Salt Lake City & MSA/CSA Rundown


Central Metro - 'The Point' Development

Quote:
Originally Posted by Blah_Amazing View Post

https://www.sltrib.com/news/2022/12/...-central-park/

Updated info/renderings of the first phase of The Point

Interesting snips from that article:

Quote:
The Point’s construction will be some of the densest seen anywhere in Utah, rivaling that of downtown Salt Lake City, according to Abbey Ehman, a spokesperson for Innovation Point Partners, the consortium of development firms teaming up with the state.

Quote:
With Utah in the midst of a dire lack of affordable homes, the plans also call for more than 3,000 multifamily units — all intended as state-owned rentals at this stage.
Up to 20% of those dwellings will be kept more affordable, with a stated intent of creating a new community “for Utahns from all walks and stages of life.”

Quote:
The Point also centers on mixing land uses, with no more than half the acreage devoted to residential and with homes threaded closely with commercial spaces.
She and others said that mixed-use approach — and reliance on two planned transit stations serving The Point on a specially built TRAX extension — are central to The Point’s success.

Quote:
Demolition of the old prison started last month and will stretch well into next year. After installation of critical utilities for The Point, vertical construction could begin as early as 2026, although officials say that will be flexible and driven by market conditions.



















Last edited by delts145; Jun 20, 2023 at 12:25 PM.
Reply With Quote
     
     
  #7942  
Old Posted Feb 2, 2023, 3:05 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Downtown Update, The Depot District - The Cinq Project Enthusiastically Approved By Planning Commission


Copy by Luke Garrott @ https://www.buildingsaltlake.com/dep...-neighborhood/

The stage is set in the Depot District for the CINQ, dbUrban and Dwell Design Studio’s seven-story, 203 unit market-rate project at 530 West 200 South.
...The Cinq will make a major statement on a key block in the Depot District, Salt Lake City’s Old Greektown. Its two buildings (plus the warehouse) will take up half the block
between 500 and 600 West, and incorporate the historically-registered 1929 Central Warehouse.



Notice the setback of taller structures that help highlight the historic Central Warehouse. Rendering courtesy Dwell Design Studio.



The CINQ site, 200 South and TRAX, bottom. Central Warehouse, center. Left-center, Casa Milagros senior housing. Alta Gateway/Gateway 606, large white building, center-right. Photo by Luke Garrott.



The project will have 2600 sf of ground-floor retail on the corner of 500 West and 200 South. Image courtesy Dwell Design Studio.

On the ground floor of the new buildings will be townhomes on 500 West, 2600 sf of retail on the corner of 500 West and 200 South, a leasing office and live-work units (3000 sf) on 200 South.
The developers expressed that “it was paramount to not only embrace the existing Central Warehouse building, but to highlight it through the rest of the project orientation and design.”
Indeed, the new buildings adjacent to the warehouse are set back from the sidewalk to amplify the presence of the historic structure.



February 22, 2021

Photo By Atlas


October 27, 2021

Site demolition complete

Photo By Atlas


February 16, 2022




Photos By Bob Rulz



March 21, 2022


Photo By Luke Garrott @ BuildingSaltLake.com


August 9, 2022


Photo By Paniolo Man



August 23, 2022


Photo By Luke Garrott @ BuildingSaltLake.com


January 26, 2023





Historic Central Warehouse facade, being incorporated into CINQ. Photo by Luke Garrott.

Photos By Luke Garrott @ BuildingSaltLake.com https://buildingsaltlake.com/in-pict...strict-update/

.

Last edited by delts145; Apr 8, 2023 at 1:51 PM.
Reply With Quote
     
     
  #7943  
Old Posted Feb 3, 2023, 3:38 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Downtown Update - Astra Watch Timeline



...This construction project will bring what has been billed as the state’s tallest tower thus far, adding hundreds of high-end luxury rental apartments in the Downtown core.

At approx. 448 feet, the Astra Tower would inject 380 units into the core of Downtown, across from the Gallivan Center. It is one of over a dozen new high-rise projects in various stages of the development pipeline and or construction in the downtown area.





















