿ ಬಯೋ ಮೈನಿಂಗ್ ಪ್ರಕ್ರಿಯೆ; ಟೆಂಡರ್ ಅವಧಿ ಇಳಿಕೆ

ಪಚ್ಚನಾಡಿ ಬಯೋ ಮೈನಿಂಗ್ ಪ್ರಕ್ರಿಯೆ; ಟೆಂಡರ್ ಅವಧಿ ಇಳಿಕೆ

First Material Recovery Facility of Dakshina Kannada becomes operational
Material recovery facility for 51 villages commissioned
ತ್ಯಾಜ ಸಮಸ್ಯೆಗೆ ಎಂಆರ್ಎಫ್ ಪರಿಹಾರ: 99 ಗ್ರಾಮಗಳಲ್ಲಿ ಸಮಗ್ರ ತ್ಯಾಜ್ಯ ನಿರ್ವಹಣಾ ಘಟಕ ಉದ್ಘಾಟಿಸಿದ ಸಚಿವ ಸುನೀಲ್ ಕುಮಾರ್

Waste management: MCC plans to acquire 10 acres in Pachanady
New pavilion at Mangala stadium in Mangaluru inaugurated
Mcc’s Move To Acquire Land At Pachanady Opposed

Two solid waste management units start functioning in DK on pilot basis

Fire noticed at hillock close to Pachanady dump yard, doused

The Story of Gatta Tech! A New Idea of Converting Waste Plastic into Something Valuable

St Agnes College Students collect e-waste

Antony Waste's garbage handling contract in city extended till July

"Antony Waste" is a big Waste!

Before Antony Waste our Paura Karmikas used to keep roads clean by collecting roadside garbage regularly. Now everything is dirty. Make alternate arrangement please.

KSPCB warns of penal action against manufacturing, storage, and using biodegradable single-use plastic products

ಅಲೆವೂರಿನ ಕರ್ವಾಲಿನಲ್ಲಿ ನಗರಸಭೆಯ ಒಣತಾಜ್ಯ ನಿರ್ವಹಣಾ ಘಟಕ ಉದ್ಘಾಟನೆ

Fire breaks out again at legacy waste site in Pachchanady

Converting wet waste into manure can solve burning issue of handling solid waste, says CMC president

Garbage piles up in Mangaluru as strike by section of sanitary workers continues

Waste handling firm told to deploy 80 vehicles for collecting garbage from today

MLA Vedavyas Kamath begins war room to attend garbage woes in city


Mangaluru City Corporation opens RRR (Reduce, Reuse, and Recycle) centres to collect reusable items

AWHCL likely to continue waste collection: Mayor

Take immediate measures to prevent sewage flow into rivers, District Secretary tells DC

Govt approves purchase of Rs 27.15 crore worth waste collecting vehicles for MCC

Swachh Mangaluru Foundation to start its bimonthly lecture series from Sunday

Urban Development Dept Serves Notice to MCC for Floating Tenders without Nod for Hauling Garbage

First pink toilet for women in Bantwal getting ready with facilities

ಸ್ಮಾರ್ಟ್ ಸಿಟಿ ಮಂಗಳೂರಿನಲ್ಲಿ ಮೂತ್ರ ವಿಸರ್ಜನೆಗೆ ಮಹಾ ಸಮಸ್ಯೆ! ಹಲವೆಡೆ ಶೌಚಾಲಯಗಳು ಬಂದ್, ಇದ್ದರೂ ನಿರ್ವಹಣೆ ಇಲ್ಲ

Concern over defunct STPs in city

Teething issues for new waste mgmt plan

‘Plog and Walk’ held at Karinjeshwara Temple

Mayor promises steps to prevent sewage discharge into rivers

MCC council approves ₹8.29 crore annual action plan for operation and maintenance of 153 new vehicles, and to pay salaries of drivers, loaders, helpers, and supervisors

MCC to diversify dry waste processing to reduce pressure on Pachchanady dumping yard

Coco peat unit at dumpyard a boon for M’luru City Corp

MCC begins using new vehicles for solid waste collection, transportation

APD Foundation Proposes Enhanced Waste Management Practices

Mangaluru City Corporation slips to 253rd place in Swachh Survekshan survey

FMCON, CODP initiate reducing, recycling waste plastics project
Initiative to reuse plastic

MCC to appoint drivers for waste collection vehicles

Valedictory of ICMR-funded clinical training on ‘Management of Biomedical Waste’ held

Forum reviving lake in Pakshikere where Udupi jumbos would drink

Hejje Campaign: ಮಂಗಳೂರಿನಲ್ಲಿ 'ಹೆಜ್ಜೆ' ಅಭಿಯಾನ ಶುರು, ವಿನೂತನ ಪ್ರಯೋಗ ನೋಡಿ!

Environmentalists Sound Alarm Over Improper Catering Waste Disposal | News Karnataka
Greens alarmed over food waste dumped near forests

‘The Great Urinal Wall of Smart City-‘ Transformed into ‘The Great Warli Art Wall of Smart City-Mangaluru’!

ಕದ್ರಿ ದಕ್ಷಿಣ ವಾರ್ಡಿನ 60 ಲಕ್ಷದ ಅಭಿವೃದ್ಧಿ ಕಾಮಗಾರಿಗೆ ಶಾಸಕ ವೇದವ್ಯಾಸ ಕಾಮತ್ ಭೂಮಿ ಪೂಜೆ

ಗಬ್ಬೆದ್ದು ನಾರುತ್ತಿದ್ದ ಪ್ರದೇಶ ಈಗ ಸ್ವಚ್ಛ, ವರ್ಲಿ ಚಿತ್ರಗಳ ಮೂಲಕ ಸುಂದರ!

Greens clear up garbage strewn alongside Charmadi Ghat stretch

ದಕ್ಷಿಣ ಕನ್ನಡ ಜಿಲ್ಲೆಯ ಮೊದಲ ಪಿಂಕ್ ಟಾಯ್ಲೆಟ್ ಕಾರ್ಯಾರಂಭ; ಇದು ಕೇವಲ ಶೌಚಗೃಹವಲ್ಲ, ಇಲ್ಲಿದೆ ಹಲವು ಸೌಕರ್ಯ
Reply With Quote
     
     
  #636  
Old Posted Mar 26, 2024, 3:53 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,124
Water

Water rationing in Mangaluru from May 5; water to be supplied on alternate days

Drying up of Netravathi has nothing to do with Yettinahole project, says MP

Dist administration plans to survey dams using drones to solve water crisis

Drinking water issue worsens, level at Thumbe dam lowers further

ಭತ್ತ ಬೆಳೆಯದೆ ಬತ್ತಿದೆ ಅಂತರ್ಜಲ: ಕರಾವಳಿಯನ್ನು ಕಾಡುತ್ತಿದೆ ಬರಗಾಲ

Mangaluru Water Crisis: ಕೆರೆಗಳಲ್ಲಿ ನೀರು ಇದ್ರೂ ನೋ ಯೂಸ್!

Geomembrane tanks come up in coastal belt of Karnataka to harvest rainwater for farming

Prepare DPR for K-Shore Blue Pack Project to contain marine plastic waste menace, Eshwar Khandre tells officials
Minister Khandre directs detailed project report for Rs 840 cr coastal plastic waste mgmt

Natural technology being mulled for permanent solution for sea erosion
MIA handles 1,62,667 passengers in July, highest during current financial year
MIA making all-out efforts to introduce new and additional international flights

You can now apply for your UK visa at a hotel (Vivanta) near you

KCCI Urges CM for Urgent Need for Desalination Plant in Mluru to Address Water Shortages

KCCI urges Chief Minister to set up seawater desalination plants in DK and Udupi to combat looming water scarcity

Monsoon brings waves of dread to those living by the sea

ತುಂಬೆ ಡ್ಯಾಂನಲ್ಲಿ 50 ದಿನಗಳಿಗಾಗುವಷ್ಟೇ ನೀರು; ಕರಾವಳಿಗೂ ಜಲಕ್ಷಾಮ ಭೀತಿ!

'Groundwater overexploitation linked to uranium radiation risk'

KCCI requests CM for desalination plant

Water consumers in Mangaluru can soon pay bills at doorstep through point of sale devices with bill collectors

New Mangaluru Mayor says all efforts will be made to augment drinking water from Adyar vented dam

Of 15 ongoing vented dam projects in DK under Paschima Vahini, 12 will be over by year-end, says Minor Irrigation Minister

Sowing of fish to save fish breeds in Netravati, Phalguni & Shambhavi rivers

CRZ ಕ್ಲಿಯರೆನ್ಸ್ ವಿಳಂಬ ಖಾರ್ಲ್ಯಾಂಡ್ ಯೋಜನೆಗೆ ವಿಘ್ನ

NECF alleges dumping of debris on Netravathi river bank by Smart City Limited in Mangaluru

Varahi water supply to Udupi will start in February: KUIDFC officials

Mayor plans meeting to expedite Jalasiri project

Dakshina Kannada district administration to explore alternative water storage places
Quote:
“We are looking at water storage places in the upstream of these rivers and exploring on storage of additional water,” he said.

Officials are considering storing additional water at Adyar vented dam-cum-bridge, which can be pumped when the water level goes down at Thumbe vented dam - the main source of water for Mangaluru and surrounding areas.
DK sets up committee for water management

Arrangements made to let out treated sewage into Phalguni river downstream the Maravoor vented dam: Mangaluru Mayor

With depleting water table in DK and Udupi over a decade, need to build more ‘kattas’ in the coastal belt stressed

Dinesh Gundu Rao asks officials to be prepared to address drinking water issues in summer

Ensure there is no water crisis in DK: Gundurao
Quote:
Mangaluru: A proposal seeking Rs 100 crore to pay compensation for acquiring 33 hectares which will be submerged after the increase of water storage level at the Harekala dam, has been submitted to the government, an official from the minor irrigation department informed district minister Dinesh Gundurao.
Give priority to drinking water schemes: Minister

ಫಲ್ಗುಣಿ ನದಿಯ ಮೇಲೆ ಭೂಮಾಫಿಯಾ ಕಣ್ಣು, ನದಿಯೊಡಲು ಸೇರಿತು ಮಣ್ಣು

Crores Spend by MSCL on Rejuvenating City Lakes Remain Polluted-Money Gone Down the Drain

Moily Kere turns back to a slush pool due to lack of maintenance

40,000 tonnes of sand is available at non-CRZ areas in Dakshina Kannada, says Deputy Commissioner

There is a need for a clear policy on removing silt accumulated at vented dams: Dinesh Gundu Rao

Irked residents complain about discharge of wastewater into Kavoor lake

ಮಂಗಳೂರು-ಮೂಡುಬಿದಿರೆ “ಕುಡಿಯುವ ನೀರಿನ ಯೋಜನೆಗೆ” ಬೇಕು ವೇಗ

MCC will begin silt removal from rajakaluves soon: Mayor

Uproar by Corporators during MCC Council Meeting regarding Water Crisis & Failed JalaSiri Project

New pipeline on Adyar-Panambur stretch to augment 24x7 water project
Quote:
A water treatment plant (WTP) of 125 MLD capacity is being built near the new dam at Adyar-Harekala at an estimated cost of Rs 128 crore. ... A new pipeline of 1200mm diameter will have to be laid from Adyar to Padil and 900mm diameter pipeline from Padil to Panambur.
ದುರಂತ ವಿದ್ಯಮಾನ: ಮಂಗಳೂರಿನ ಜೀವನದಿ ಫಲ್ಗುಣಿ ವಿಷವಾಗುತ್ತಿದೆ -ಯಾಕೆ, ಏನಾಯ್ತು?

