HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals


Reply

 
Thread Tools Display Modes
     
     
     
     
  #1  
Old Posted Jul 10, 2019, 12:23 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 669
MINNEAPOLIS | Fire Station One | 246 FT | 22 Floors

Project occupying about 2/3rds of the block bound by Washington, Portland, 3rd St, and 5th Ave. Essentially consists of four interconnected buildings: a 22-floor apartment tower with ground floor retail, a 6-floor parking ramp, a 2-floor fire station, and a 6-floor apartment building that wraps the parking ramp on three sides and extends out over the fire station.

This project is pretty complicated financially, is it relies on a lot of different funding sources-- federal credits for the affordable housing, city TIF for the affordable housing, city capital for the fire station, as well as private capital of course. It's also going to be pretty complicated to build, as the new fire station needs to be operational before the old one at the other end of the site can be demolished. This project has not yet been approved, but the TIF approval is making its way through (http://www.ci.minneapolis.mn.us/www/...msp-219649.pdf).

Images from September 2018 proposal (http://www.ci.minneapolis.mn.us/www/...msp-214024.pdf
).

















Reply With Quote
     
     
  #2  
Old Posted Jan 31, 2020, 4:09 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 669
Reply With Quote
     
     
  #3  
Old Posted Jan 30, 2021, 2:14 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 669
Updated plans approved this week. Now 21 floors, 226'.

https://lims.minneapolismn.gov/downl...20S%203rd%20St













Reply With Quote
     
     
  #4  
Old Posted Sep 6, 2021, 1:02 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 669
Today.



Reply With Quote
     
     
  #5  
Old Posted Feb 4, 2022, 4:34 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 669
Today.

Reply With Quote
     
     
  #6  
Old Posted May 25, 2022, 4:10 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 669
Today.

Drill rig, vibratory pile driver, 3x excavators. H piles, sheet piles, caisson sleeves all on site too!

Reply With Quote
     
     
  #7  
Old Posted Jul 2, 2022, 7:09 PM
kenratboy kenratboy is offline
Registered User
 
Join Date: Nov 2003
Location: Minneapolis, MN
Posts: 1,085
Nice. Can't believe how many apartments/condos are in the area between 35W and downtown.
Reply With Quote
     
     
  #8  
Old Posted Jul 3, 2022, 3:10 AM
Drcastro Drcastro is offline
Registered User
 
Join Date: Apr 2020
Location: SW Mpls
Posts: 370
Does this project have a better name now? I see the doc from January 2021 calls it 240 Portland, or “Portland and Washington mixed use”.
Reply With Quote
     
     
  #9  
Old Posted Sep 1, 2022, 4:11 AM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 669
Today.

New fire station operational, old fire station gone.





Reply With Quote
     
     
  #10  
Old Posted Yesterday, 3:53 PM
MPLS_Const_Watch MPLS_Const_Watch is offline
Registered User
 
Join Date: Mar 2018
Posts: 669
Yesterday.



Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 7:34 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2022, vBulletin Solutions, Inc.