Quote:
Originally Posted by DeltaNerd
Does she mean building over the rail yard or the station itself. Supposedly there is suppose to be a public meeting Early 2023 about the station itself from Amtrak and Plenary Infrastructure Philadelphia (PIP)
|
The overbuild of the train yard. She was pretty clear.
IIRC the first phase of the project was always going to be the remodeling of the station and its grounds.