Illegal Water Connections & Rupture in Main Pipeline between Thumbe & Mluru Creates Water Crisis

Mayor proposes water supply board like BBMP for MCC

ಭವಿಷ್ಯದ ಮಂಗಳೂರಿಗೆ “ಮಳವೂರು ಡ್ಯಾಂ’ನಿಂದ ನೀರು!

ಮಂಗಳೂರು ಮಹಾನಗರಕ್ಕೆ ಕುಡಿಯುವ ನೀರಿನ ಕೊರತೆ ಸದ್ಯಕ್ಕಿಲ್ಲ; ಎಚ್ಚರಿಕೆ ವಹಿಸಲು ಅಧಿಕಾರಿಗಳಿಗೆ ಡಿಸಿ ಸೂಚನೆ

FO constructs ponds to mitigate water crisis for animals

Despite Thumbay Dam Being Filled, Drinking Water Crisis Persists

ಕಲುಷಿತವಾದ ಫಲ್ಗುಣಿ ನದಿಯ ಒಡಲು-ಕಂಪೆನಿ ವಿರುದ್ಧ ಗ್ರಾಮಸ್ಥರ ಆಕ್ರೋಶ..!

MCC launches helpline to complain about drinking water supply issues

Mayor Assures Steady Water Supply In Mangaluru This Summer

There is no discharge of affluents from MRPL to Phalguni: MRPL MD

Destruction of mangroves highlighted by organisation

Trust keen on maintaining the rejuvenated Gujjarkere Lake for its comprehensive good

Rationing of water likely to begin in Mangaluru city from April due to scarcity

ದಕ್ಷಿಣ ಕನ್ನಡದ ಕಿಂಡಿ ಅಣೆಕಟ್ಟಿನಲ್ಲಿ ನೀರಿನ ಸೋರಿಕೆ; ಮರಳು ದಂಧೆಯ ಪರಿಣಾಮ?

MRPL ನಿಂದಾಗಿ ನದಿಗೆ ಕೈಗಾರಿಕಾ ತ್ಯಾಜ್ಯ ಹರಿಯುತ್ತಿದೆ: ಮುನೀರ್ ಕಾಟಿಪಳ್ಳ | Mangaluru Phalguni River
Reply With Quote
     
     
  #637  
Old Posted Mar 26, 2024, 3:59 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,124
Land Transportation - Road

DK’s medical hub to get facelift through PPP mode

Transplantation of trees demanded to develop road

Greens oppose tree felling by NHAI along Mangaluru-Sanoor stretch of NH 169
NH169 Road Widening from Bikarnakatte-Mijar Greens Hope to Save 400 Trees

Green road effort Mangaluru’s medical hub tomorrow

Dakshina Kannada to get 100 CNG fuel stations in two years

MCC to look into demand for more auto rickshaw parking stands in Mangaluru

This means more footpahs will be converted as autorickshaw parks.

Four hanging bridges for rural connectivity this fiscal

ಮಂಗಳಾದೇವಿಯಲ್ಲಿ ಸಿಂಹ; ಮಾರ್ನಮಿಕಟ್ಟೆಗೆ ಹುಲಿ!

Minister Sunil Kumar lays foundation stone for Brahmashree Narayana Guru Circle

Development work at Maryhill junction worth Rs 1.40 crore begins

Underpass At Pumpwell Under Smart City Plan

ಸೂಕ್ತ ಪಾರ್ಕಿಂಗ್ ತಾಣವೇ ಇಲ್ಲ- ಬಿ.ಸಿ.ರೋಡ್ನಲ್ಲಿ ವಾಹನ ದಟ್ಟಣೆ ಹೆಚ್ಚಳ ; ವಾಹನ ನಿಲುಗಡೆಯೇ ಸಮಸ್ಯೆ

NHAI to build a vehicular overpass at KPT Junction soon
Quote:
... the overpass costing ₹25 crore will be built for the plying of vehicles between the airport road (KPT) and the circuit house.

The official said that another vehicular overpass will be built at Nanthoor Junction at a cost of about ₹22 crore. The proposal is likely to be finalised within a fortnight by selecting the contractor.

He told the meeting that 40 % of the project works of building a new bridge across the Phalguni river on the NH 66 at Kuluru in the city have been completed.
Tier 1, 2 cities contributing over 25% to volumes: Lamborghini India head

Work on road (Netravathi Bridge and Morgans Gate) in city gains momentum

MLA Vedavyasa Kamath lays foundation stone for bus terminal-cum-healthcare complex at Mangaladevi

Mangaluru City Corporation gets less than 100 suggestions on loop road

ರಾಷ್ಟ್ರೀಯ ಹೆದ್ದಾರಿ ಚತುಷ್ಪಥ ರೂಟ್ ಬದಲಾವಣೆ; ಮಂಗಳೂರು-ಕಾರ್ಕಳ ಅಂತರ ಇನ್ನು 45 ಕಿ.ಮೀ.!

Thokkottu-Deralakatte Road, though four lanes, does not offer a smooth ride

Minister says toll will not be collected on Malpe-Hebri highway after upgrade

Rajaji Park, pedestrian subway inaugurated
Rs 9 Crore State-of-the-Art Rajaji Park/Underpass near Town Hall Launched

Four-lane conversion of NH 169 – NECF accuses forest dept of scam

ಅರ್ಧದಲ್ಲೇ ನಿಂತಿರುವ ಮೇಲ್ಸೇತುವೆ ಕಾಮಗಾರಿ; ಸುಬ್ರಹ್ಮಣ್ಯ ರೋಡ್ ರೈಲು ನಿಲ್ದಾಣ

KSRTC Chairman highlights exclusion of transport infrastructure from ambit of Mangaluru Smart City project
KSRTC Mangaluru division to get 50 electric buses within a month
KSRTC to introduce package tours during weekend, Deepavali

Govt. will develop Marnamikatta, Urwa Market, Ambedkar Circles, says MLA

Decks cleared for widening Mangaluru-Karkala NH 169 into four lane
Quote:
Dakshina Kannada MP Nalin Kumar Kateel in a statement here said the work order was issued to the concessionaire, Sanur-Bikarnakatte Highways Ltd., that has to complete the work in two years from the Appointed Date at an estimated cost of ₹1,137 crore, excluding the cost of land acquisition.

The four-lane road starts from Bikarnakatte, off NH 75 in Mangaluru and ends at Sanur, about 5 km before Karkala in Udupi district. The 45 km project highway via Gurupura and Moodbidri would have a total width of 45 m, including 18-20 m of carriageway, medians, pavements and other infrastructure. Two bypasses — Gurupura (5.5 km) and Moodbidri (7 km) — are part of the project highway.
12 ಕೋ.ರೂ.ವೆಚ್ಚದ ಕೆಎಸ್ಆರ್ಟಿಸಿ ತಂಗುದಾಣ;ನವ ಬೆಳ್ತಂಗಡಿ ಕಲ್ಪನೆಗೆ ಸಾರಿಗೆ ಸುವ್ಯವಸ್ಥೆ

No safety measures at Kalladka during construction of four-lane flyover on Mangaluru-Bengaluru NH 75

Unscientific road expansion work on Mangaluru NH 75

KCCI seeks Heggade’s intervention for early completion of national highway widening projects

Bengaluru-Mangaluru NH 75 continues to remain in pathetic condition
between Sakaleshpur and B.C. Road


KKR, NIIF, Cube, Sekura eye road assets in South

Worst condition of Bengaluru-Mangaluru NH 75 deals blow to KSRTC, other fleet operators

MLA asks officials to get work on Jeppinamogaru, Morgans Gate Road completed at the earliest

KSRTC Volvo buses to Mangaluru International Airport gets grim response

halapady - Kasaragod NH 66 Sixlaning

Mangaluru City police adopts technology to book traffic violation cases
Enforcement of traffic laws with the use of technology by Mangaluru City Police

ಶಿರಾಡಿ ಘಾಟಿ ಸುರಂಗ ಮಾರ್ಗ ಕಾರ್ಯಸಾಧುವಲ್ಲ ಕೇಂದ್ರ
Shiradi Ghat's proposed tunnel route not feasible - Union minister Gadkari
NHAI to widen Shiradi Ghat to four-lane after tunnel bypass project found not viable, says Nitin Gadkari

ಶಿರಾಡಿ ಘಾಟ್ ದುರಸ್ಥಿಗೆ ವಾರದೊಳಗೆ ವಿಶೇಷ ಸಭೆ: ಸಿಎಂ ಬಸವರಾಜ ಬೊಮ್ಮಾಯಿ

KSRTC mulls over operating JnNURM buses to Mangaluru railway station

‘Keep Bus Shelters/Stands Clean’ Cleanliness campaign to be launched today

NHAI issues tender for NH 75 Maranahalli to Addahole - Value of work is worth Rs 1,976 cr

NHAI delaying decision on land acquisition rate – Karkala-Mangaluru four-lane work in jeopardy

Road Under Bridge (RuB) Work Traffic to Mangaluru from NH-66 via Mahakalipadpu Diverted

High-tech bus shelter inaugurated in Surathkal

NHAI invites bids for four-laning of Shirdi Ghat section on Mangaluru-Bengaluru NH
Quote:
Union minister of road transport and highways Nitin Gadkari nformed Dakshina Kannada MP Nalin Kumar Kateel that the NHAI is simultaneously taking up the finalisation 0f DPR works for the project of Shiradi Ghat tunnel, which will decrease the logistic cost for the traffic between Mangaluru and Bengaluru.
WE R CYCLING to organize ‘Mangalore Cyclothon ’23’ to bring Awareness to Cycling & Road Safety

Shiradi Ghat tunnel is now being finalised by the NHAI

ಶಿರಾಡಿಗೆ ಸುರಂಗ ಮಾರ್ಗ ಅಪಾಯಕ್ಕೆ ಆಹ್ವಾನ

ಬೀದಿಯಲ್ಲಿ ನಾಯಿ, ಬೆಕ್ಕು ಬಿಟ್ಟವರ ಹೆಂಡತಿ ಮಕ್ಕಳನ್ನ ನಾವು ಸಾಕ್ತೇವೆ! ಮಂಗಳೂರಿನಲ್ಲಿ ಎಚ್ಚರಿಕೆಯ ಬ್ಯಾನರ್

Smart City doesn't have any plan to protect children from street dogs!

