The Palm Beach Post says that All Aboard is buying land
and geting ready for construction.
also on Thursday to anounce some plans......
Reply With Quote
     
     
  #142  
Old Posted Dec 10, 2012, 3:01 AM
Lakelander's Avatar
Lakelander Lakelander is offline
Registered User
 
Join Date: Jan 2003
Location: Jacksonville, FL
Posts: 3,867
Another step forward in FEC's plan to utilize the BeachLine for rail between Orlando and Cocoa.

All Aboard Florida only bidder to build private rail lines to Orlando

full article: http://www.palmbeachpost.com/news/bu...vate-ra/nTQNT/
__________________
Metro Jacksonville
Reply With Quote
     
     
  #143  
Old Posted Dec 10, 2012, 5:33 AM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 2,967
Miami-to-Orlando passenger rail on track

http://www.sun-sentinel.com/news/bro...,1551050.story

Quote:
A new passenger rail service is on track to begin in 2015, whisking travelers from Miami to Orlando, while offering hourly trains, gourmet meals and Wi-Fi.

The $1 billion project will generate about 1,200 construction jobs and 400 permanent jobs — as well as some inconveniences for motorists. They'll have to wait more often at railroad crossings and in a few instances find another route because three crossings will close to accommodate stations.
Reply With Quote
     
     
  #144  
Old Posted Dec 10, 2012, 8:11 PM
Dale Dale is online now
Registered User
 
Join Date: Dec 2001
Location: Charlotte
Posts: 4,776
Sounds like a goer, but I noticed that completion has now been bumped from 2014 to 2015. Maybe 2014 was always unrealistic.
Reply With Quote
     
     
  #145  
Old Posted Dec 10, 2012, 9:36 PM
electricron's Avatar
electricron electricron is offline
Registered User
 
Join Date: Aug 2008
Location: Granbury, Texas
Posts: 3,523
Lightbulb

Quote:
Originally Posted by Dale View Post
Sounds like a goer, but I noticed that completion has now been bumped from 2014 to 2015. Maybe 2014 was always unrealistic.
They were suggesting December 2014, early 2015 wouldn't be that much of a set back. Anytime you're having to wait on government for a decision, you should expect some set backs.
Reply With Quote
     
     
  #146  
Old Posted Dec 10, 2012, 10:03 PM
eleven=11 eleven=11 is offline
Registered User
 
Join Date: Aug 2012
Posts: 1,053
Quote:
Originally Posted by Dale View Post
Sounds like a goer, but I noticed that completion has now been bumped from 2014 to 2015. Maybe 2014 was always unrealistic.
did the orlando airport announce the new station plans
also does it connect to the new downtown orlando station....
Reply With Quote
     
     
  #147  
Old Posted Dec 10, 2012, 10:07 PM
Lakelander's Avatar
Lakelander Lakelander is offline
Registered User
 
Join Date: Jan 2003
Location: Jacksonville, FL
Posts: 3,867
AAF will not go into DT Orlando. Instead Sunrail will have a second line that will terminate at the AAF airport station.
__________________
Metro Jacksonville
Reply With Quote
     
     
  #148  
Old Posted Dec 10, 2012, 10:17 PM
afiggatt afiggatt is offline
Registered User
 
Join Date: May 2009
Location: Virginia
Posts: 333
Quote:
Originally Posted by electricron View Post
They were suggesting December 2014, early 2015 wouldn't be that much of a set back. Anytime you're having to wait on government for a decision, you should expect some set backs.
December, 2014 was always an unrealistic start date for the proposed Miami to Orlando service. Besides the new stations to be built, the miles of second track to be added to the existing line, building ~40 miles of new track takes a while. Even if most of the new tracks will be in a medium strip of a highway, there will be flyover bridges, connecting bridges to build, probably some utility relocations, etc. I think FECI knew that the December, 2014 was not realistic, but they are using the early start dates to create a sense of urgency with the state agencies, municipal government, airport authority, political leaders to get them to respond quickly and not let applications sit in the inbox for 6 months before doing anything.
Reply With Quote
     
