Old Posted Nov 22, 2015, 3:48 PM
streetscaper streetscaper is offline
Registered User
 
Join Date: May 2004
Location: New York
Posts: 2,701
Quote:
Originally Posted by NYguy View Post
You've got it wrong. 111 W57th is the Steinway Building. This is being built as an extension. Some of the units will be in the existing building, which also accounts for a bulk of the space in the project. Think of the Hearst Tower a little further down 57th. Look at the graphic above, the entire thing is one building. Only that wall was supposed to be removed as part of the development.
Quote:
Originally Posted by phoenixboi08 View Post
Yes, I believe you are correct.
So you two are saying that the iron structure is staying, and that the supertall will cantilever over it? Is this true?
__________________
hmmm....
     
     
  #1482  
Old Posted Nov 22, 2015, 8:13 PM
sbarn sbarn is offline
Registered User
 
Join Date: Feb 2004
Posts: 2,071
Quote:
Originally Posted by streetscaper View Post
So you two are saying that the iron structure is staying, and that the supertall will cantilever over it? Is this true?
Like I mentioned earlier, the tower and existing tower need to remain structurally independent. So if the existing steel structure stays, the shear wall on the left of the plan below would need to be transferred to bring that load down to the ground. This would be very difficult. My guess is the steel needs to be removed. If the steel is not removed, it will have to be substantially re-engineered to support the loads of a 1,400 foot tower rising above.



The Hearst Tower was a different beast since the original building was designed to have a tower built on top of it (the tower was nixed during the depression). Therefore, the existing building's structure was sized to accommodate the loads of a new tower. Plus, the Hearst Tower was a steel frame structure on top of a steel structure, whereas 111 West 57th Street is a concrete building built directly adjacent / adjoining to an existing steel frame structure - this is why I believe the existing and new construction must be structurally independent from one another.

Just some thoughts from an architect...
     
     
  #1483  
Old Posted Nov 22, 2015, 9:52 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 51,747
Here's what's being done as far as the landmark goes (keeping in mind only a portion is landmarked).

























__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
     
     
  #1484  
Old Posted Dec 13, 2015, 1:01 AM
TechTalkGuy's Avatar
TechTalkGuy TechTalkGuy is offline
Mr. Technology
 
Join Date: Jul 2006
Posts: 3,008
111 W. 57th Street
     
     
  #1485  
Old Posted Dec 15, 2015, 4:08 AM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 51,747
DECEMBER 12, 2015



__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
     
     
  #1486  
Old Posted Dec 15, 2015, 6:04 AM
dendenden's Avatar
dendenden dendenden is offline
Registered User
 
Join Date: Jan 2014
Location: Denver
Posts: 82
The slow development of this is really messing with my anxiety issues

     
     
  #1487  
Old Posted Dec 15, 2015, 6:33 AM
JDRCRASH JDRCRASH is offline
Registered User
 
Join Date: Mar 2007
Location: San Gabriel Valley
Posts: 8,087
For whatever reason, the facade reminds me an awful lot of the Twin Towers.

Which I really like.
__________________
Revelation 21:4
     
     
  #1488  
Old Posted Dec 15, 2015, 2:15 PM
nyc_alex nyc_alex is offline
Registered User
 
Join Date: Feb 2011
Posts: 111
Quote:
Originally Posted by JDRCRASH View Post
For whatever reason, the facade reminds me an awful lot of the Twin Towers.

Which I really like.
I see what you mean from the sides. I like it too, makes it look so much taller when it has those thin vertical stripes like that.
     
     
  #1489  
Old Posted Dec 15, 2015, 4:43 PM
punchydj punchydj is offline
Registered User
 
Join Date: Jan 2009
Posts: 106
Hi guys!!

There is the construction update during the third quarter of 2015. As you can see, there wasn´t too much progress on the plot. Maybe on the next months there will be more advances on the plot.

Video Link


Thank You!!
     
     
  #1490  
Old Posted Dec 15, 2015, 4:52 PM
CityGuy87 CityGuy87 is offline
Registered User
 
Join Date: Sep 2012
Posts: 288
Given the slow rate the progress has been at this site, all the other towers will already be topped out by the time this finally starts rising. 217 W57 and 220 CPS are well above street level now. 53W53 is about to go vertical real soon and 520 Park is now above the street too. I know we're very impatient here when it comes to the construction process but goddamn, this tower is taking FOREVER!
     
     
  #1491  
Old Posted Dec 16, 2015, 1:27 AM
ILNY ILNY is offline
Registered User
 
Join Date: Jan 2013
Posts: 1,748
^ Got a word from the person who works at the site that they just hired one additional worker. The tower should really progress now.
     
