Quote:
Some seem to think site I is going to break ground as soon as construction wraps up on Cirrus and Cascade just b/c the developer said site I was the next tower to start after those two are completed. The developer simply meant site I was the next tower to break ground but not necessarily right after. Also, I believe site I is supposed to host 600 condos after the hotel portion was removed. Minus COVID, we would have been lucky to have site I break ground late 2021. I highly doubt that'll happen now. Maybe sometime in 2022. Hope I'm wrong though.
|
Yea, to quote the article the whole thing may take 5-7 years. Not sure how long it's been but it's a simple math problem once that's figured out.
Quote:
The tower is the final phase for the three-building plan at Parcels IJKL. Work will not begin on the structure until Cirrus and Cascade are complete. Reports state that the total construction period for Cirrus, Cascade, and Parcel I will be between five and seven years.
|
Quote:
My outstanding question pertains to if Site I will entail both residential to own and residential to rent. This seems to be the most safe approach both financially and occupancy for projects this size.
|
That would make sense, are the shorter (currently UC) ones rentals?