     
  #149  
Old Posted Dec 11, 2012, 2:41 AM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 2,967
Quote:
Originally Posted by electricron View Post
They were suggesting December 2014, early 2015 wouldn't be that much of a set back. Anytime you're having to wait on government for a decision, you should expect some set backs.
I'm guess that you have wait for an approved. Try to be more patiently. Give it chance. Right now, they were in negotiating.
Reply With Quote
     
     
  #150  
Old Posted Dec 11, 2012, 3:58 AM
Dale Dale is online now
Registered User
 
Join Date: Dec 2001
Location: Charlotte
Posts: 4,776
Quote:
Originally Posted by Lakelander View Post
AAF will not go into DT Orlando. Instead Sunrail will have a second line that will terminate at the AAF airport station.
Huh ? This is news to me.
Reply With Quote
     
     
  #151  
Old Posted Dec 11, 2012, 4:35 AM
Lakelander's Avatar
Lakelander Lakelander is offline
Registered User
 
Join Date: Jan 2003
Location: Jacksonville, FL
Posts: 3,867
^Using OUC's rail line as a short extension has been discussed before and is a part of OIA's master plan. Here is a map showing it as a HSR connection a few years back:





Here is a recent article about using OUC's existing rail line as the connection. I believe this is the same line/ROW that AAF will use from the opposite end to access the proposed Orlando airport station:

Quote:
But Lambert said converting the OUC rail spur to commuter rail could be fast-tracked, and sources said it could be online by the time SunRail begins its second phase of operations in 2016.
http://www.bizjournals.com/orlando/p...4m.html?page=2

My guess, is this concept will be eventually built. It's not expensive as other options discussed and the presence of AAF provides the incentive to do it. In the meantime, you'll most likely have shuttle service between the two systems.
__________________
Metro Jacksonville
Reply With Quote
     
     
  #152  
Old Posted Dec 11, 2012, 5:06 AM
electricron's Avatar
electricron electricron is offline
Registered User
 
Join Date: Aug 2008
Location: Granbury, Texas
Posts: 3,523
Lightbulb

Quote:
Originally Posted by afiggatt View Post
December, 2014 was always an unrealistic start date for the proposed Miami to Orlando service. Besides the new stations to be built, the miles of second track to be added to the existing line, building ~40 miles of new track takes a while. Even if most of the new tracks will be in a medium strip of a highway, there will be flyover bridges, connecting bridges to build, probably some utility relocations, etc. I think FECI knew that the December, 2014 was not realistic, but they are using the early start dates to create a sense of urgency with the state agencies, municipal government, airport authority, political leaders to get them to respond quickly and not let applications sit in the inbox for 6 months before doing anything.
I disagree. Have you taken the time to watch this video I posted earlier?
http://www.youtube.com/watch?v=Dl1yVSD_Tv8
In it, during the 26th minute of the video, they stated the longest lead time for completing this project is ordering, building, and testing their trains, estimated to take 20 to 30 months. Therefore they could potentially make a December 2014 opening date if they order their trains by April 2013. Assuming they order the trains in January 2013, the worse case would be operational by July 2015.
Reply With Quote
     
     
  #153  
Old Posted Dec 11, 2012, 5:15 AM
eleven=11 eleven=11 is offline
Registered User
 
Join Date: Aug 2012
Posts: 1,053
yes but we are all waiting on the annoucment about
orlando airport...............
the final plans
no more high speed rail, just All Aboard & Sun Rail
Reply With Quote
     
     
  #154  
Old Posted Dec 11, 2012, 6:43 AM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 2,967
Quote:
Originally Posted by Lakelander View Post
^Using OUC's rail line as a short extension has been discussed before and is a part of OIA's master plan. Here is a map showing it as a HSR connection a few years back:





Here is a recent article about using OUC's existing rail line as the connection. I believe this is the same line/ROW that AAF will use from the opposite end to access the proposed Orlando airport station:
Where did you find out about new South terminal? When they going to being built? I wasn't sure about this one. I guess they will have a plans to being built a brand new terminal. How those passengers who will catch the flight from North terminal to South terminal?
Reply With Quote
     
