  #21  
Old Posted Feb 6, 2014, 10:45 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Deepstar View Post
Making good progress on Tower II, Tower I is taking a long time.
Construction is always get harder to do in deep winter. No doubt they had wanted to be 'buttoned up' by October / November to concentrate on the interior work during the winter, but as usual the schedule slipped.

When they can do the exterior work without all the extra layers of clothing, it will get back to normal speed.

Last edited by jsbertram; Feb 7, 2014 at 2:33 AM.
Reply With Quote
     
     
  #22  
Old Posted Mar 19, 2014, 11:41 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Tower 1 is completing the exterior and installing interior, tower 2 is topped out and installing the exterior, tower 3 has the first concrete forms coming out of the ground.



The Groves by Chadillaccc, on Flickr
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #23  
Old Posted Mar 20, 2014, 5:27 AM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by Chadillaccc View Post
Tower 1 is completing the exterior and installing interior, tower 2 is topped out and installing the exterior, tower 3 has the first concrete forms coming out of the ground.



The Groves by Chadillaccc, on Flickr
The entire parkade is being built, but the third tower won't start until tower 1 is complete, which is a ways off yet.
Reply With Quote
     
     
  #24  
Old Posted Mar 20, 2014, 1:34 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
But they already have forms up for the walls.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #25  
Old Posted Mar 20, 2014, 2:28 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by Chadillaccc View Post
But they already have forms up for the walls.
At parkade level only, I believe.
Reply With Quote
     
     
  #26  
Old Posted Mar 20, 2014, 2:29 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Are those forms up in the picture?
Reply With Quote
     
     
  #27  
Old Posted Apr 9, 2014, 4:53 PM
Azrie Azrie is offline
Registered User
 
Join Date: Feb 2014
Posts: 3
Anyone have any updates about this project or know where I could find out more info on projected completion, pricing, or more info in general? I'm interested in these but the developer site really doesn't have much information other that floor plans and some general area information.
Reply With Quote
     
     
  #28  
Old Posted Apr 9, 2014, 5:04 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Towers 1 and 2 are topped out, the foundation (parkade) of the entire 5-building complex is nearly complete, tower 3 has rebar above ground, awaiting the first concrete pour of the tower section. Don't know much else, but it's moving along well.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #29  
Old Posted Apr 9, 2014, 7:27 PM
Surrealplaces's Avatar
Surrealplaces Surrealplaces is offline
Editor
 
Join Date: Feb 2006
Location: Cowtropolis
Posts: 19,968
Reply With Quote
     
     
  #30  
Old Posted Apr 9, 2014, 9:42 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by Azrie View Post
Anyone have any updates about this project or know where I could find out more info on projected completion, pricing, or more info in general? I'm interested in these but the developer site really doesn't have much information other that floor plans and some general area information.
Www.grovesofvarsity.com
403-286-8143

Phase 1 moves in in June/July I think, and phase two is probably January.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 8:11 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.