Astra Site - April 25, 2021

Photo By Atlas


Goodbye Carl's Jr. - Astra Site - April 26th

Webcam



Official Groundbreaking Ceremony - January 12, 2022


Quote:
Originally Posted by Reeder113 View Post
Some pics of the Astra groundbreaking yesterday from KSL:



Our own forum member in on the action! (Schmoe, At Center In Navy Blue Jacket)








https://www.ksl.com/article/50326967...lest-building-


February 6, 2022

Quote:
Originally Posted by Paniolo Man View Post
Took some photos today while attending to some business in downtown.

...And Astra, because we all can't get enough of them drilling holes in the ground.

Photo By Paniolo Man



February 26, 2022


Photo By Paniolo Man



March 15th - Oopsie Daisy!!


Coring Drill Takes A Spill

The Salt Lake Tribune - Massive drilling rig collapses in downtown Salt Lake City, injuring man and crushing 2 cars - https://www.sltrib.com/news/2022/03/...tuction-crane/


Last Evening of March 15th

Quote:
Originally Posted by Comrade View Post




March 25, 2022

New drill on the Astra site!!

Photo By Reeder113


May 17th

Quote:
Originally Posted by Schmoe View Post
We started installation of the tower crane at Astra Tower today.



May 18th

Quote:
Originally Posted by mstar View Post
Has anyone heard any updates as to when they are going to start the cement pours on the Astra? I thought they were going to start last week.

Quote:
Originally Posted by dakben View Post
Looks like it's starting now.



June 1st


Tower Crane going up

Posted By Dakben



July 5th

Astra. Today. Finally starting to see the shape of this thing come together.

Posted By Reeder113



July 18th


As Posted By Paniolo Man from - - KUTV has a new photo gallery of Astra work.



October 19, 2022




Photos By U/Taboubak



November 1, 2022


Photos as posted by Reeder113


November 11, 2022

Quote:
Originally Posted by Paniolo Man View Post

I tried to nab some more interesting pictures of Astra this time.


Here is the view in to where I believe the lobby will be.


Lower level of the parking area.


It was interesting to watch workers finishing the tensioned cables that allow them to have such thin slabs between floors.

[/B]
Photos By Paniolo Man



December 21, 2022


Photo Posted By Boz



January 1, 2023






WalkSLC shared some cool shots of Astra



January 4, 2023

Quote:
Originally Posted by dakben View Post

More façade work on Astra


Photo By Dakben


January 21, 2023


Quote:
Originally Posted by BretUtah View Post
Here is a pic of the Astra from the 18th floor of the Regent.
Photos By BretUtah



January 23, 2023


Pic credited to u/UT_Dave on the subreddit https://www.reddit.com/r/Development...90r/astra_123/



February 1, 2023






Photos By Luke Garrott @ BuildingSaltLake.com https://buildingsaltlake.com/in-pict...uction-update/


.

Last edited by delts145; Feb 11, 2023 at 5:33 PM.
Reply With Quote
     
     
  #7944  
Old Posted Feb 3, 2023, 4:18 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Downtown Update, The Rio Project - Depot District


Location: 210 S. Rio Grande St, Salt Lake City, UT - Unit Count: 210 Units

Building Type: 7 floors, 5 stories of residential units over 2 stories of parking podium
Included Amenities: Clubroom, Fitness Center, Pool, Hot Tub, Bike and Gear Storage and repair, Rooftop Decks, and BBQ and outdoor/indoor gathering space
Progress: Construction begins Fall 2021! Projected finish Q3 2023.








March 21, 2022




Photos By Luke Garrott of BuildingSaltLake.com




August 23, 2022



Photo By Luke Garrott @ BuildingSaltLake.com




January 26,2023






Photos By Luke Garrott @ BuildingSaltLake.com https://buildingsaltlake.com/in-pict...strict-update/

.

Last edited by delts145; Apr 10, 2023 at 11:50 PM.
Reply With Quote
     
     
  #7945  
Old Posted Feb 4, 2023, 2:29 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Quote:
Originally Posted by Comrade View Post
I thought this was a cool photo of a new storage place on 600 West...

.
Reply With Quote
     
     
  #7946  
Old Posted Feb 4, 2023, 4:47 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Updates - The Alta Terra Project - Sugar House District - Under Construction


Update: https://www.sugarhousecouncil.org/co...tion-projects/
This two-part project is now under construction with foundations completed, and the structure is rapidly taking shape on the south site. The north site has now been fully excavated and will soon begin installing foundations. Vehicle/pedestrian access is currently restricted to the east end of Ashton Ave. The sidewalk along the frontage of the south side property will be closed for safety due to the heavy truck and machinery traffic entering and leaving the project and adjacent staging area.


Taylor Anderson Reports:10-story building approved in Sugar House - Full Article @ BuildingSaltLake:
https://www.buildingsaltlake.com/10-...EMAIL_CAMPAIGN)


Quote:
January 27,2022, Taylor Anderson for BuildingSaltLake.com - The Planning Commission approved the second in a pair of buildings coming to the southern end of the Sugar House urban core.

The commission approved the Alta Terra building, which will continue the buildout of what is known formally as the neighborhood’s business district, but which should be recognized as the area with the densest housing outside Downtown.

Alta Terra would bring 228 homes in a 10-story building at 1121 East Ashton, immediately east of Fairmont Park. The building will include space for retail in its ground floor, and the building will top 100 feet total.

Its sibling will be built across Ashton, bringing another 118 homes in a 94-foot building on what had been a vacant surface parking lot. That project was separated for administrative reasons and has already been approved.

In all, the pair will bring 346 new homes of various sizes to the neighborhood, which has nearly 2,000 apartments under construction or very recently completed.
Note: The Alta Terra will be replacing a parking lot and single-story structures, including a large 24-Hour Fitness Gym.

















Project Site


Site Plan


North Building Elevations & Landscape Plan


South Building Elevations & Landscape Plan



September 27, 2022

Alta Terra North building - the 24 hour fitness now fully demolished

Photo By Blah_Amazing



January 26, 2023

Quote:
Originally Posted by Paniolo Man View Post

Snow and clouds don't make for the best photography, but there is progress on the south (closer to I80)structure.





Photos By Paniolo Man

.

Last edited by delts145; Jun 20, 2023 at 12:45 PM.
Reply With Quote
     
     
  #7947  
Old Posted Feb 5, 2023, 2:32 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Downtown Update, Alta Depot Apartments - Depot District


Luke Garrott Reports - Full Article @ https://buildingsaltlake.com/depot-d...rking-maximum/


The residential explosion in Salt Lake City’s Depot district continues, with a 288-unit market-rate rental project at 100 South and 600 West...At 565 West 100 South, Alta Depot’s four stories will sit on 3.39 acres, currently a vacant lot (just to the north of Casa Milagros at Centro Civico Mexicano) and a large garage.

Those 288 units are broken down into 46 “urban 1-bedroom,” 157 1-bdrm, 72 2-bdrm, and 13 3-bdrm market-rate habitations...






May 25, 2020


The architects have fully wrapped the four levels of parking with residential units, and boast that “almost every residential unit…will have its own private outdoor patio or balcony.” Also, the units at Alta Depot will feature industrial accents, stainless steel appliances, washer and dryer sets, and full-tile bathtub surrounds. Amenities include a club room, a resort-style pool and lounge area, an outdoor fireplace, and an outdoor kitchen area.


As required by the zoning, the project will provide a segment of an east-west midblock walkway, as well as a north-south fire access alley. Aerial rendering from the east, showing the fire alley and the midblock walkway, which cuts under the building. Courtesy Studio PBA.



Midblock walkway looking west, courtesy Studio PBA.




February 16, 2022

Demo work of garage and site prep nearing completion



Photos By Bob Rulz




January 26, 2023


Photo By Luke Garrott @ BuildingSaltLake.com - https://buildingsaltlake.com/in-pict...strict-update/



January 29, 2023


Photo By Paniolo Man

.

Last edited by delts145; Apr 14, 2023 at 11:03 PM.
Reply With Quote
     
     
  #7948  
Old Posted Feb 6, 2023, 1:43 AM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Central Station Apartments - Depot District - Completed


Central Station is a new 65 unit affordable apartment community located at 2nd South and 5th West in Salt Lake City.
Future residents will be able to choose from studio, one, two, three and four-bedroom apartments.