     
  #155  
Old Posted Dec 11, 2012, 6:58 AM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 2,967
Hi All,

They already groundbreaking a brand new South terminal. Here is the link:

http://www.prnewswire.co.uk/news-rel...156749115.html

You guys didn't realize know it. Which airlines will be? And also, there is some a few domestic gates as well.
Reply With Quote
     
     
  #156  
Old Posted Dec 11, 2012, 2:11 PM
Lakelander's Avatar
Lakelander Lakelander is offline
Registered User
 
Join Date: Jan 2003
Location: Jacksonville, FL
Posts: 3,867
^The article you posted looks to be over a decade old. However, the intermodal rail facility component is what FEC/AAF and OIA are discussing. Here are two articles from a few months back:

Quote:
Demonstrating a vision for the future, the Greater Orlando Aviation Authority, which operates Orlando International Airport, has already invested in infrastructure for a station that could accommodate up to four rail systems. In discussing the integration of rail Brown explained, “We have planned our intermodal facility in a central location to service both the north and the future south terminal and All Aboard Florida is vying to be the first rail system to operate from it.”

The station as proposed would incorporate the airport’s design concept of The Orlando Experience™ with the prevailing use of light, water, gardens and open spaces for meetings and retail concessions.

In addition to other proposed community rail systems, including SunRail, the airport’s plans include an automated people mover that would provide passengers direct access from the current North Terminal to future expansion including additional aircraft gates to the South. SunRail will be Central Florida's first commuter rail line connecting four counties and spanning 61.5 miles including a future connection to Orlando International Airport.
http://www.orlandoairports.net/press/2012/20120620.htm


Quote:
Orlando International Airport officials could break ground next year on a $470 million expansion featuring a train depot and parking garage that eventually might lead to construction of a separate, southern terminal that would cost another $1 billion.

The deal, however, is far from done.

Plenty of obstacles could postpone or kill the plans, including another recession that dampens demand for air travel, failure to reach an agreement with the backers of the train or opposition from airlines and rental-car companies that lease space at the airport.
http://articles.orlandosentinel.com/...rport-director
__________________
Metro Jacksonville
Reply With Quote
     
     
  #157  
Old Posted Dec 13, 2012, 6:16 AM
eleven=11 eleven=11 is offline
Registered User
 
Join Date: Aug 2012
Posts: 1,053
another new train/maglev is coming to orlando airport
13$ to go from airport to the convention center

guess it will connect also to All Aboad & Sun Rail???
Reply With Quote
     
     
  #158  
Old Posted Dec 13, 2012, 11:47 AM
Lakelander's Avatar
Lakelander Lakelander is offline
Registered User
 
Join Date: Jan 2003
Location: Jacksonville, FL
Posts: 3,867
^That thing will have to break ground before I believe it's going to happen. The maglev guy wasted a lot of people's money on his failed Norfolk project. Also, $13/ticket sounds pretty expensive for a short trip between the airport and convention center. Show up with a family of four and you're looking at paying over $100 round trip. I'm a big mass transit supporter, but at that number, it would be possibly cheaper to rent a car for a few days.
__________________
Metro Jacksonville
Reply With Quote
     
     
  #159  
Old Posted Dec 13, 2012, 2:15 PM
eleven=11 eleven=11 is offline
Registered User
 
Join Date: Aug 2012
Posts: 1,053
if you put your children inside your luggage maybe you can save some money.

maybe 8 or 9 or 10 dollars is better , plus a transfer to All Abord & Sun Rail.
Reply With Quote
     
     
  #160  
Old Posted Dec 13, 2012, 5:08 PM
Baronvonellis Baronvonellis is offline
Registered User
 
Join Date: Sep 2009
Location: Chicago
Posts: 880
He says the maglev is only going to go 50MHP. Why would he spend the insane costs for maglev? Why not just use conventional light rail that would be far cheaper?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 2:38 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.