68,000 ‘expired’ vehicles plying in coastal districts

PMI Electro becomes first OEM in India to record 1,000 e-bus delivery milestone

Who is running e-bus in Mangaluru?

Despite multiple tenders, bidders nix high-cost Pumpwell bus stand project

If KSRTC can develop Bendorewell building (Cognizant) why can't they develop this in partnership with MSCL? Anyway KSRTC is also going to use this terminal.

109-Year-Old Govt School to be Demolished for NH 169 Mangalore-Moodbidri Road Widening

ಪುಂಜಾಲಕಟ್ಟೆ-ಚಾರ್ಮಾಡಿ ರಸ್ತೆ ಅಗಲೀಕರಣಕ್ಕೆ ಮರಗಳ ಮರು ಸಮೀಕ್ಷೆ ಧರೆಗುರುಳಬೇಕಿದೆ ಕಾಡಿನ 5,494 ವೃಕ್ಷಗಳು

Beltangady: Mangaluru-Viluppuram national highway widening – 5,494 trees to be cut

Bridge between Ullal and M’luru may become reality

KSRTC’s European-style sleeper buses to begin operations from Friday

ಮಂಗಳೂರು ಶೀಘ್ರದಲ್ಲೇ ಪಣಜಿಗೆ ರಾಜಹಂಸ ಬಸ್ ಸಂಚಾರ ಆರಂಭ

ಮಂಗಳೂರಲ್ಲಿ ಹೆಚ್ಚುತ್ತಿದೆ ಬೀದಿ ವ್ಯಾಪಾರಿಗಳ ಸಂಖ್ಯೆ; ಪಾದಚಾರಿಗಳಿಗೆ ಸಂಕಟ

People doubt completion of 4-lane work of NH 75 between B.C. Road and Addahole by November

Hampankatta Jn to see better traffic mgmt
Motorists Confused! Traffic Movement Changed to Earlier System near Hampankatta Junction

E-autos function legally, say drivers

ಸಮುದ್ರ-ನದಿ ಸಂಪರ್ಕ ಸೇತುವೆ ನಿರ್ಮಾಣಕ್ಕೆ ಶಂಕುಸ್ಥಾಪನೆ

NH-169 Land losers to intensify protests if demands not met by March 20

Mangaluru to get 15 adaptive traffic control junctions

How does these things ensure pedestrians safety? Hampankatta junction, after recent change (restoring back to old system), has again become unsafe to pedestrians due to unhindered speedy movements of vehicles.

Bus users inconvenience has increased due to elimination of busstops near Hampankatta junction. Earlier stoppages of buses were slowing down speed of vehicles and making the juntion more safe for pedestrians.

CPM protests delay in Kulur bridge works

Kudla will get 12 smart parking locations soon

Change in Traffic Movement at Kankanady Circle effective 13 March


ಮಂಗಳೂರು: 25 ವರ್ಷಗಳಾದ್ರೂ ಕಾಣದ ರಸ್ತೆ ಅಭಿವೃದ್ಧಿ, ಸ್ವ ಕ್ಷೇತ್ರದಲ್ಲೇ ಸಚಿವ ಅಂಗಾರ ವಿರುದ್ಧ ತಿರುಗಿಬಿದ್ದ ಜನರು

EVeium opens dealership showroom in Mangaluru 2

Nanthoor overpass – NHAI needs to start work immediately

ಮಂಗಳೂರು ಉತ್ತರ ಸಂಚಾರಿ ಠಾಣೆಯ ನೂತನ ಕಟ್ಟಡವನ್ನು ಉದ್ಘಾಟಿಸಿದ ಶಾಸಕ ಡಾ. ವೈ ಭರತ್ ಶೆಟ್ಟಿ

Four-lane road between B.C. Road and Adda Hole expected to be ready in another two months, says NHAI official
Quote:
Of the 63-km four-lane project which is underway, between B.C. Road and Addahole on Mangaluru-Bengaluru National Highway 75, about 20 km of four lane is expected to be ready in another two months, an official of the National Highways Authority of India (NHAI) told a meeting here on Tuesday.
Bids received for building a flyover at Nanthoor will be opened next week, says Kateel

New Traffic System Implemented Near Kankanady Circle is like Obstacle Course for Motorists

I have to check this from pedestrian point of view. But obvious that police department never care for pedestrians safety & convenience.

ಮಂಗಳೂರು ಕೊಟ್ಟಾರ ಕಲ್ಬಾವಿ ರಸ್ತೆಯ ಅಗಲೀಕರಣ ಹಾಗೂ ಕಾಂಕ್ರಿಟೀಕರಣ ಕಾಮಗಾರಿ ಪೂರ್ಣ ಉದ್ಘಾಟನೆ

Kulur flyover project work limping on lines of incomplete Pumpwell one
Quote:
According to the agreement, the work should have been completed by October 2022. The work of putting pile in the river is over. However, super structure, including girders remains pending. As per the manager of the company only 40% of the work has been completed. He is saying that the girder of 0.776 km length is being done at Pune and it will be fixed once completed.
Is this monlithic girder of 0.776 km? If so how are they going to transport it through ghat section?

Street food festival brings city traffic issues to the fore

Only 30% of work on widening NH 75 between B.C. Road and Periyashanthi is completed after 500 days

Maravoor Old Bridge on Mangaluru Airport Road to be completely overhauled

M’luru May Have To Wait Longer For Ksrtc’s E-buses

Union Minister Nitin Gadkari Speaks About 'Green Highway' At Republic Summit 2023

Kurnool to Mangalore?

Director (Marketing), HPCL inaugurates CNG facility in Mangalore

Old Maravoor bridge in Mangaluru to open in a month

Vehicular overpass worth Rs 40 crore to come up near KPT

Goods truck terminal project for city fails to take off

NHAI commences road improvement work at NITK-Surathkal toll plaza of NH 66

ಮಂಗಳೂರಿನಲ್ಲಿ ಇ-ರಿಕ್ಷಾ ನೋಂದಣಿಗೆ ಅಡ್ಡಿ: ಹೊಸ ಆಟೋ ಬುಕ್ ಮಾಡಿದವರು ಅತಂತ್ರ!

ಫುಟ್ಪಾತ್ ವ್ಯಾಪಾರ, ಪಾದಚಾರಿಗಳಿಗೆ ಸಂಚಕಾರ!

Bus terminal project at Pumpwell yet to take off

Cameras to record traffic violations to come up in city, says DCP (Crime and Traffic) B.P. Dinesh Kumar

Mangaluru-Karkala highway widening: Land losers threaten indefinite strike

First BPCL Petrol Pump in Mangaluru Introduces EV Charging Machine

Senior citizens point out problems in getting into city buses

Awareness raised over safety of passengers among bus drivers, conductors

3-km Padil-Pumpwell four-lane road work incomplete even after two years

Railway Ministry approves extension of Bengaluru-Mangaluru express train via Mysuru to Murdeshwar

Mangaluru constituency will become a role model in coming days: U T Khader
Quote:
“The government is planning to build a bridge from Sajipa to Thumbe. The proposal is under process and experts are studying the project. There is also a proposal to build a bridge from to Kotepura to Bolar. This will help reduce the traffic flow in the city,” he said.
Khader proposes bridge between Kotepura and Bolar

Bengaluru-Chennai Expressway to be operational in January 2024, will cut travel time to 2 hours, says Nitin Gadkari
Quote:
Besides this, the Centre has also proposed a Bengaluru–Mangalore Greenfield Expressway and Mangaluru–Chennai Expressway through Bengaluru.
Mangaluru ಪಡೀಲ್-ಪಂಪ್ವೆಲ್ ಕಾಂಕ್ರೀಟ್ ರಸ್ತೆಗೆ ಹಲವು ವಿಘ್ನ

Shiradi Ghat tunnel work to begin in 2024 – Nalin Kumar Kateel
Quote:
"... Now the design of the project is changed. The tunnel will be constructed at two places and flyovers at other areas. The union government has agreed to release Rs 2500 crore in the first phase. The work will begin in 2024.”
ಮಂಗಳೂರು ನಗರದ 8 ಕಡೆಗಳಲ್ಲಿ ಬಸ್ ಬೇ ನಿರ್ಮಾಣ: ಪ್ರತೀ ವಾರ ಮೇಯರ್ ಫೋನ್-ಇನ್ ಕಾರ್ಯಕ್ರಮಕ್ಕೆ ನಿರ್ಧಾರ

Environmental activists protest against tree felling for construction of flyovers
Amid protest by greens, NHAI temporarily stops cutting trees between KPT and Nanthoor junctions

MCC to Add Bus Bays in the City for Commuters Needs through Private Participation

ಮಂಗಳೂರು ಸ್ಮಾರ್ಟ್ ಸಿಟಿ ನಗರದಲ್ಲಿ ಏನಿದು ರಸ್ತೆ ದುರವಸ್ಥೆ..?

Charmadi Ghat 490 ಕೋಟಿ ರೂ. ವೆಚ್ಚದಲ್ಲಿ ಅಭಿವೃದ್ಧಿ ಗೆ ಸಮ್ಮತಿ

Stalled Work on New Kulur Bridge across NH 66 Expedited says MP Kateel
Work on New Bridge Across NH-66 at Kulur Finally Resumed

AML Private limited unveils service facility in Mangalore, Karnataka

MCC to Bear the Cost of Rs 1.39 Crore for Illumination Roads during Mangaluru Dasara

ಮಂಗಳೂರಿನಲ್ಲಿ ರಸ್ತೆಗಿಳಿಯಲಿವೆ ಎಲೆಕ್ಟ್ರಿಕ್ ಬಸ್ ಎಲ್ಲಿಗೆಲ್ಲ ಬಸ್ ಬರುತ್ತೆ ಗೊತ್ತಾ?

MLA asks MSCL to complete pending development works at service bus terminus

Go ahead with flyover work at Nantoor and KPT on available land: Kateel

Litigation and land issues delay flyovers, says NHAI
Quote:
A proposal for the construction of a six-lane flyover of 3km distance from Kuloor to Bykampady in the city has been approved by the Centre, the MP said. The Union ministry of road transport and highways has directed the NHAI to prepare a detailed project report for the flyover, he said.
Citizens vent anger over lack of footpath, civic issues
Complaints pour in to clear footpaths of vehicles and encroachment

Problem is corrupt police!

BUS ಕರಾವಳಿಯಲ್ಲೂ ರಸ್ತೆಗಿಳಿಯಲಿದೆ ಎಲೆಕ್ಟ್ರಿಕ್ ಬಸ್

Acquisition of land for NHAI service road by MCC opposed

Govt invites tenders to study feasibility of Mani-Mysuru four-lane road work

Widening of Padil-Pumpwell road stretch likely to be completed by March: Mangaluru Mayor

Ministers Dinesh Gundurao, Hebbalkar Discuss About Mangaluru-Bengaluru Green Field High Speed Corridor

Quote:
The head of the European Business and Technology Organization held a discussion with Dakshina Kannada District In-charge Minister Dinesh Gundurao on Thursday regarding construction of Bengaluru-Mangaluru Integrated Green Field High Speed Corridor. Udupi District in-charge Minister Lakshmi Hebbalkar participated in the meeting.
Karnataka govt holds discussions on high-speed corridor between Bengaluru and Mangaluru
Quote:
Interacted with the delegation of the European Business & Technology Center (EBTC). We discussed working together by pooling our resources and expertise to create sustainable and quality infrastructure for the future, including building High-Speed Economic Corridors. My cabinet colleague @laxmi_hebbalkar was present during the interaction.
Why are they calling it Integrated Corridor without integrating railways?

High-speed rail corridor in the works from Bengaluru to Mangaluru

Mangaluru police to launch ‘footpath for pedestrians’ drive to ensure pedestrian safety soon: Anupam Agrawal

Some areas in city to be soon declared horn-free zones: Police Commissioner at Phone-in programme

NH 169 land losers give ultimatum to NHAI

NH-169 land losers give ultimatum to NHAI

ಚತುಷ್ಪಥದಿಂದ ಪದವು ಗ್ರಾಮ ಕೊಕ್?ರಾ. ಹೆ. ಪ್ರಾಧಿಕಾರ ಚಿಂತನೆ

Mangaluru gets six ‘no horn zones’

KSRTC’s wait for more bus permits continues in DK

NHAI set to upgrade Manglauru-BC Road stretch into a six-lane road | coastaldigest.com - The Trusted News Portal of India

Remaining portion of GHS Road between P.M. Rao Road and Sharavu Temple Road to be widened and concreted

Elevated highway sought instead of underpass for NH 66 between Nanthoor and KPT

Thoroughfares hit due to concrete cutting

ರಾಷ್ಟ್ರೀಯ ಹೆದ್ದಾರಿ ಕಾಮಗಾರಿ ತ್ವರಿತ ಡಿಸಿ ಸೂಚನೆ

Jappinamogaru to Morgan Gate Riverside ‘New road to be ready by March’ 2
Railways to consult NITK-Surathkal about reusability of collapsed concrete box for twin under-bridge in Mangaluru

Highways around Dharmasthala to be upgraded at a cost of ₹958 crore: Kateel
2 NH projects get Centre’s approval: MP
Quote:
The 28.4km road will be developed at an estimated cost of Rs 613 crore. Further, an 11.2km stretch of NH-73 on Charmadi Ghat will be developed at an estimated cost of Rs 343 crore.
Zebra crossings to be created at 48 locations in city

MCC mulls acquiring land to develop road to district court

Tollgates on NH-66 in Dakshina Kannada and Udupi turn accident-prone zones

LED streetlights project: MSCL to give contractor one more extension

Residents demand proper bus stand facilities at Bondel Junction

Karkala-Mala stretch of NH 169 being widened exactly as per Indian Road Congress specifications

MSCL to widen 7 roads going to Waterfront project area

City to get longest NH flyover from Kuloor to Baikampady

MRPL sponsors purified drinking water dispensers and passenger seating arrangements at KSRTC Bejai terminal

Mangaluru City Corporation will identify vending zones in each ward for street vendors, says Mayor

NHAI begins dismantling toll booth structure at the NITK-Surathkal plaza

ನೆನೆಗುದಿಗೆ ಬಿದ್ದ ಮಲ್ಟಿ ಲೆವೆಲ್ ಪಾರ್ಕಿಂಗ್ ಸಂಕೀರ್ಣ: ಮೂರ್ನಾಲ್ಕು ವರ್ಷವಾದರೂ ಮುಗಿಯದ ಕಾಮಗಾರಿ

ಚಾರ್ಮಾಡಿ ಘಾಟಿಯಲ್ಲಿ ನನೆಗುದಿಗೆ ಬಿದ್ದಿದ್ದ ತಡೆಗೋಡೆ ಕಾಮಗಾರಿ ಮತ್ತೆ ಆರಂಭ

Chelyadka bridge to be replaced with new one

Mangaluru Central Station ನೂತನ ಮೇಲ್ಸೇತುವೆ ಕಾರ್ಯ ಪೂರ್ಣ

One more FoB to be extended to new platforms in Mangaluru, full-scale passenger shelter to come up before monsoon

Gadkari clears Rs 344 cr project for expanding Mangaluru-Tumkur highway

Greens translocate 90 trees on Karkala-Mala NH stretch

Mangaluru NHAI finally clears remnants of Surathkal toll gate

₹343 crore for Charmadi Ghat development, says Kateel

Pumpwell Circle-Padil Road Stretch a Rs 24 Crore 4-Lane Project to be Done by March 2024

DC inspects BC Road- Addahole road widening works, hears public woes

Mangaluru KSRTC to get electric bus: Centre plans to replace old buses with smoke-emitting old buses to introduce

MESCOM has set up 61 EV charging stations

Mani flyover on Mangaluru-Bengaluru highway will be ready by April-end, says NHAI official
Quote:
At the District Development Coordination and Monitoring Committee (DISHA) meeting on February 14, he informed that the entire project will be over by February 2025
Charmadi two-lane road: Tender to be floated soon
Quote:
The 10.2 km stretch of Charmadi Ghat road will be developed at a cost of Rs 313 crore.
Ujire-Dharmasthala-Periyashanthi road will be developed under HAM, says official

CM Siddaramaiah proposes dedicated economic corridor between Bengaluru and Mangaluru in Karnataka budget
Quote:
The Mangaluru corridor would ensure speedy access to the port and significantly reduce the freight transport time to Europe and the Middle East. The Chief Minister, however, has not made any budgetary provision for the proposal.
Mangaluru: ಹಾರ್ನ್ ಝೋನ್’ಗಳಾಗಿ ಮಾರ್ಪಟ್ಟಿವೆ ನಗರದ ಪ್ರಮುಖ ಜಂಕ್ಷನ್ಗಳು!

DKBOA Introduces New Card To Help Students And Other Travelers

DK district to get 85 electric buses soon

All buses must have doors, DC's directive to bus operators

Government Plans Six-Lane Highway to Ease Traffic in Mangaluru City
Quote:
Mangaluru: In a bid to alleviate traffic congestion in Mangaluru City and its outskirts, the government has come up with an ambitious plan to transform the existing four-lane highway from BC Road to Mukka into a six-lane road.
Quote:
Nalin said that the design for the project is already in place, emphasizing that the implementation will occur in phased stages rather than all at once.

"The Detailed Project Report (DPR) for the elevated highway segment from Kuloor Bridge to Baikampady is being prepared. The New Mangalore Port Authority, in collaboration with the NHAI, will spearhead this initiative. The elevated highway will be above the existing four lane stretch," stated Nalin Kumar Kateel.

Elaborating further on the approach, Nalin explained, "The development work for the remaining stretches will be undertaken in stages. In areas where land is available, the existing four-lane road will be widened to accommodate six lanes. In cases where land is scarce, elevated roads will be constructed. The National Highways Authority of India (NHAI) is designated to handle these works," he said.
Quote:
Simultaneously, plans for the Mangaluru Bypass Road, which spans from Mulki-Kateel-Bajpe-Polali-BC Road-Thokkottu, are currently in the Detailed Project Report (DPR) stage. The estimated cost for this extensive 91.20 km project is Rs 3,931.04 crore.
DPR of elevated six-lane highway project proposed between Panambur and Baikampady is under way, says Nalin Kumar Kateel
Quote:
Referring to other proposed projects, the booklet mentioned that a ₹2,538 crore project of building a tunnel and viaduct road at Shiradi Ghat stretch on national highway 75 (Mangaluru-Bengaluru) is on the cards. It said that the Mangaluru Bypass Road project connecting Mulky with Thokkottu via Kinnigoli, Kateel, Bajpe, Polali, Addor, B.C. Road and Panemangalore has been proposed at a cost of ₹3,931.04 crore.
Going the Bengaluru way

Permanent Restoration Commences For Kempuhole River Embankment

ಮಂಗಳೂರು ಉತ್ತರ ಕ್ಷೇತ್ರದಲ್ಲಿ 60 ಲಕ್ಷ ರೂ ವೆಚ್ಚದ ಅಭಿವೃದ್ಧಿ ಕಾಮಗಾರಿ ಡಾ. ಭರತ್ ಶೆಟ್ಟಿ ಶಿಲನ್ಯಾಸ..!

NGT dismisses petition questioning felling of trees between Marnamikatta and Nandigudda in Mangaluru
NGT restrains MSCL from felling trees in city for project
Reply With Quote
     
     
  #638  
Old Posted Mar 26, 2024, 4:05 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,124
Land Transportation - Rail

Preliminary work on new platforms begins at Mangaluru Central Railway Station
Quote:
After the operationalisation of the new pit line, the preliminary work has begun for the new platforms, Platform No 4 and 5, at Mangaluru Central Railway station.

The new island type platform with a length of 540-metre can hold 24 Linke Hofmann Busch (LHB) coaches or 26 ICF make coaches.
With first MEMU on the way, KRCL may resume Goa-Mangaluru train service

ಸುರತ್ಕಲ್ ರೈಲು ನಿಲ್ದಾಣ ಪಿಆರ್ಎಸ್ ಭಾಗ್ಯ, ಇನ್ನು ಮುಂಬಯಿ ಪಯಣ ಸರಳ

Southern Railway developing new goods shed at Ullal
Quote:
Southern Railway is developing a new goods shed at Ullal, in lieu of the goods shed in Bunder to have full rake handling capacity of trains in Mangaluru area, according to Trilok Kothari, Palakkad Divisional Railway Manager
Could SilverLine be extended to Mangaluru?
Proposal to extend SilverLine to Mangaluru
Kerala wants SilverLine extended up to Mangaluru, eyes faster approval

Extend upto Mumbai itself and then Mumbai-Delhi high-speed railway.