The 65 new rental units will ensure that, as the Depot District rapidly develops,
it will include at least some affordable housing. Rendering courtesy of Salt Lake City Planning Division.




December 2020


January 7, 2021


The Central Station East project seems to be framed out. From the NE on 200 South. Photo by Luke Garrott.


Central Station East from the NW, on 200 South. Hong Kong Teahouse, right-center.

Photos by Luke Garrott of BuildingSaltLake.com



May 29, 2021

Photo By SLC PopPunk


November 2021




https://www.kier.org/wp-content/uplo...021-0798-E.jpg



Completed























.

Last edited by delts145; Feb 8, 2023 at 8:47 PM.
Reply With Quote
     
     
  #7949  
Old Posted Feb 6, 2023, 7:56 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Update, Downtown Southwest - Central Ninth District - Row Home density development continues


Taylor Anderson Reports - Full Article @ https://www.buildingsaltlake.com/bui...al-scale-zone/

Builders plan for new rowhomes in Central 9th’s residential-scale zone: The urban enclave known as Central 9th would get four new single-family homes under a proposal that would continue the quick and ongoing build-out of the transit-rich area southwest of Downtown.

Three of the new homes in Jefferson Court would be attached, built in a two-story row-home style. Another detached home would be added, and an existing historic home at 850 S. Jefferson would be renovated and preserved.

This is the type of project envisioned by the smaller-scale of the two form-based codes created for the area, along Jefferson and Washington streets. Instead of one house with a large yard surrounded by transit and mixed-uses, the 0.2-acre parcel would now become home to perhaps five families.

It’s also not the first of its kind. Several other properties nearby contain multiple high-end attached homes on similar properties in the area...





Jefferson Court would include three attached homes behind a new and an existing home on Jefferson Street in Salt Lake City’s Central 9th neighborhood. Rendering by Northstar Builders.



January 10, 2023


Jefferson Court (from the back)

Photo By Blah_Amazing

.

Last edited by delts145; Jun 30, 2023 at 12:11 PM.
Reply With Quote
     
     
  #7950  
Old Posted Feb 6, 2023, 8:31 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Quote:
Originally Posted by Atlas View Post
More great downtown aerials by
Scott Taylor:



Photos By Scott Taylor


.
Reply With Quote
     
     
  #7951  
Old Posted Feb 7, 2023, 3:10 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Downtown Update - The Worthington Tower Watch Timeline

Taylor Andersen Reporting - Full Article @
https://www.buildingsaltlake.com/sal...ne-on-the-way/

...The tower that will replace the existing Broadway Place will be 31 stories tall. It will bring 359 residential units to the area on 26 of the 31 stories, leaving 5,800 square feet of space for ground-floor retail and 359 parking stalls on four stories above ground...

...The Worthington Tower “builds on the vision of community leaders who developed the goals of programs like ‘Downtown Rising’ and is one step forward in ensuring Salt Lake City remains the primary cultural, financial, legal and government center of Utah,” Matt Lusty, a representative of the group, told Building Salt Lake on Wednesday.

It will continue two ongoing trends Downtown: new, skyline-altering skyscrapers, and an impending swell of people living in the city center...



The new tower on the northeast corner of 300 South 200 East will replace a
one-story building and local retailers with a 31-story residential building. Rendering courtesy of Worthington.






October 14, 2021


Quote:
Originally Posted by Reeder113 View Post

Demolition of Mortuary and the Tavernacle Social Club. From the subreddit - they’re clearing the way for the Worthington tower:




Looks like demo started on the yellow Broadway building. Rode past there about 30 minutes ago and 1/3 of the building was in rubble.

Photo By SLCPopPunk

https://www.reddit.com/r/Development...tm_name=iossmf


October 24th


Quote:
Originally Posted by Atlas View Post
Demolition is complete and site work is underway. This image is from a bit over week ago:



January 14, 2022


https://www.reddit.com/r/Development...onvexity_site/
Photo By Taboubak

Here's the context of where it will be in the skyline, courtesy of Blah_Amazing:





February 15, 2022

Quote:
Originally Posted by Atlas View Post
Alright alright alright! Also, based on the citizen portal entry for the project that has been updated as of 2/9, it looks like their building permit was probably issued!





