random updates...
on block 13E, it's rebar time (looking south with Fourth St in the background):
working our way south, next door at block 5, the brief pause after pile-driving finished seems to be over, with activity starting onsite again (looking north. protective scaffolding has been erected over the sidewalk along Fourth, on the right):
continuing south, the basin for China Basin St west of Fourth has been newly excavated (and looks like plowed under):
compare this photo from Nov 18:
at the UCSF parking garage they're re-installing the panels they had taken down a few years ago, with the north side done...
and over at the public safety building, the steel for the surface-level portion of the building along Third has popped up (seen on the left here, looking north):
and looking south: