HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Sep 17, 2021, 1:40 PM
jmecklenborg jmecklenborg is offline
Registered User
 
Join Date: Jul 2003
Posts: 3,180
Quote:
Originally Posted by nito View Post
Not to add fuel to the fire, but the longer construction time for CHSR relative to HS2 (Phase 1) is curious when you consider that HS2 involves 51km of dual-bore tunnel and significant station works in the centre of London and Birmingham.
The combined length of the two major CAHSR tunnels will total roughly 30 miles, so a similar length.

The approach tunnel to Transbay Terminal will be about 2 miles long but will a project of similar complexity to any in London.

Newsom kept his job so my thought is that he and the legislature could easily fund this project without bringing out the HSR boo-birds. Same with construction of HSR between San Jose and Gilroy - it could be used by electrified Caltrains right away.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 6:09 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.