HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted May 15, 2012, 8:10 PM
lawfin lawfin is offline
BANNED
 
Join Date: Sep 2008
Location: Chicago
Posts: 1,697
Quote:
Originally Posted by k1052 View Post
Ramping up city service with new infill stations and more frequency would probably require electrification. Not that it isn't a conversation worth having since Metra already blows through populated areas that have less than ideal CTA rail access.

Getting UP to seriously discuss electrification is going to be...challenging. Maybe Metra could do a pilot program on the RI first.
Let me preface with the fact that I am in no way a transit professional, engineer etc. Why would electrification be required....pollution, fuel costs? I am curious.

I imagine one of the barriers to increasing frequency..... besides the institutional inertia of an organization that has historically looked to ever expanding into suburbia as its method of growth.....is that there may be capacity constraints at the DT terminus and other "crossovers" where trains that don't complete a run can be rerouted back the other direction.

I don't know the lingo so I am trying to describe as best I can.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 5:58 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.