Mangaluru Central gets new pit line

Mangaluru Central gets new pit line

ಕಾಣಿಯೂರು-ಕಾಞಂಗಾಡ್ ರೈಲ್ವೇ ಮಾರ್ಗಕ್ಕೆ ಶಾಶ್ವತ ಹಿನ್ನಡೆ

Trains to ply at 130 km/h in Kerala within next 2 years, says Railway - including Shoranur-Mangalore

Railways introduces QR code-based unreserved ticket booking system in Mangaluru

Coastal entrepreneurs demand superfast train to Bengaluru from Mangaluru

ಮಂಗಳೂರು ಸೆಂಟ್ರಲ್ 2 ಪ್ರತ್ಯೇಕ ಪ್ಲಾಟ್ಫಾರ್ಮ್ ಕಾಮಗಾರಿ ಬಿರುಸು
Additional platforms at Mangaluru Central to be ready by February-end next

GM reviews speed enhancement proposal on Mangaluru-TVM section

Dedicate two new platforms at Mangaluru Central exclusively for trains towards Bengaluru and Mumbai, Southern Railway urged
Work on Island platforms in central train station to be over by Feb 2023

Extend Varanasi-Mysuru Bi-Weekly Express train upto Mangaluru

Work of island platforms at Mangaluru Central railway station to be completed in Feb 2023

Work on construction of twin RuBs under two railway lines begins

Konkan Railway to connect MRPL from Thokur at the cost of Rs.46 crore

Mangaluru Junction Vijayapura Express Daily Train Service Extended Till March

ಮಂಗಳೂರು -ಸುಬ್ರಹ್ಮಣ್ಯ ರೈಲ್ವೇ ಹಳಿ ವಿದ್ಯುದ್ದೀಕರಣ… ನೈಋತ್ಯ ರೈಲ್ವೇ ವಲಯದ ಬಹು ನಿರೀಕ್ಷಿತ ಯೋಜನೆ

Trains can run up to 130 kmph on Mangaluru-Shoranur section by March 2025

New platforms at Mangaluru Central get ₹4.76 crore allocation; work to be completed by March

Padil-Hassan train route electrification – Rs 134 crore grant reserved in union budget

The study of the Thiruvananthapuram-Mangalore rail line will be completed by September

ಜೋಕಟ್ಟೆ-ಪಡೀಲ್ ಸುರಂಗದಲ್ಲಿ ಕಾಮಗಾರಿ: ಮಂಗಳೂರು ಮಾರ್ಗದ ಹಲವು ರೈಲು ಸೇವೆ ತಾತ್ಕಾಲಿಕ ರದ್ದು

Mangalore Central and Mangalore Junction rail stations to be upgraded under Amrit Bharat Scheme
ಮಂಗಳೂರು ಸೆಂಟ್ರಲ್, ಜಂಕ್ಷನ್ ನಿಲ್ದಾಣಕ್ಕೆ “ಅಮೃತ ಭಾಗ್ಯ”!

Complete Track Renewal after five decades inside Kulashekara old tunnel to improve train operations in Mangaluru region

ಮಂಗಳೂರು-ಸುಬ್ರಹ್ಮಣ್ಯ ನಿತ್ಯ ಪ್ಯಾಸೆಂಜರ್ ರೈಲು ಬೇಡಿಕೆ

Kateel demands doubling of Mangaluru Central-Mangaluru Junction line to speed up trains towards Konkan and Bengaluru sectors

Develop Kollur railway station under Amrit Bharat Station scheme: Shivamogga MP

MP urges Railway Minister to fund KRCL stations’ development

Rlys To Monitor Forest Fires In Ghats

MP urges South Western Railway to develop stations between Padil and Subrahmanya Road

DK MP Urges SWR to Develop Stations Between Padil and Subrahmanya Road

ಸಿಹಿಸುದ್ದಿ; ಶೀಘ್ರವೇ ಮಂಗಳೂರಿಗೆ ವಂದೇ ಭಾರತ್ ಎಕ್ಸ್ಪ್ರೆಸ್ ರೈಲು

Upgrade Padubidri Railway Station to handle Express trains, residents urge KRCL

ಕೊಂಕಣ ರೈಲ್ವೇ ಶೇ. 95 ವಿದ್ಯುಚ್ಛಾಲಿತ ರೈಲು ಓಡಾಟ


ಅಮೃತ ಭಾರತ ಯೋಜನೆ ಮಂಗಳೂರು ಜಂಕ್ಷನ್ ರೈಲ್ವೇ ನಿಲ್ದಾಣಕ್ಕೆ ಹೊಸ ರೂಪ
New look to Mangaluru junction railway station under Amrit Bharat scheme proposed

Where is the busstop in the above drawing? Is it far off or integrated to railwaystation building for easy movement of pedestrians? As such in the drawing pedestrian bridge is not connected to busstop. Horrible!

ಕರಾವಳಿ ಭಾಗದ ಜನರ ಬಹುದಿನದ ಬೇಡಿಕೆ ಈಡೇರಿಸಿದ ಭಾರತೀಯ ರೈಲ್ವೆ

Work on two additional platforms at Mangaluru Central been stalled for 5 months

Delay in Construction of New Platforms at Mangaluru Central Railway Station Causes Frustration Among Residents

ಮಂಗಳೂರಿನಿಂದ ದೇಶದ ಪ್ರಮುಖ ನಗರಕ್ಕೆ ರೈಲು ಸೇವೆ ಆರಂಭ

Trains can now run on electric traction from Mangaluru to Puttur

ಮಂಗಳೂರು ಪುತ್ತೂರು ರೈಲು ಮಾರ್ಗ ವಿದ್ಯುದೀಕರಣ ಪೂರ್ಣ; ಪ್ರಾಯೋಗಿಕ ಸಂಚಾರ ಯಶಸ್ವಿ

No Plans to Merge Mangaluru Region with SWR, Says Railway Minister

PM Modi to lay foundation stone of international-level railway station in Mangaluru

PM Modi lays foundation stone for redevelopment of 508 railway stations including Mangaluru

Mangaluru is at mercy of 3 railway divisions, which hampers operations and growth, MP tells Rail Minister

Redevelopment work of Bantwal and Subrahmanya Road Stations to start soon: Kateel

ಬೆಂಗಳೂರು-ಮಂಗಳೂರು ನಡುವೆ ವಂದೇ ಭಾರತ್ ರೈಲು: ನಳಿನ್ ಕುಮಾರ್ ಕಟೀಲ್

More trains to Karnataka cities demanded after extra platforms at Mangaluru Central

Five years on, parallel RoB between Udupi and Manipal on NH 169A at Indrali remains a non-starter

Two additional platforms at Mangaluru Central almost complete, work on integrating signalling and telecommunication network starts on September 4

Railways cancels preliminary platform-related work in Mangaluru, trains to run as per normal schedule

ಸ್ಮಾರ್ಟ್ ಆಗಲಿದೆ ಮಂಗಳೂರು ಸೆಂಟ್ರಲ್ ರೈಲ್ವೆ ನಿಲ್ದಾಣ; ಎರಡು ಪ್ಲಾಟ್ ಫಾರ್ಮ್ ಕಾಮಗಾರಿ ಅಂತಿಮ ಹಂತದಲ್ಲಿ
ಮಂಗಳೂರು ಸೆಂಟ್ರಲ್ ನಿಲ್ದಾಣದಲ್ಲಿ 2 ಹೊಸ ಪ್ಲಾಟ್ಫಾರ್ಮ್ ಕಾರ್ಯಾರಂಭ: ಕರ್ನಾಟಕದ ಈ ನಗರಗಳಿಗೆ ಹೆಚ್ಚುವರಿ ರೈಲು

Work on widening approach road to Mangaluru Junction begins
Road Widening on upgrading Mangaluru Junction under the Amrit Bharat Station Scheme

Vande Bharat; ರೈಲು ನಿರ್ವಹಣೆಗೆ ಮಂಗಳೂರು ನಿಲ್ದಾಣಕ್ಕೆ ಹೊಸ ಸೌಲಭ್ಯ

ವಿಜಯಪುರ-ಮಂಗಳೂರು ರೈಲು ಕಾಯಂಗೊಳಿಸಲು ಕೂಗು

Bengaluru-Mangaluru Express via Mysuru to run till Murdeshwar from September 17

ವಿಜಯಪುರ- ಮಂಗಳೂರು ರೈಲು ಕಾಯಂಗೊಳಿಸಲು ಸಂಸದರ ಪತ್ರ

‘Coastal Karnataka will get a Vande Bharat Express service by October’ (Mangaluru and Madgaon, Goa)
Nalin Kateel urges rail minister to introduce Vande Bharath train from Mangaluru to Goa

Kateel makes a strong pitch with Railway Minister for merger Mangaluru Railway Region with SWR

Vande Bharat Express service to connect Mangaluru and Goa Nalin

ಮಂಗಳೂರು-ಮುಂಬೈ ನಡುವೆ ವಂದೇ ಭಾರತ್ ಎಕ್ಸ್ಪ್ರೆಸ್?

ವಿಜಯಪುರ-ಮಂಗಳೂರು ರೈಲು; ನೈಋತ್ಯ ರೈಲ್ವೆ ಮುಂದೆ ಹೊಸ ಬೇಡಿಕೆ

Mangaluru Smart City Limited drops plan to close Railway Station Road

ಮಂಗಳೂರಿಗೆ ವಂದೇ ಭಾರತ್ ರೈಲು, ಸಂಸದರ ಟ್ವೀಟ್
Quote:
ಸಂಸದರ ಟ್ವೀಟ್; ನಳಿನ್ ಕುಮಾರ್ ಕಟೀಲ್ ತಮ್ಮ ಟ್ವೀಟ್ನಲ್ಲಿ, 'ಮಂಗಳೂರು-ಮಡಗಾಂ ವಂದೇ ಭಾರತ್ ರೈಲು ಓಡಾಟಕ್ಕೆ ಸರ್ವಸನ್ನದ್ಧವಾಗಿದ್ದು, ವೇಳಾಪಟ್ಟಿ ಯಾವುದೇ ಕ್ಷಣದಲ್ಲಿಯೂ ಬಿಡುಗಡೆಯಾಗಲಿದೆ' ಎಂದು ಹೇಳಿದ್ದಾರೆ.

