Wells Wentworth Update (last week)
Most of the pavement is now done; they should be finishing the last bits of sidewalk/street paving soon and then installing street lights, etc. Hopefully they can get trees and landscaping in before the winter cutoff. They also need to put two coats of asphalt down over the concrete paving, and the asphalt batch plants also close soon.
At this point I'm guessing they will wait until spring to open the street, if at all.
Colored pavement at the bike lane: