HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #5541  
Old Posted Aug 2, 2009, 3:59 PM
the urban politician the urban politician is offline
The City
 
Join Date: Jul 2004
Location: Chicago region
Posts: 21,375
Quote:
Originally Posted by Busy Bee View Post
Its because its a lame mall in a grand space with no active rail activity. If that isn't a shame, I don't know what is.
^ It's a historic building that has found active reuse. Let's get a sense of perspective, if you want to see a real shame, look no further than this:

__________________
Supercar Adventures is my YouTube channel:

https://www.youtube.com/channel/UC4W...lUKB1w8ED5bV2Q
Reply With Quote
     
     
  #5542  
Old Posted Aug 2, 2009, 5:57 PM
orulz orulz is offline
Registered User
 
Join Date: Jul 2003
Posts: 584
Quote:
Originally Posted by ardecila View Post
Of course, if the West Loop Transportation Center is ever built, the west alcove of the Great Hall will probably be turned into an escalator bank down to the Clinton concourse, and the Great Hall itself will become a critical artery connecting Metra and conventional Amtrak with the Red Line and high-speed trains.
I really wonder whether the HSR portion of the WLTC makes any sense at all. The diagrams that I have seen depict it as the bottom level of a 5-level cut-and-cover complex under Clinton Street. Clinton is narrow enough so that there would really only be room for two HSR platforms. Or, at best, four - if it's arranged as a two-sided terminal station like Union Station. That just ain't enough.

To make enough space for a real station, it would have to be a great deal deeper than that to allow for a bored / mined cavern-style terminal - on the order of 150 feet underground for something like the East Side Access terminal in Manhattan. Reconfiguring Union Station to allow for more through tracks and probably a fourth approach track from the north seems, to me, like a better solution.
Reply With Quote
     
     
  #5543  
Old Posted Aug 2, 2009, 6:20 PM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
Show me the blueprints
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,302
TUP: Touche.
__________________
Everything new is old again

There is no goodness in him, and his power to convince people otherwise is beyond understanding
Reply With Quote
     
     
  #5544  
Old Posted Aug 2, 2009, 6:46 PM
ardecila's Avatar
ardecila ardecila is offline
TL;DR
 
Join Date: Jun 2006
Location: the city o'wind
Posts: 16,356
Quote:
Originally Posted by orulz View Post
I really wonder whether the HSR portion of the WLTC makes any sense at all. The diagrams that I have seen depict it as the bottom level of a 5-level cut-and-cover complex under Clinton Street. Clinton is narrow enough so that there would really only be room for two HSR platforms. Or, at best, four - if it's arranged as a two-sided terminal station like Union Station. That just ain't enough.

To make enough space for a real station, it would have to be a great deal deeper than that to allow for a bored / mined cavern-style terminal - on the order of 150 feet underground for something like the East Side Access terminal in Manhattan. Reconfiguring Union Station to allow for more through tracks and probably a fourth approach track from the north seems, to me, like a better solution.
I seriously question the configuration of the West Loop Transportation Center as it stands, especially the need for a pedestrian concourse running the length. Close off Clinton, make Canal two directions, and then the surface of Canal will be the pedestrian component. That will also allow for more and larger skylights to bring sunlight down into the tunnel.

Also, the bus level could probably be scrapped and moved to the surface as well. By placing subway entrances in surrounding buildings, the need for a mezzanine can be avoided. Then you could build only a three-level tunnel with one CTA level and two rail levels.
__________________
la forme d'une ville change plus vite, hélas! que le coeur d'un mortel...
Reply With Quote
     
     
  #5545  
Old Posted Aug 2, 2009, 8:09 PM
bnk bnk is offline
BANNED
 
Join Date: Mar 2006
Location: chicagoland
Posts: 12,741
http://www.chicagotribune.com/news/c...,5724954.story


Commuter rail line in NW Indiana plans shutdowns

Associated Press

5:32 PM CDT, August 1, 2009

GARY, Ind.

The South Shore commuter rail line in northwestern Indiana plans to suspend service along parts of its route on five upcoming weekends as well as about two full weeks in October.

The Times of Munster reports electric cable and bridge work on the line that carries passengers to and from Chicago will be done.

The first weekend suspension between South Bend and Gary's Metro Center is planned for the weekend of Aug. 29.

All service between South Bend and Michigan City will be suspended for a two-week period sometime between Oct. 18 and Nov. 6.