March 21, 2022


Photo By Luke Garrott @ BuildingSaltLake.com



March 28, 2022


Photo posted this week (from Reddit). https://www.reddit.com/r/Development...week_of_32822/



June 3rd and 13th, 2022




As Posted By Reeder113



June 20th, 2022




As Posted By Reeder113 - Original picture by u/HossTR18 on reddit:
https://www.reddit.com/r/Development...n_week_of_620/




July 16, 2022

Quote:
Originally Posted by Paniolo Man View Post
A continuous pour of15 million pounds of concrete took place overnight on July 16th. (Photo: Tom Chamberlain, KUTV)







Photos By Tom Chamberlain, KUTV



August 8, 2022


Photo By u/HossTR @ Reddit - https://www.reddit.com/r/Development...QidwEAAA%3D%3D



October 10, 2022




Photo By u/HossTR @ Reddit - https://www.reddit.com/r/Development...QidwEAAA%3D%3D



October 18, 2022

Quote:
Originally Posted by Reeder113 View Post
Worthington at night. Original post by u/HossTR on reddit.
https://www.reddit.com/r/Development..._week_of_1017/



Photo By u/HossTR on reddit



November 15, 2022

https://www.reddit.com/r/Development...eek_of_111422/


Photo By u/HossTR on reddit



January 16, 2023


Photo By Paniolo Man



January 26, 2023

Quote:
Originally Posted by Reeder113 View Post

Worthington (credit to u/UT_Dave on the subreddit)

https://www.reddit.com/r/Development...bonus_3rd_ave/



Photos By u/UT_Dave

.

Last edited by delts145; Feb 13, 2023 at 1:30 AM.
Reply With Quote
     
     
  #7952  
Old Posted Feb 8, 2023, 2:16 AM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Downtown West Update, Central Station West - Depot District


Central West is a new 65 unit affordable apartment community located at 2nd South and 6th West in Salt Lake City.
Future residents will be able to choose from studio, one, two, three and four-bedroom apartments.





January 2022

Photos By Kier Construction @ https://www.kier.org/our-work/multi-...ro-apartments/







January/February 2022







March 2022





May 2022











June/July 2022




Photos By Kier Construction @ https://www.kier.org/our-work/multi-...ro-apartments/



October 28, 2022


Photo By Paniolo Man




January 26, 2023

Central Station West (right) and Central Station (left) with Hong Kong Tea House (center) on 200 South. Photo by Luke Garrott.




Photos By Luke Garrott @ BuildingSaltLake.com - https://buildingsaltlake.com/in-pict...strict-update/

.

Last edited by delts145; Feb 8, 2023 at 8:49 PM.
Reply With Quote
     
     
  #7953  
Old Posted Feb 8, 2023, 4:23 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Update, Downtown West - The Greenprint - Depot District



Taylor Anderson Reporting - Full Article @ https://www.buildingsaltlake.com/in-...west-downtown/

The Greenprint Gateway brings a new six-story building with 150 micro and studio apartments for rent on the northeast corner of 200 S. + 600 W. It includes ground-floor retail or office space and is oriented toward 200 South.

It replaces a parking lot and car repair shop.

That’s a density of 254 units per acre within a very short walk of a TRAX and FrontRunner station. (The project would include 38 parking stalls, 19 surface and accessed off 600 West and 19 within the podium structure.)

“Given its proximity to the Old Greek Town Trax Station and the Gateway commercial development, we believe that this design will not only meet the City’s vision for this district but will also enhance the area by adding a walkable,
transit-oriented, multi-family option for City residents,” the developer wrote.

The project is now under construction.



The Greenprint Gateway would bring 150 micro and studio apartments for rent at the northeast corner of 200 S. 600 W. in Salt Lake City’s Depot District. Rendering courtesy of Salt Lake City Planning Division.


August/September 2021







Photos Courtesy of Kier Construction @ https://www.kier.org/our-work/multi-...y-micro-units/ - November 2021







January/February 2022






Photos Courtesy of Kier Construction @ https://www.kier.org/our-work/multi-...y-micro-units/



February 26, 2022


Photo By Paniolo Man



March 21, 2022

Note: 'Greenprint Gateway' lower left, 'The Cing' lower right, and 'Gateway North' upper center.

Note: Immediately south accross the street from 'Greenprint Gateway' is the under construction 'Central Station West' , not to be confused with its newly finished neighbor on the right 'Central Station'. It's pretty common these days for the downtown area of Salt Lake City to have numerous multi-unit residential projects under construction at the same time, all within the confines of the same block and adj. blocks. This is especially true where mass transit tracks are within easy reach.

Photos By Luke Garrott @ BuildingSaltLake.com



March, 2022









June/July 2022




Photos By Kier Construction @ https://www.kier.org/our-work/multi-...y-micro-units/



August 23, 2022


Photo By Luke Garrott @ BuildingSaltLake.com


January 26, 2023


Photo By Luke Garrott @ BuildingSaltLake.com - https://buildingsaltlake.com/in-pict...strict-update/

.

Last edited by delts145; Feb 8, 2023 at 8:50 PM.
Reply With Quote
     
     
  #7954  
Old Posted Feb 9, 2023, 4:05 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
East Bench - University of Utah - William Stewart Building for Applied Sciences - Construction Underway

Quote:
This project is important to the University and will provide new and updated space to serve the University of Utah’s educational and research mission. It will serve as the new home for the Departments of Physics & Astronomy and Atmospheric Sciences, focusing on aerospace, semiconductor technology, biotechnology, data science, hazardous weather forecasting, and air quality. Together, the two departments teach more than 5,600 students.

New construction will provide a 56 percent increase in experimental and computer lab capacity. There will be 40,700 square feet of renovated space in the historic Stewart Building and a 100,00 square foot new addition.

As Originally Posted By Atlas

.

Last edited by delts145; Feb 9, 2023 at 4:23 PM.
Reply With Quote
     
     
  #7955  
Old Posted Feb 9, 2023, 4:20 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Downtown, University of Utah Extension - Stena Center For Financial Technology - Announced Today

Quote:
The university, in partnership with the Stena Foundation and founders Steve and Jana Smith, will create the Stena Center for Financial Technology. The foundation has orchestrated total funds of up to $65 million over the next 10 years to support the center, including industry-sponsored labs, a start-up incubator, venture funds and fintech-focused degrees and certificates. Reinvestments from the venture funds are ultimately expected to fund the center in perpetuity.


As Originally Posted By Atlas

.

.
Reply With Quote
     
     
  #7956  
Old Posted Feb 9, 2023, 5:12 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Southern Metro - Update, Utah Valley University - Woodbury School of Business,
Scott Keller Building - Completed January of 2022


UVU breaks ground on the future home of Woodbury School of Business

A backhoe and an earthmover are ready to turn ground for the new Scott C. Keller Building at Utah Valley University... The $75 million, 180,000-square-foot building will be the new home of the Woodbury School of Business. UVU


The $75 million, 180,000-square-foot building will house 30 classrooms and 205 offices as well as the Bloomberg Lab, Entrepreneurship Institute, Money Management Resource Center, SmartLab and grand auditorium for large lecture audiences and special events. Construction is estimated to be completed by late fall 2021 or early 2022.

The building will feature a Student Success Center on its second floor, which will combine placement, tutoring, internships and advisement services in one accessible location.

Classrooms will be outfitted with lecture-capture technology to help students learn remotely. The building will be constructed on the south end of UVU’s Orem campus...The new building is expected to serve up to 12,000 business students at a time.

According to Utah State Board of Regents documents, the business school has outgrown its current home, which was one of the four original Utah Technical College buildings built in 1979.

“While the 78,000-square-foot facility has been well-maintained over the years, it cannot accommodate the renovations desired to train future business leaders. The masonry building has a post-tensioned cable floor system that cannot be penetrated to run cables or make infrastructure upgrades,” the document states...



August 2020



https://www.heraldextra.com/









Completed - 2022














.

Last edited by delts145; Feb 9, 2023 at 5:25 PM.
Reply With Quote
     
     
  #7957  
Old Posted Feb 10, 2023, 2:22 AM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Quote:
Originally Posted by WalkSLC View Post


Astra, 255 State, and Worthington 1/28/23:
Video Link


.
Reply With Quote
     
     
  #7958  
Old Posted Feb 10, 2023, 5:56 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Update, Lotus Zeppelin Apt.'s on the S-Line - Sugar House District



- Start Date: Early summer 2023.
- Update: Demolition of the old structures on site is completed and construction is set to begin mid-summer.
- Est. Completion: Mid2024.
- Project Description: Mixed use residential.
- Location: 2100 S./800-900 E.