     
  #1492  
Old Posted Dec 16, 2015, 1:42 AM
CityGuy87 CityGuy87 is offline
Registered User
 
Join Date: Sep 2012
Posts: 288
Quote:
Originally Posted by ILNY View Post
^ Got a word from the person who works at the site that they just hired one additional worker. The tower should really progress now.
So now we have what? 3 workers on site? lol
     
     
  #1493  
Old Posted Dec 16, 2015, 2:28 AM
timpdx's Avatar
timpdx timpdx is offline
Registered User
 
Join Date: Feb 2015
Location: Los Angeles
Posts: 365
There needs to be a ban on posting renders until this thing gets going vertical. Its such a cock-tease excercise at this point.
__________________
Travel, Scenic & Architecture Photos at: http://www.pixelmap.com/
     
     
  #1494  
Old Posted Dec 16, 2015, 6:11 AM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 51,747
Exclamation

Quote:
Originally Posted by dendenden View Post
The slow development of this is really messing with my anxiety issues

Quote:
Originally Posted by CityGuy87 View Post
Given the slow rate the progress has been at this site, all the other towers will already be topped out by the time this finally starts rising. 217 W57 and 220 CPS are well above street level now. 53W53 is about to go vertical real soon and 520 Park is now above the street too. I know we're very impatient here when it comes to the construction process but goddamn, this tower is taking FOREVER!

We've know since this tower was unveiled that it would be a slow process due to the landmark and complicated nature of this development. It's one of the reasons JDS got permission to start work on site as soon as possible. It that hasn't sunk in yet, then it's best to avoid this thread for a good while, as it will be some time before you see a "new" tower rising into the sky.
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
     
     
  #1495  
Old Posted Dec 17, 2015, 5:59 PM
Notyrview Notyrview is offline
BANNED
 
Join Date: Dec 2012
Location: New York City
Posts: 1,648
^Thanks for sharing
     
     
  #1496  
Old Posted Dec 23, 2015, 2:44 AM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 51,747
^ It's why I'm here.



http://www.nytimes.com/2015/12/22/ny...bors.html?_r=0

As a New High Society Climbs in Manhattan, It’s a Race to the Top


By MATT A.V. CHABAN
DEC. 21, 2015



Quote:
....For 111 West 57th Street, just off the Avenue of the Americas and planned at 1,428 feet, the advertising is close-cropped, heightening the drama and detail of the saw-toothed terra-cotta tower and its relationship to the park. One57 is pictured, but 432 Park is missing here, too, as is a proposed redevelopment of the Park Lane Hotel, set to rise at least 1,000 feet on Fifth Avenue near Central Park South.

“We’re not forecasters, so any building that’s not built yet wouldn’t be a factor for us,” explained Michael Stern, founder and managing partner of JDS Development, which is building 111 West 57th Street. “I actually really like 432,” he added. “It makes my building look less intimidating.”
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
     
     
  #1497  
Old Posted Dec 24, 2015, 11:13 PM
Zapatan's Avatar
Zapatan Zapatan is offline
DENNAB
 
Join Date: Aug 2009
Location: NA - Europe
Posts: 6,042
Not that it really matters. But recently I keep seeing 1,428 and 1,421 thrown around as if they shortened the building a little again. Maybe the articles are just wrong, but it would be nice if it were at least a little noticeably taller to the tip than 432.

Regardless the facade and just this building in general are amazing.
     
     
  #1498  
Old Posted Dec 27, 2015, 4:00 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694
Here are some details about what 111 West 57th Street will look like inside



Quote:
Studio Sofield is doing all the interior design work for the building, and told AD about all the high-end products being used to craft the interiors. The giant urns in the lobby are made from rock crystal; P.E. Guerin, the classic foundry, is doing all of the hardware in the building; the bathtubs are being carved from solid alabaster; the floors are “end-grain marquetry”; and, somewhat mysteriously, the building will feature “lots of fluted glass.”

As fab as all that sounds, it doesn’t even come close to another project Sofield is working on for a pied-à-terre on Fifth Avenue, where you can press a button to make all the walls disappear. It also has woven leather and silver lamé curtains, which Sofield says “only make sense in some scenario with Bette Midler riding around the apartment in a wheelchair, wearing a mermaid outfit.”
===========================
http://www.llnyc.com/38680-here-are-...ok-like-inside
     
     
  #1499  
Old Posted Dec 30, 2015, 5:27 AM
ILNY ILNY is offline
Registered User
 
Join Date: Jan 2013
Posts: 1,748
I counted 7 workers... they are on hiring spree !


Foundation work is completed for some of the first support columns.

     
     
  #1500  
Old Posted Dec 30, 2015, 1:33 PM
TechTalkGuy's Avatar
TechTalkGuy TechTalkGuy is offline
Mr. Technology
 
Join Date: Jul 2006
Posts: 3,008
Quote:
Originally Posted by ILNY View Post
I counted 7 workers... they are on hiring spree !
I wonder if I should apply for a job there!
Of course, I'd be too busy building to snap pics.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 1:46 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.