(2) SIDE SEWER INSTALLATIONS (CONNECT TO EX SS LATERALS) AND INSTALL STORM DRAIN (CONNECT TO EX SS LATERAL). EVAL/CERT & LINE. NO BLDG CONNECTIONS. ASSOC BLDG PERMIT 6105330. 10/6/14 JCB; ADD WORK IN ROW.
Meanwhile the developer has recently started four other towers (two each at 1200 Stewart and 707 Terry), and they're building a sales center on the 2000 3rd site for use until the site is needed, which is probably mid-2019 at earliest.
__________________
If all others accepted the lie which the Party imposed, if all records told the same tale, then the lie passed into history and became truth. -Orwell
It's a sales office for two other projects by the same developer, both digging, which will include condos in some portion of:
--Twin 44-story towers at 1200 Stewart
--Twin 30-story towers at 707 Terry
--I'm sure they'll be able to talk about this one too, but generally sales offices need to be at least relocatable (is this?) to somewhere offsite so they aren't torn down 30 months before the building opens.