HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Supertall Construction


    The One in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Toronto Skyscraper Diagram

Map Location
Toronto Forum   • Toronto Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Aug 1, 2022, 4:02 PM
Maldive's Avatar
Maldive Maldive is online now
Registered User
 
Join Date: Sep 2004
Posts: 4,223
Quote:
Originally Posted by colemonkee View Post
Looks like they're starting the slow march upwards with the corner plates, but they no longer appear to be cantilevered. Are those corner columns steel or concrete? I ask because I don't see any column form work.
As I noted above, once the forms move up, the next set of hangers for 3 more floors will be installed, to be followed by concrete pours for the missing corner pieces that you see in the photo (each set of floors have cantilever support from the angled hangers).

If you look at the photo I posted, you'll note that corner columns are for the two floors only (they are reinforced concrete btw), while the third floor may not require a corner column*... its ceiling is the 4th floor slab which will hang from the bottom of the next set of hangers*.

*Don't see any corner column forms for the third floor .. so that's my theory ;-).
__________________
circa 2008: home of the 3rd best skyline in N.A. +++ circa 2028: home of the 2nd best skyline in N.A. (T-Dot)

Last edited by Maldive; Aug 1, 2022 at 4:18 PM.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Global Projects & Construction > Supertall Construction
Forum Jump



Forum Jump


All times are GMT. The time now is 8:39 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.