------

Information from: The Times, http://www.thetimesonline.com
Reply With Quote
     
     
  #5546  
Old Posted Aug 2, 2009, 8:46 PM
electricron's Avatar
electricron electricron is offline
Registered User
 
Join Date: Aug 2008
Location: Granbury, Texas
Posts: 3,523
Lightbulb

Quote:
Originally Posted by bnk View Post
http://www.chicagotribune.com/news/c...,5724954.storyCommuter rail line in NW Indiana plans shutdowns
All service between South Bend and Michigan City will be suspended for a two-week period sometime between Oct. 18 and Nov. 6.

Information from: The Times, http://www.thetimesonline.com
Gasp! In the middle of Notre Dame football season! Horrible timing!
Reply With Quote
     
     
  #5547  
Old Posted Aug 2, 2009, 10:10 PM
Mr Downtown's Avatar
Mr Downtown Mr Downtown is offline
Urbane observer
 
Join Date: Nov 2006
Posts: 4,385
TUP, I don't know when you were last in St. Louis Union Station, but it's just barely wheezing along. A few food places and T-shirt shops, and lots and lots of vacant storefronts. I fear it will go the way of Indianapolis's.

Though obviously it will wait for better times, I don't think there's much question that Chicago Union Station will eventually have some combination of office, condo, and hotel in a new tower that "completes" the original massing scheme for the headhouse. The Great Hall will be restored and serve as a combination of lobby and retail space.

Reply With Quote
     
     
  #5548  
Old Posted Aug 2, 2009, 10:29 PM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
Show me the blueprints
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,302
^I do hope so.


I didn't know about the St. Louis Union station mall getting so bad, that makes it suck even worse. Haha, I went to Six Flags and Union Station for my 8th grade class trip in 1996. The mall seemed pretty hopping, but even then at that age I remember thinking how much of a disgrace it was to have a cheesy mall in a former grand and beautiful train terminal. I bought a copy New Electric Railway Journal from a hobby shop there that day.
__________________
Everything new is old again

There is no goodness in him, and his power to convince people otherwise is beyond understanding
Reply With Quote
     
     
  #5549  
Old Posted Aug 3, 2009, 12:46 AM
the urban politician the urban politician is offline
The City
 
Join Date: Jul 2004
Location: Chicago region
Posts: 21,375
Quote:
Originally Posted by Mr Downtown View Post
TUP, I don't know when you were last in St. Louis Union Station, but it's just barely wheezing along. A few food places and T-shirt shops, and lots and lots of vacant storefronts. I fear it will go the way of Indianapolis's.
^ That's unfortunate. I was last there about 2002 and it seemed to be doing alright then
__________________
Supercar Adventures is my YouTube channel:

https://www.youtube.com/channel/UC4W...lUKB1w8ED5bV2Q
Reply With Quote
     
     
  #5550  
Old Posted Aug 3, 2009, 2:02 AM
ardecila's Avatar
ardecila ardecila is offline
TL;DR
 
Join Date: Jun 2006
Location: the city o'wind
Posts: 16,356
Quote:
Originally Posted by the urban politician View Post
^ That's unfortunate. I was last there about 2002 and it seemed to be doing alright then
Imagine Navy Pier if half the storefronts were empty and you have St. Louis Union Station. At least the hotel is nice, though.

As for the planned highrise: I worry about Lagrange's ability to pull off something appropriate. The staff at that firm seems to be completely oblivious, given their huge blunder at 10 East Delaware. Surprisingly, they have also produced beautifully-executed modern buildings, like Erie on the Park, but I heard that the designer behind it was fired.

I honestly don't know who I would trust to do something properly revivalist. There's been some good work in DC... maybe one of those guys? Robert AM Stern might also do a good job.
__________________
la forme d'une ville change plus vite, hélas! que le coeur d'un mortel...

Last edited by ardecila; Aug 3, 2009 at 2:26 AM.
Reply With Quote
     
     
  #5551  
Old Posted Aug 3, 2009, 5:11 PM
Mr Downtown's Avatar
Mr Downtown Mr Downtown is offline
Urbane observer
 
Join Date: Nov 2006
Posts: 4,385
^Well, the Landmarks Commission staff will be reviewing everything carefully.
Reply With Quote
     
     
  #5552  
Old Posted Aug 5, 2009, 10:44 PM
nomarandlee's Avatar
nomarandlee nomarandlee is offline
My Mind Has Left My Body
 
Join Date: Jan 2006
Posts: 3,334
http://www.chicagotribune.com/news/l...,7159799.story

Railroad projects gain steam across Chicago area
New state money injects hope into slow-moving plan
By Richard Wronski | Tribune reporter
August 5, 2009


A motorist often needs two hours to travel from one end of the Chicago area to the other, but it can take two days for a freight train, slowed by a bewildering, century-old maze of tracks and outdated signals and switches.

So transportation officials were heartened when the Illinois legislature recently set aside $320 million for rail improvements, hoping it would help unlock train gridlock in Chicago -- the nation's biggest, busiest and most congested railroad hub.

The infusion of state dollars is expected to leverage additional millions in federal matching funds -- money that would build new crossings and overpasses, which could mean faster commutes for Metra and Amtrak riders as well as for long-suffering drivers now stuck waiting at blocked intersections.

Six of Metra's 11 lines operate on freight-owned tracks, and delays between passenger and freight trains regularly cause commuters to be late for work and dinner. Such encounters long have been part of the urban experience in a metropolitan area where each day as many as 500 freight and 800 passenger trains pass through a labyrinth of tracks and crossings.










..
Reply With Quote
     
     
  #5553  
Old Posted Aug 8, 2009, 10:02 AM
denizen467 denizen467 is offline
Registered User
 
Join Date: Feb 2006
Location: Chicago
Posts: 3,212
http://www.chicagobusiness.com/cgi-bin/news.pl?id=35066

Central Ave. bypass project gets green light

Paul Merrion Aug. 07, 2009

...

The Illinois Department of Transportation plans to proceed with $170.4 million in design, engineering, right-of-way land acquisition and other pre-construction work on the bypass, which would create a new north-south route across a large rail yard on the traffic-congested Southwest Side.

Transportation Secretary Ray LaHood will be in Chicago on Monday along with Rep. Dan Lipinski, D-Chicago, House Speaker Michael Madigan and other state and local officials to announce the project’s go-ahead.

“It’s been a long time coming,” says a spokesman for the congressman, who is pushing for construction money for the bypass in an upcoming federal transportation bill, which is stalled in Congress.

The project is expected to cost a total of $300 million to $600 million when completed, according to an IDOT spokeswoman, depending on final cost estimates. It would connect Central Avenue between 63rd and 87th streets, taking pressure off Cicero and Harlem avenues. No final decision has been made on whether it will be an overpass or an underpass, according to a Lipinski aide.

...
Reply With Quote
     
     
  #5554  
Old Posted Aug 8, 2009, 5:03 PM
ardecila's Avatar
ardecila ardecila is offline
TL;DR
 
Join Date: Jun 2006
Location: the city o'wind
Posts: 16,356
^^ In the article, it says that there's STILL money remaining from the Crosstown Expressway project in the 1970s. Huh?

This is very surprising if true.
__________________
la forme d'une ville change plus vite, hélas! que le coeur d'un mortel...
Reply With Quote
     
     
  #5555  
Old Posted Aug 8, 2009, 10:07 PM
VivaLFuego's Avatar
VivaLFuego VivaLFuego is offline
Registered User
 
Join Date: Feb 2005
Location: Blue Island
Posts: 6,480
It's an useful and important link in a part of town with a lot of manufacturing and distribution uses that cause a lot of congestion due to the plethora of railroads.... but good grief, $300-600 million for one overpass connection? That puts this one link as likely more expensive than the Orange Line extension to Ford City.
Reply With Quote
     
     
  #5556  
Old Posted Aug 9, 2009, 12:52 AM
denizen467 denizen467 is offline
Registered User
 
Join Date: Feb 2006
Location: Chicago
Posts: 3,212
Quote:
Originally Posted by ardecila View Post
^^ In the article, it says that there's STILL money remaining from the Crosstown Expressway project in the 1970s. Huh?
This is very surprising if true.
Probably not sitting in a bank account somewhere; more like an allotment that just hasn't been tapped into yet. Very surprising indeed, but maybe it was useable only for certain types/locations of projects. I dunno, "alleviation of crosstown road congestion" or something?

Quote:
Originally Posted by VivaLFuego View Post
It's an useful and important link in a part of town with a lot of manufacturing and distribution uses that cause a lot of congestion due to the plethora of railroads.... but good grief, $300-600 million for one overpass connection? That puts this one link as likely more expensive than the Orange Line extension to Ford City.
That is a huge amount, but it's an at least 1-mile-long overpass, plus road improvements over roughly the remaining 2 miles (total of 63rd to 87th). Plus, it might be an underpass (ka-ching, ka-ching, ventilation and emergency access shafts over 1-mile length, ka-ching). Plus, it's a hairy, complicated site with complicated, continuous, active use, meaning, among other things, long column-free spans if an overpass.