'ಇನ್ನು ಮಂಗಳೂರು-ಬೆಂಗಳೂರು ವಂದೇ ಭಾರತ್ ರೈಲಿಗಾಗಿ ಮಾಡಿದ ಮನವಿ ಫಲಪ್ರದವಾಗಿದ್ದು, ಶೀಘ್ರದಲ್ಲಿ ಅದು ಕೂಡ ಈಡೇರಲಿದೆ. ಈ ಸಿಹಿಸುದ್ದಿಗಾಗಿ ಜಿಲ್ಲೆಯ ನಾಗರಿಕರ ಪರವಾಗಿ ಕೇಂದ್ರ ಸರಕಾರಕ್ಕೆ ಧನ್ಯವಾದಗಳು' ಎಂದು ಕಟೀಲ್ ಟ್ವೀಟ್ ಮಾಡಿದ್ದಾರೆ.
Please ru this train up to Goa as Vande Bharat and then extend further to Mumbai as ordinary express train.

High-speed rail corridor in the works from Bengaluru to Mangaluru
Quote:
The Karnataka government is in initial talks for a high-speed rail connecting Bengaluru and Mangaluru.

Minister Dinesh Gundu reveals plans for an integrated greenfield high-speed corridor, aiming to boost development in Mangaluru and nearby cities.
Quick watering facility for train coaches commissioned at Mangaluru Junction Railway Station
Quick Watering System set up at M’luru Junction station

Ullal goods shed opened to handle all kinds of goods traffic except coal, petroleum products, and coke

Additional platforms at Mangaluru Central likely to be commissioned soon

Amritha Fortune for Mngaluru Junction, Bantwal & Subramanya Railway Stations

Feasibility study on speed enhancement to 130/ 160 kmph on entire Mangaluru-TVM section nearing completion

Despite work on twin railway underbridge work at Mahakalipadpu limping, authorities claim Morgan’s Gate-Jeppinamogaru four-lane road will be ready by March

Mangaluru Central 4, 5ನೇ ಪ್ಲಾಟ್ಫಾರಂ ಕಾಮಗಾರಿ ಪೂರ್ಣ

Design and plan for Mangaluru Central Station and Railway Colony redevelopment in final stages
Quote:
Broad plans

Ahead of finalising the design and plan, the Railways has broadly conceptualised how the stations would look once they are redeveloped, Mr. Chaturvedi said. The Central would resemble a city commercial centre with space for a host of commercial activities, including shopping, cinema, restaurant etc. Ample parking space with multi-level car parking facility too would be developed for passengers as well as visitors.

While the platforms would continue to remain on the ground floor, the concourse (circulating area) would be shifted to the first floor with large waiting halls and other passenger amenities after razing the existing station building. There would be foot overbridges 48 metres long and 12 metres wide connecting all the five platforms of the station.

Offices at the station premises would be shifted to multi-storey buildings to be constructed to save space. Similarly, the Railway Colony abutting the Central Station, too, would be redesigned and redeveloped. The vast extent of land where individual housing units were located at present would be optimally utilised. Multi-storey apartments would replace the individual houses so as to open up more space.
Space utilisation

The historical concept of railway stations just facilitating people’s movement has changed with increase in urban population while cities have recognised the potential of underutilised spaces around stations to become multifunctional urban hubs. As such, RLDA was implementing modular construction for selected stations, the Authority said
Nonsense if without integrated bus terminal!

Karkala ಮನಸ್ಸಿದ್ದರೆ ನಂದಿಕೂರು-ಮೂಡಿಗೆರೆ ರೈಲು ಮಾರ್ಗ!

ಬೆಂಗಳೂರು - ಮಂಗಳೂರು ಸೇರಿದಂತೆ ರಾಜ್ಯದ ಇನ್ನಷ್ಟು ಮಾರ್ಗದಲ್ಲಿ ವಂದೇ ಭಾರತ್ ರೈಲು - ಕೇಂದ್ರ ರೈಲ್ವೆ ಸಚಿವ
Quote:
‘... ಸದ್ಯ ವಿದ್ಯುದೀಕರಣ ಕೆಲಸ ನಡೆಯುತ್ತಿದೆ. ಇದು ಪೂರ್ಣಗೊಳ್ಳಲು 7-8 ತಿಂಗಳು ಬೇಕಾಗುತ್ತದೆ. ಆನಂತರವಷ್ಟೇ ವಂದೇ ಭಾರತ್ ರೈಲು ಸಂಚಾರ ಆರಂಭಿಸಲು ಸಾಧ್ಯ’ ಎಂದು ತಿಳಿಸಿದರು.
Development works under Amrit Bharat Station Scheme start at Subrahmanya Road station

Railway meet addresses infrastructure concerns in Mangaluru

‘Rly electrification completion likely by June 24’

Coastal Karnataka’s First Vande Bharat Train Likely To Start This Month-End Between Mangaluru Central And Madgaon

Mangaluru Junction to sport new look by February-end

Authorities targets June 2024 for Hassan-Mangaluru rail electrification

Mangaluru Railway Station: ₹10.58 ಕೋಟಿ ವೆಚ್ಚದಲ್ಲಿ ಮಂಗಳೂರು ಜಂಕ್ಷನ್ಗೆ ಹೊಸ ರೂಪ, ಏನೆಲ್ಲ ಸೌಲಭ್ಯಗಳಿರಲಿವೆ ಗೊತ್ತಾ?
Quote:
ಪುನರಾಭಿವೃದ್ಧಿ ಕಾರ್ಯದ ಸಮಯದಲ್ಲಿ, ಪಡೀಲ್-ಬಜಾಲ್ ರಸ್ತೆಯಿಂದ ನಿಲ್ದಾಣಕ್ಕೆ ಸರಿಯಾದ ಸಂಪರ್ಕ ರಸ್ತೆಯ ಬಾಕಿ ಉಳಿದಿರುವ ಬೇಡಿಕೆಯನ್ನು ಈಡೇರಿಸಲಿದೆ. ಇದರ ಪರಿಣಾಮವಾಗಿ, 5 ಮೀಟರ್ ಅಗಲದ ಕಾಂಕ್ರೀಟ್ ರಸ್ತೆಯ 350 ಮೀ ವಿಸ್ತರಣೆಯನ್ನು ಕಾಂಕ್ರೀಟ್ ಸುಸಜ್ಜಿತ ರಸ್ತೆಯಾಗಿ 9 ಮೀಟರ್ಗೆ ವಿಸ್ತರಿಸಲಾಗುತ್ತಿದೆ. ವಿಸ್ತರಣೆಗೊಂಡ ರಸ್ತೆಯಿಂದ ನಿಲ್ದಾಣದ ಆವರಣದಲ್ಲಿ ಬಸ್ಗಳು ಸಹ ಸುಲಭವಾಗಿ ಸಂಚಾರ ಮಾಡಬಹುದು ಎಂದು ತಿಳಿಸಿದೆ.
RTI reply on line doubling between Mangaluru Central and Mangaluru Junction Stations amuses patrons

Fourth, fifth platform at Mangaluru Central railway station ready for use

Palakkad division gears up to unveil Mangaluru-Madgaon Vande Bharat Express
Mangaluru-Madgaon Vande Bharat Express trial run flagged off
Mangaluru-Madgaon Vande Bharat to be launched from Ayodhya, to boost K'taka coastal connectivity

Let us hope that Goa will ask this train to be extended Northwards.

ಸೆಂಟ್ರಲ್ಗೆ ರೈಲುಗಳ ವಿಸ್ತರಣೆ ಇಲ್ಲ | ದಕ್ಷಿಣ ರೈಲ್ವೇ ಉತ್ತರ
MP Nalin's appeal to extend crucial trains to Mangaluru Central railway station faces rejection
ರೈಲ್ವೆ ಇಲಾಖೆಯಿಂದ ಮಂಗಳೂರಿಗೆ ಮಲತಾಯಿ ಧೋರಣೆ; ಸಂಸದ ನಳಿನ್ ಕುಮಾರ್ ಕಟೀಲ್ ನೀಡಿದ್ದ ಎಲ್ಲ ಬೇಡಿಕೆಗಳ ತಿರಸ್ಕಾರ

Technical hurdle cleared for Mahakalipadpu twin railway under bridge project in Mangaluru

Revenue from yard exceeded ₹50cr in Dec

Railway Stations; ಪ್ಲಾಟ್ ಫಾರ್ಮ್ ಎತ್ತರಿಸುವ ಕಾಮಗಾರಿ ಆರಂಭ

From Delhi-Varanasi To Goa-Mangaluru, Here’s Vande Bharat Express With Most & Least Occupancy

Freight carrying capacity on Mangaluru-Shoranur section to be enhanced in six months

MP Raghavendra urges union railway minister to add extra coach to Bengaluru-Karwar express train

Union Budget allocates ₹55 crore for Mangaluru Railway Region of Southern Railway

After a month, Mangaluru-Madgaon Vande Bharat Express runs with less than 50% occupancy

ವಿಜಯಪುರ-ಮಂಗಳೂರು ರೈಲು ಮಂಗಳೂರು ಸೆಂಟ್ರಲ್ ತನಕ ವಿಸ್ತರಣೆ

Railways commences earth excavation for construction of twin RuBs at Mahakalipadpu in Mangaluru

Kateel urges extension of Mangaluru-Madgaon Vande Bharat Express to Mumbai
Thiruvananthapuram-Kasargod Vande Bharat Express line to run till Mangaluru

Girders for proposed steel bridge set to reach Udupi

Bantwal railway station to be redeveloped for ₹28.4cr

PM virtually lays foundation for redevelopment of 2 railway stations in Dakshina Kannada
Quote:
The Bantwal station will be redeveloped under the ABSS scheme at a cost of Rs 28.49 crore, while Subrahmanya Road will undergo redevelopment at a cost of Rs 26.16 crore.
KRCL merger with the Indian Railways sought

Historic Extension Of Vande Bharat Express To Mangaluru

Vande Bharat Express ಜೂನ್ನಲ್ಲಿ ಮಂಗಳೂರು-ಬೆಂಗಳೂರು ನಡುವೆ ವಂದೇ ಭಾರತ್

This train should start from Udupi!
Reply With Quote
     
     
  #639  
Old Posted Mar 26, 2024, 4:07 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,124
Water Transportation

Kulai Fishing Harbour Project witnesses 12.5 % progress in six months, fishermen for extending length of breakwaters for smooth entry, exit of boats
ಕುಳಾಯಿ ಜೆಟ್ಟಿ: ಬ್ರೇಕ್ ವಾಟರ್ ವಿಸ್ತರಣೆಗೆ ಬೇಡಿಕೆ

Lakshadweep: ಹೀಗೇ ಆದ್ರೆ ಮಂಗಳೂರಿನಿಂದ ಲಕ್ಷದ್ವೀಪಕ್ಕೆ ದೋಣಿ-ಹಡಗು ಸಂಚಾರವೇ ಬಂದ್ ಆಗಬಹುದು! | Lakshadweep To Mangaluru boats may be stop if silt of phalguni river increased

Rs 70 crore water cruise project from Netravati to Bolar Sea face – Meeting ends up in chaos

Roro service, water metro projects set to transform Mangaluru's transportation landscape
Quote:
Mangaluru, Feb 12: The tender process for a new Roll-on/Roll-off (RoRo) service, estimated to cost Rs 29.62 crore, facilitating people and vehicle transport from Old Port to the national highway, has been successfully completed.
Quote:
Water metro project approval

...

The project aims to establish a well-equipped water transport system from Bengre to Mangaluru and Ullal. Officials have been directed to expedite the preparation of Detailed Project Reports (DPR) for further consideration by the board. Discussions were also held regarding the anchoring of international ships, which is expected to boost commercial activities at the port.
Kateel asks DC to probe how Port Department rented out land after the expiry of lease period 2

Mangaluru Water Metro: Karnataka CM Siddaramaiah Announces Project On Gurupura, Netravati Rivers
CM Siddaramaiah proposes dedicated economic corridor between Bengaluru and Mangaluru in Karnataka budget
Quote:
Mr. Siddaramaiah announced commissioning of a feasibility study by Indian Institute of Technology, Madras, for developing an International Cruise and Tourism Port (ICTP) in Dakshina Kannada district. Karnataka Infrastructure Project Development Fund (KIPDF) was set up for preparation of feasibility reports under Infrastructure Development Department.
What is the type of International Cruise and Tourism Port (ICTP)? Is it just cruise ships? Or also marina?

Lakshadweep’s maritime potential waits to be tapped - India Shipping News

Water Crisis! MCC asked to Draw Water from Maravoor Dam in Case of Water Shortage

Bosch Commissions 4 MW Mangalore Port Trust Solar Project
Quote:
... The SECI has set a target of 11.19 MW of solar for NMPT.
Governor virtually inaugurates 2 projects of New Mangalore Port Authority
Quote:
State Governor Thawar Chand Gehlot virtually inaugurated the Swarna Jayanthi AOB Circle Road and Swarna Jayanthi Truck Parking Terminal project of the New Mangalore Port Authority on February 23, Friday.
NMPA set to handle a record 45 MT of cargo in this fiscal, says Governor
50 years of New Mangalore Port: Karnataka Governor inaugurates 2 projects
Quote:
He said “The Port has played a pivotal role in the transformative journey of major ports of the country in the past decade. With a capacity of 74 MTPA, the port achieved a record handling of 42.5 MMT in 2018-19."

"Despite challenges posed by the pandemic, the port has rebounded to pre-Covid levels, handling 41.3 MMT in 2022-23 and is on course to achieve an all-time high 45MMT in 2023-24,” he also said.
PM Modi Inaugurates Key Projects at New Mangalore Port Enhancing Infrastructure and Healthcare

Dedicated jetty to be built for Lakshadweep at Old Port in city
ಮಂಗಳೂರು: ಹಳೆ ಬಂದರಿನಲ್ಲಿ ಜೆಟ್ಟಿ, ಕ್ರೂಸ್ ಟರ್ಮಿನಲ್ ನಿರ್ಮಾಣ, ಲಕ್ಷದ್ವೀಪಕ್ಕೆ ತೆರಳುವ ಹಡಗುಗಳಿಗೆ ಅನುಕೂಲ


Tender: Construction of Multi-purpose Cargo Berth (Berth no 17) with allied civil works at New Mangalore Port

ಕರಾವಳಿಗೆ 3 ಬಹೂಪಯೋಗಿ ಬಂದರು ಮಂಗಳೂರು, ಮಲ್ಪೆ, ಬೈಂದೂರಿನಲ್ಲಿ ಅಭಿವೃದ್ಧಿ ಯೋಜನೆ

Aegis Vopak Terminals Ltd to acquire specialised storage terminals at Mangalore
Reply With Quote
     
     
  #640  
Old Posted Mar 26, 2024, 4:12 AM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,124
Air Transportation

Adani Group to invest Rs 23,200 cr to expand Ahmedabad, Mangaluru airports
Quote:
Mangaluru International Airport Ltd (MIAL), also a step-down subsidiary of Adani Airport Holdings, will raise the capacity of Mangaluru International Airport to handle 22.5 million passengers per annum and 0.12 million tonnes per annum of cargo, entailing an investment of Rs5,200 crore.
Quote:
The proposed expansion of Mangaluru airport includes two integrated terminal buildings - the existing developed terminal with future eastern expansion and a new terminal building with associated infrastructure, support facilities and utilities, to accommodate up to 22.5 MPPA with a built‐up area of about 1,83,221 square metres.
Quote:
For linking the new terminal building, the Airport Authority of India has asked the Karnataka Urban Infrastructure Development and Finance Corporation to construct a new approach road connecting the proposed new terminal building to the existing state highway SH-66A (Mangalore– Bajpe road).
M’luru-Delhi flight resumes from July 1

Mangaluru International Airport sees increase in passenger footfalls since four months

ಮಂಗಳೂರು ವಿಮಾನ ನಿಲ್ದಾಣ ಪ್ರಯಾಣಿಕರು, ವಿಮಾನ ಸಂಖ್ಯೆಯಲ್ಲಿ ಹೆಚ್ಚಳ

MIA bags Integrated Management Systems at one go

IndiGo launches Mangaluru-Mumbai flight

ಮಂಗಳೂರಿನಿಂದ ದಿಲ್ಲಿ, ಕೊಯಮತ್ತೂರು, ಬೆಳಗಾವಿಗೆ ವಿಮಾನ ಸೇವೆ, ಜುಲೈ 1 ರಿಂದ ಆರಂಭ

Bus service to MIA soon

MIA strives to enhance traveler experience with Pranaam

Mangaluru-Delhi direct flight begins operations 2

MIA procures two electric vehicles as part of its ‘Net Zero’ Project

Bus service to M’luru airport may be delayed

ದುರಂತ ಬಳಿಕವೂ ಹಿಗ್ಗದ ಮಂಗಳೂರು ರನ್ವೇ: ಕರಾವಳಿಯ ಏರ್ಪೋರ್ಟ್ಗೆ ಇನ್ನೂ ವನವಾಸ!

ನಗರದಲ್ಲಿ ಹೊಸ ನಿರೀಕ್ಷೆ ಮೂಡಿಸಿದ “ವಾಟರ್ ಏರೋಡ್ರೋಮ್’

Domestic passenger traffic at MIA drops

Screening procedures strengthened at Mangaluru airport

SpiceJet to launch daily morning flight to B’luru from July 28

Mangaluru International Airport to Observe World Nature Conservation Day 2022

Bullet-resistant vehicle for Mangaluru airport security
Mangaluru airport becomes India’s first non-hypersensitive airport to get bullet-proof vehicle for CISF on duty

MIA Operationalizes Electric Vehicle Charging Station
Mangaluru International Airport acquires two electric cars

Reduce fare of flights from Gulf to M’luru, say expats

MIA plans to double EVs, charging stations by March 2023

ARFF unit at Mangaluru International Airport is future ready

Minister Somanna moots airstrip for Dharmasthala

IndiGo adds 6 new flights to bolster connectivity between India and Middle East including Dubai-Mangalore route

Kaavi Kale art form finds its way to Mangaluru International Airport

Mangaluru International airport simplifies process to claim lost items

ಮಂಗಳೂರು ಏರ್ಪೋರ್ಟ್ನ ದರ ಏರಿಕೆ ಪ್ರಸ್ತಾವಕ್ಕೆ ಏರ್ಲೈನ್ಸ್ಗಳ ವಿರೋಧ, ಅದಾನಿಗೆ ಹಿನ್ನಡೆ

Mangaluru International Airport reorients flow in domestic SHA for passenger convenience

Mangaluru gets early morning flight to Bengaluru in winter schedule

Early Morning Flight To Bengaluru, Daily Flight To Dubai From MIA As Per Winter Schedule
Fly Mangaluru-Bengaluru with IndiGo from 30 Oct

Mangaluru International Airport inducts upgraded crash ambulances to meet DGCA norms

MIA adds third EV to its motor pool as it marches to ‘Net Zero’ goal

KSRTC bus services to Mangaluru International Airport to begin soon

New arrival hall opened at Mangaluru International Airport 2 3

Mangalore International Airport introduces uni-directional traffic flow to ensure smooth vehicular movement

Mangalore airport to be renamed Mangaluru airport from next month


Passenger traffic almost near pre-Covid level at Mangaluru airport 2 3

DGCA to examine Tabletop airports to boost aviation safety


MIA opens international arrival hall at new integrated terminal building
MIA opens international arrival hall at new integrated terminal building

MIA Ushers In ‘GREEN’ Car Wash With Clean Cart

CISF at Mangaluru International Airport gets bomb detection and disposal equipment

MIA aids ‘Green’ quotient by switching over to LED lights

Mangaluru airport gets ACI accreditation

Adani One: Gautam Adani-led group launches consumer app for airports vertical; check services offered

Mangaluru International Airport to re-carpet runway from Jan 27

Mangaluru To Bengaluru: ವಿಮಾನದ ಮೂಲಕ ಪಾರ್ಸೆಲ್, ಮಂಗಳೂರು-ಬೆಂಗಳೂರು ರೂಟ್​ಗೆ ಭಾರೀ ಬೇಡಿಕೆ

Daily flight service to Delhi from January 27

User development fees at Mangaluru airport to go up

India-bound travellers offered new destinations, more flights under Qantas-IndiGo partnership
Quote:
New codeshare destinations for Qantas passengers will include Guwahati, Indore, Chandigarh, Mangalore, Jaipur, Nagpur, Thiruvananthapuram and Visakhapatnam.
MIA introduces automated parking system for greater passenger convenience

IndiGo begins daily flight services from Mangaluru to Delhi route.

