Just to clear the air... they are the concrete finishing sub only. With regards to the concrete structure, the GC piecemealed the work out. There are multiple companies performing each part of the concrete work.
The company I work for is performing all the formwork.
Quote:
Originally Posted by theOGalexd
This building is going up FAST.
|
Quote:
Originally Posted by CWalk99
Yeah that's something I've also been trying to calculate and it does look like all of the residential floors have each only taken about 7-10 days so far. Since they technically only have 20 floors left to fully work on, I do think it could top out in 4-6 months assuming that pace is kept. I don't think holidays and weather changes will slow it down too much either
|
I can shed a little light on this...the schedule is a 7-day turn-around on each residential floor up until 26, then it goes to a 5-day turn-around. So it's moving. Based on my current schedule, the last concrete deck pour should on or about June 12th (assuming there are no more weather, etc. delays). It was originally going to be faster, but you can't get concrete delivered on Saturdays anymore.