Out of curiosity, excluding the expressways (Edit: er, and Wacker Drive), are there currently any roadway viaducts in the city that are 1 mile long?

Last edited by denizen467; Aug 9, 2009 at 1:17 AM.
Reply With Quote
     
     
  #5557  
Old Posted Aug 9, 2009, 5:37 AM
ardecila's Avatar
ardecila ardecila is offline
TL;DR
 
Join Date: Jun 2006
Location: the city o'wind
Posts: 16,356
It's not like it'll be a tunnel. There's a pinch point of the railyard at Central, so an "underpass" would be more like a trench with a few rail bridges over it. The cost will reflect whether that trench needs retaining walls or can use sloped sides.

Viva, your comparison to the Orange Line seems appropriate. Likely, much of the cost comes from complex construction staging needed to preserve an active railyard.
__________________
la forme d'une ville change plus vite, hélas! que le coeur d'un mortel...
Reply With Quote
     
     
  #5558  
Old Posted Aug 9, 2009, 11:22 PM
jjk1103 jjk1103 is offline
Registered User
 
Join Date: Mar 2006
Posts: 878
Quote:
Originally Posted by denizen467 View Post
Probably not sitting in a bank account somewhere; more like an allotment that just hasn't been tapped into yet. Very surprising indeed, but maybe it was useable only for certain types/locations of projects. I dunno, "alleviation of crosstown road congestion" or something?



That is a huge amount, but it's an at least 1-mile-long overpass, plus road improvements over roughly the remaining 2 miles (total of 63rd to 87th). Plus, it might be an underpass (ka-ching, ka-ching, ventilation and emergency access shafts over 1-mile length, ka-ching). Plus, it's a hairy, complicated site with complicated, continuous, active use, meaning, among other things, long column-free spans if an overpass.

Out of curiosity, excluding the expressways (Edit: er, and Wacker Drive), are there currently any roadway viaducts in the city that are 1 mile long?
.....the "mile Long Bridge" on I294 (Ok---so maybe it is an expressway) !!
Reply With Quote
     
     
  #5559  
Old Posted Aug 10, 2009, 7:44 AM
denizen467 denizen467 is offline
Registered User
 
Join Date: Feb 2006
Location: Chicago
Posts: 3,212
Quote:
Originally Posted by ardecila View Post
It's not like it'll be a tunnel. There's a pinch point of the railyard at Central, so an "underpass" would be more like a trench with a few rail bridges over it. The cost will reflect whether that trench needs retaining walls or can use sloped sides.

Viva, your comparison to the Orange Line seems appropriate. Likely, much of the cost comes from complex construction staging needed to preserve an active railyard.
Indeed there is a pinch point and it lines up with Central Avenue - but it turns out even the widest point of the yard isn't all that wide anyway (maybe a quarter mile rather than a whole mile). And the pinch point isn't absolute, because there are still several tracks, and roadways, going east-west far north of and south of the pinch point, as well as curved north-south rails leading into the pinch point. So a quick underpass would not work. But you're nevertheless most likely right that a trench would be chosen over a tunnel, assuming the RR wasn't feeling too protective about retaining every square foot of its yard. (And if it isn't too protective, then they might not object to occasional column footings either, so that an overpass ends up as the mutually preferred solution.)


But looking at the aerial photos drives one new point home: Between 65th and 79th (excluding the yard), it looks like there is a fair amount of land to be acquired in order to convert it to a 6-lane or 8-lane right of way from a sleepy industrial park-like access road -- the stretch continually has buildings, driveways and/or parking lots of businesses, schools/parks, and residences abutting right up to it. It also intersects another RR line at 75th. All of the intersections would need to be completely redone as main artery intersections, including signaling, turn lanes, maybe modifications to the crossing streets, etc. So that's probably where much of the half-$billion cost comes from.

Initially it's confusing because "Central Avenue Bypass" kind of suggests it's just an "overpass" or "underpass" over an obstacle, namely the everpresent railyard -- but once you notice "bypass" refers to an entire new route through a part of the city, the price maybe starts to make sense.
Reply With Quote
     
     
  #5560  
Old Posted Aug 12, 2009, 12:25 AM
arenn arenn is offline
Registered User
 
Join Date: Nov 2008
Posts: 131
Quote:
Originally Posted by jjk1103 View Post
.....the "mile Long Bridge" on I294 (Ok---so maybe it is an expressway) !!
It's not in the city, but the bridge over the canal and forest preserve on the I-355 extension is longer than the mile long bridge.
__________________
My Urban Affairs Blog: http://www.urbanophile.com/
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 12:04 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.