Adani airport work may need new funding after FPO fiasco

MIA in sync with BCAS directive for awareness on baggage security

UDAN infra scheme: ಐದು ವರ್ಷದಲ್ಲಿ ವಿಜಯಪುರ, ಹಾಸನ, ಶಿವಮೊಗ್ಗ ಹೊಸ ವಿಮಾನ ನಿಲ್ದಾಣ ಅಭಿವೃದ್ಧಿ; ಬೆಂಗಳೂರು, ಮಂಗಳೂರು ಆಧುನೀಕರಣ

Mumbai-Mangaluru International Airport busiest route; 4.9 lakh passengers flew in 2022

MIA installs 2D Barcode scanners to expedite passenger movement
MIA in Sync with BCAS Directive for Awareness on Baggage Security

Mangaluru-Hubballi flight to stop from March 12

Mangaluru International Airport (MIA) handles 2,92,817 passengers in Jan- Feb 2

Mangaluru International Airport registers nearly 50% passenger growth in Jan-Feb 2023

Flight services to 7 new destinations from Ranchi

ಕೋಡಿಕಲ್ ನ ವಿವಿಧ ರಸ್ತೆ ಅಭಿವೃದ್ಧಿಗೆ ಗುದ್ದಲಿ ಪೂಜೆ ನೆರವೇರಿಸಿದ ಭರತ್ ಶೆಟ್ಟಿ

No slowing down: Adani Airports CEO

IndiGo launches Mangaluru-Patna through flight via Bengaluru as summer schedule of flights comes to effect 2

Mangaluru International Airport records 76% growth in passenger traffic

Kuwait expats demand more flights from Mangaluru airport

Air traffic movements record 42% growth

Mangaluru airport introduces FASTag facility for car parking

Bounce back: Mangaluru airport ranked 29th busiest airport in India

MIA to finish runway recarpet work on time

Mangaluru International Airport dedicates International Cargo Terminal for public use 2 3 4
Quote:
Spread over an area of 1,891 sq.m, including 1,200 sq mt area for international cargo and the rest for domestic, the ICT can manage 9,000 tonnes of international and domestic cargo per annum.
Quote:
The new ICT provides ample parking space for all stakeholders. The salient feature of the new facility is the availability of 10 truck bays, two dock levelers and forklift facility for effective handling of both inbound and outbound cargo. There is separate office space for the airline and customs. This facility with centralized AC also provides strong room, cold storage, and dangerous goods storage facility as per norms prescribed by the aviation cargo regulators.
Quote:
Internationally, the ICT will manage fruits, vegetables, food stuff, chilled/frozen fish, spare parts & textiles. Domestically, the cargo includes post office (PO) mail; courier iterms; perishables, valuables (jewellery); blood samples for pharma; human remains; documents/general and e-commerce items and dangerous goods. The PO mail chiefly consists of items that a Manipal based security press sends out to banks such as cheque books and other government security documents.
MIA to handle 242 weekly air traffic movements in summer schedule from June 1

Mangaluru International Airport wins platinum rating in ACI green airports recognition

Indigo to Reintroduce Mangaluru-Mumbai Direct Flight Service from May 22

Passenger Traffic Movement More Than Doubles At Adani-run Airports

Mangaluru International Airport becomes travelers’ favourite! Handles highest number of passengers in July

Mangaluru International Airport has a ‘connectivity’ problem!

MIA conducts full-scale emergency exercise to check stakeholders’ preparedness to face emergencies

Mangaluru International Airport further bolsters security capabilities of ASG

Mangaluru to get fifth daily flight to Bengaluru from Sept 7, six on Saturday

Mangaluru International Airport Expansion Project at ₹5200 Crores

ವಿಮಾನ ನಿಲ್ದಾಣ ಪ್ರಯಾಣಿಕರ ಸಂಖ್ಯೆ ಉತ್ತಮ
Mangaluru International Airport offers good passenger load for airlines 3

Mangaluru airport’s cargo terminal handles 1676.21 tonnes since May 2

ಮಂಗಳೂರು ಅಂತರಾಷ್ಟ್ರೀಯ ವಿಮಾನ ನಿಲ್ದಾಣ ಆಡಳಿತ ಪೂರ್ತಿ ಅದಾನಿ ವಶಕ್ಕೆ! 2
Quote:
ಅಂತಾರಾಷ್ಟ್ರೀಯ ಪ್ರಯಾಣಿಕರಿಗೆ ಆಗಮನ ಹಾಲ್ನ್ನು ರಚಿಸಲಾಗಿದೆ. ಹಿಂದಿನ ಹಾಲ್ನ್ನು ವಿಶಾಲವಾಗಿ ದೇಶೀಯ ಯಾನಿಗಳಿಗೆ ಮೀಸಲಿರಿಸಲಾಗಿದೆ. ನಾಲ್ಕು ಏರೋಬ್ರಿಡ್ಜ್ ಸಾರಿಗೆ ಮತ್ತೆ ಎರಡು ಸೇರ್ಪಡೆಯಾಗಿದೆ. ರನ್ವೇಗೆ ಡಾಂಬರೀಕರಣ ನಡೆಸಿ ಸುರಕ್ಷತೆಗೆ ಹೆಚ್ಚಿನ ಗಮನ ನೀಡಲಾಗಿದೆ. ಕೆಳ ಅಂತಸ್ತಿನಲ್ಲಿ ಆಗಮನ ಹಾಗೂ ನಿರ್ಗಮನಕ್ಕೆ ಒಂದೇ ದಾರಿ ರಚನೆ, ಪಾರ್ಕಿಂಗ್ನಲ್ಲಿ ತಾಂತ್ರಿಕತೆ ಅಳವಡಿಕೆ, ಮುಂಗಡ ಬುಕ್ಕಿಂಗ್ ವಾಹನ ಸೌಕರ್ಯ, ಟ್ಯಾಕ್ಸಿ ಚಾಲಕರಿಗೆ ವಿಶ್ರಾಂತಿ ಗೃಹ ಹಾಗೂ ಕುಡಿವ ನೀರು ಸೌಲಭ್ಯ, ವಿಮಾನ ನಿಲ್ದಾಣ ಒಳಗೆ ಹೆಚ್ಚುವರಿ ತಿಂಡಿ, ತಿನಿಸುಗಳ ವ್ಯವಸ್ಥೆ ಏರ್ಪಡಿಸಲಾಗಿದೆ. ಈಗ ಕೆಳ ಅಂತಸ್ತಿನಲ್ಲಿ ‘ಏರ್ಪೋರ್ಟ್ ವಿಲೇಜ್’ ಪರಿಕಲ್ಪನೆಯಲ್ಲಿ ಕಂಟೈನ್ ಮಾದರಿಯಲ್ಲಿ ಶಾಪಿಂಗ್ ಅಂಗಡಿಗಳಿಗೆ ಸಿದ್ಧತೆ ನಡೆಯುತ್ತಿದೆ.
ಮಂಗಳೂರು ವಿಮಾನ ನಿಲ್ದಾಣಕ್ಕೆ ಶೀಘ್ರ ಎಲೆಕ್ಟ್ರಿಕ್ ಬಸ್ ಸಂಚಾರ..!

Adani Group to take complete control over management of Mangaluru airport from Oct 31

Mangaluru International Airport bags prestigious Quality Management, Finance Transformation awards

MCC to spend ₹1.39 crore to illuminate roads leading to Kudroli Gokarnanatha and other temples during Dasara

IIndiGo adds third flight from Mangaluru to Hyderabad

Shobha Karandlaje to discuss Kalaburagi-Mangaluru flight

Mangaluru Airport Wins Gold for Innovative Concept

Mangalore Airport News Mangaluru airport prepares for 26% increase in winter flight schedule
MIA Will See 26 Per Cent Growth In Flights With Winter Schedule
Mangaluru airport to get more flights in winter schedule
Mangaluru International Airport Prepares for Winter Schedule Surge
Quote:
During the period from October 29 to November 15, MIA is poised for significant growth, with flight frequencies expected to surge by up to 26%. Presently, the airport handles 136 weekly flights, both on domestic and international routes. This number is set to rise incrementally, reaching 138 flights (a 1% increase) on October 29, followed by 145 flights (a 7% increase) from November 3, 158 flights (a 16% increase) from November 6, and a substantial 172 flights (a 26% increase) from November 15.
Mangaluru International Airport commences work to install runway centreline lights 2 3

Air India Express to start two new flights to Bengaluru from Mangaluru International Airport

Mangaluru International Airport kickstarts work on ‘The Airport Village’
Quote:
... Work on the first phase of this project which is coming up in the forecourt of the airport on the lower ground floor has commenced. This will provide diverse food and beverage, retail and gaming opportunities to name a few, for all enthusiasts.
Work on airport village project begins in Mangaluru

Coast has 7 daily flights to B’luru; AIE starts services

Mangaluru International Airport handles record 7,399 passengers on November 19 since October 31, 2020

Mangaluru International Airport bags two national awards

Some passengers complain of less seats at M’luru airport

Traffic handling, MIA breaks its record, again!
Mangaluru International Airport handles record 1.76 lac passengers in Nov

MIA and IndiGo successfully innovate speedy disembarkation of passengers

Airline tries 3-point disembarkation at MIA 2

MIA handles record 2 lakh passengers in December
Mangaluru International Airport handles record 2.03 Lakh passengers in December 2023

Weekly M’luru-Jeddah direct flight from April 3

MIA adjudged best airport in under ‘five million passengers’ category at Wings India event

IndiGo switches to ATRs on B’luru-Mangaluru route

MIA handles agri-produce (arecanut) 2

Dist admin told to expedite 32.9 acres land acquisition for the expansion of Runway Safety Basic Strip and Runway End Safety Area

Jeddah will be the 8th international route from Mangaluru International Airport

Level 3 recognition to Mangalore International Airport
Mangaluru International Airport makes history! Achieves prestigious level-3 Customer Experience Accreditation

Flights from MIA to Mumbai reduced

ಕಲ್ಬುರ್ಗಿಯಿಂದ ಮಂಗಳೂರಿಗೆ ಶೀಘ್ರ ವಿಮಾನಯಾನ ಸೇವೆ ; ಉಮೇಶ್ ಜಾಧವ್

More flights to Dammam, Chennai; Jeddah new route

ಅದಾನಿ ಗ್ರೂಪ್ನಿಂದ ₹60,000 ಕೋಟಿ ವೆಚ್ಚದಲ್ಲಿ ಮಂಗಳೂರು ಸೇರಿ 7 ವಿಮಾನ ನಿಲ್ದಾಣಗಳ ವಿಸ್ತರಣೆ

Mangaluru International Airport bags Build India Infra Award for innovation

Mangaluru airport gets non-stop flight service to Trichy once-a-week
ಮಂಗಳೂರಿನಿಂದ ಜೆದ್ದಾಗೆ ಹೊಸ ವಿಮಾನ; ಕರಾವಳಿಗೆ ಹತ್ತಿರವಾದ ಸೌದಿಯ ವ್ಯಾಪಾರ ಕೇಂದ್ರ!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > India
Forum Jump



Forum Jump


All times are GMT. The time now is 4:52 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.