Taylor Anderson Reporting
- Full Article @ https://buildingsaltlake.com/sugar-h...ew-apartments/

...Lotus Zeppelin — from studios to three-bedroom units — would offer housing in a very walkable and bikeable neighborhood. Parleys Trail runs adjacent to the S-Line of TRAX, providing three direct links into Sugar House and other parts of the valley.

“This project offers micro units that include all the features available in a 1 bedroom living space,” the Lotus representative wrote in an email. “These micro units have a special emphasis on built ins, large windows and doors that provide ample light and make small living feel greater as well as kitchens that use 2/3rd sized appliances including a dishwasher, range, oven, and microwave.”

The Lotus Company has been active in increasing its residential presence in the city. Their Downtown projects include Lotus South Temple and currently under construction, Lotus Republic on 300 East. They are also responsible for the Blue Koi homes at 1700 South 900 East...


.

Last edited by delts145; Jul 26, 2023 at 12:50 PM.
Reply With Quote
     
     
  #7959  
Old Posted Feb 10, 2023, 6:15 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Moved Forward to Next Page

Update, The "SUGAR HOUSE" Development - Sugar House District


Quote:
Originally Posted by Blah_Amazing View Post
https://citizenportal.slcgov.com/Cit...howInspection=

Address: 2157 S Lincoln Street

The Basics: 1.94 acres. 6 floors, 238 residential units, 239 parking spaces, and the preservation of an existing Victorian house.

Project Narrative (From Developer): The SUGAR HOUSE development, located on a 1.94 acre parcel in Salt Lake City, includes the design and development of approximately 238 Market Rate Apartments of Type IIIA, wood framed construction wrapping a mechanically-ventilated cast in place concrete parking structure with approximately 239 parking spaces and over 10,000 SF of activated ground floor use including leasing, office, and amenity spaces. Unit designs will include a total of 17 base unit types with required variations based on skin condition. A natural building material selection was made to help integrate the development into the existing surrounding fabric, and to continue to promote the objectives of health, wellness, and outdoors. Units will have high end finishes along with precise attention to detail to help cater to the outdoor and wellness enthusiasts. The development will have an inviting and elegant leasing lobby that directly flows into the clubroom amenity space that encourages it’s patrons to enjoy the offerings of the development. Adjacent to the clubroom is a spacious and well equipped gear room that the tenants can maintain and store their outdoor gear with ease before they embark on an adventure and when they return. Above the podium level is a spacious and optimally equipped fitness center with amazing views of the Wasatch mountains to the East. With a main focus of the project being health, wellness, and outdoor activity driven, the fitness center has large floor to ceiling doors that open up to further make the connection to the outdoors and fresh air. Directly adjacent to the fitness center is a large and tranquil courtyard deck that allows gathering of any kind or smaller nooks for seclusion and relaxation. If you find yourself not getting enough of the views to the Wasatch mountains there is a sixth (6th) floor sky deck that provides indoor and outdoors gathering spaces and high elevation views over the Sugar House neighborhood and Salt Lake valley. The pool courtyard will be on grade, and provide for a relaxing and perfect way to end a long day outside and in nature. The pool deck will also be accompanied with a cold plunge, hot tub and sauna. To promote wellness, this unique project is also fortunate enough to preserve and re-use the Victorian home on site in order to help promote the existing connection to the residential neighbors to the South while also honoring the rich history the house has to offer for the Sugar House community and it’s future patrons.


Project Renderings and Images:











Floor Plans & Building Sections:

Last edited by delts145; Jul 21, 2023 at 11:20 PM.
Reply With Quote
     
     
  #7960  
Old Posted Feb 11, 2023, 5:04 PM
delts145's Avatar
delts145 delts145 is online now
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,384
Parting Shot

Wasatch Metroscape


.

Last edited by delts145; Apr 14, 2023 at 1:57 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 9:00 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.