HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


 

 
Thread Tools Display Modes
     
     
  #201  
Old Posted Sep 15, 2017, 1:53 PM
bgsrand bgsrand is offline
Registered User
 
Join Date: May 2017
Location: Chicago
Posts: 192
Is that steel work in the first picture essentially forms for the caisson rigs since they are on the river bank's slope?
     
     
  #202  
Old Posted Sep 15, 2017, 4:47 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 14,989
Quote:
Originally Posted by bgsrand View Post
Is that steel work in the first picture essentially forms for the caisson rigs since they are on the river bank's slope?
Yes

Apparently for the drivers (vibtrators) not the drillers (the last of which was being packed up today).

I can hear the vibrator putting the sheet piles from my office - on Clark .
__________________
Harry C - Urbanize Chicago- My Flickr stream HRC_OakPark
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.

Last edited by harryc; Sep 15, 2017 at 5:30 PM.
     
     
  #203  
Old Posted Sep 15, 2017, 5:35 PM
gebs's Avatar
gebs gebs is offline
Registered User
 
Join Date: Jan 2017
Location: South Loop
Posts: 790
From River Point Tower, 9.15.2017

     
     
  #204  
Old Posted Sep 15, 2017, 6:15 PM
bgsrand bgsrand is offline
Registered User
 
Join Date: May 2017
Location: Chicago
Posts: 192
Quote:
Originally Posted by gebs View Post
From River Point Tower, 9.15.2017

WPW, so handsome...are you going to have this view throughout WPE construction? (please say yes...)
     
     
  #205  
Old Posted Sep 16, 2017, 2:30 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 14,989
Sept 15

Vibrating the sheep pile to drive it in - I can hear this in my office on Clark (4 blocks down the river)


The guide is nailed down by the 2 smaller tubes (in back) which appear to be weleded in place. The 3 openings then have the larger tubes vibrated and pounded in.





Tubes that will be vibrated in, then pounded the last bit ?


the business end of the pounder.


not sure what the caps are for - would fit the big tubes


More pieces - cut up form - I guess they are custom built on each site.




Our friends from Wisconsin.
__________________
Harry C - Urbanize Chicago- My Flickr stream HRC_OakPark
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
     
     
  #206  
Old Posted Sep 19, 2017, 6:08 PM
gebs's Avatar
gebs gebs is offline
Registered User
 
Join Date: Jan 2017
Location: South Loop
Posts: 790
Quote:
Originally Posted by bgsrand View Post
WPW, so handsome...are you going to have this view throughout WPE construction? (please say yes...)
Sadly, no. I was at a client site, and I will have no need to visit them during construction.
     
     
  #207  
Old Posted Sep 20, 2017, 4:00 AM
SolarWind's Avatar
SolarWind SolarWind is offline
Chicago
 
Join Date: Jun 2006
Posts: 5,476
September 18, 2017







     
     
  #208  
Old Posted Sep 20, 2017, 5:15 AM
LaSalle.St.Station's Avatar
LaSalle.St.Station LaSalle.St.Station is offline
Registered User
 
Join Date: Jul 2007
Posts: 335
Quote:
Originally Posted by gebs View Post
From River Point Tower, 9.15.2017

Ahh, without Burton Natarus, half of that background shot doesn't exist.
     
     
  #209  
Old Posted Sep 29, 2017, 11:06 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 14,989
Sometimes you just need a little room to work ....

I think I have figured out what the poles and frames are all about. CASE put in the permanent foundation work, but now Walsh needs some temporary work space ... so they build their own.

Sept 22



Sept 28

Adjusting it ... one end would be lifted slightly and a small crane would tug or push it a bit.




Sept 29

Taking shape


Patching the home-made double beam that has obviously seen use before.


We don't need WD-40 !
The cross members are also re-purposed beams
note how they are welded to the double beams that sit on the capstans on the pounded round pipes.


Finally satisfied with the positioning - welding it to the capstan.


Almost done




__________________
Harry C - Urbanize Chicago- My Flickr stream HRC_OakPark
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
     
     
  #210  
Old Posted Sep 29, 2017, 11:37 PM
bnk bnk is offline
BANNED
 
Join Date: Mar 2006
Location: chicagoland
Posts: 12,741
amazing photos harry
and damn interesting massive temporary support structure.

Thanks for your continued work
     
     
  #211  
Old Posted Sep 30, 2017, 5:36 PM
SolarWind's Avatar
SolarWind SolarWind is offline
Chicago
 
Join Date: Jun 2006
Posts: 5,476
September 29, 2017













     
     
  #212  
Old Posted Oct 3, 2017, 12:36 PM
BVictor1's Avatar
BVictor1 BVictor1 is offline
Registered User
 
Join Date: Sep 2002
Location: Chicago
Posts: 10,413
10/02/17













__________________
titanic1
     
     
  #213  
Old Posted Oct 4, 2017, 8:49 PM
maru2501's Avatar
maru2501 maru2501 is offline
Registered User
 
Join Date: Oct 2015
Location: chicago
Posts: 1,668
I'm sorry, what is that they are building with the beams?
     
     
  #214  
Old Posted Oct 4, 2017, 9:01 PM
gebs's Avatar
gebs gebs is offline
Registered User
 
Join Date: Jan 2017
Location: South Loop
Posts: 790
Quote:
Originally Posted by maru2501 View Post
I'm sorry, what is that they are building with the beams?
This post by Daniel Schell should help explain it.
     
     
  #215  
Old Posted Oct 4, 2017, 10:04 PM
left of center's Avatar
left of center left of center is offline
1st Ward
 
Join Date: Sep 2006
Location: The Big Onion
Posts: 2,570
^ Would be nice if they re-used those beams to then build another bridge connecting Wolf Point Plaza with Canal St.
     
     
  #216  
Old Posted Oct 5, 2017, 1:57 AM
SolarWind's Avatar
SolarWind SolarWind is offline
Chicago
 
Join Date: Jun 2006
Posts: 5,476
October 4, 2017

















     
     
  #217  
Old Posted Oct 5, 2017, 4:32 PM
Northwest Northwest is offline
Registered User
 
Join Date: Oct 2007
Location: Chicago
Posts: 413
Wow, Chicago's own temporary boardwalk. Over half a million dollars and a lot of time to build a hundred yards of access road, but I can see now why they need it. The parking pit is going deeper, leaving no space for equipment to get in and out, and the riverbank was too steep without this bridge. Very interesting!
This makes me wonder what kind of crazy gymnastics will be required when its time for the south tower. Surely they will need a barge to access it.
     
     
  #218  
Old Posted Oct 5, 2017, 4:38 PM
J_M_Tungsten's Avatar
J_M_Tungsten J_M_Tungsten is offline
Registered User
 
Join Date: May 2009
Location: Chicago
Posts: 3,379
What a beautiful scene
     
     
  #219  
Old Posted Oct 5, 2017, 6:34 PM
maru2501's Avatar
maru2501 maru2501 is offline
Registered User
 
Join Date: Oct 2015
Location: chicago
Posts: 1,668
interesting. thanks
     
     
  #220  
Old Posted Oct 5, 2017, 7:17 PM
aaron38's Avatar
aaron38 aaron38 is offline
312
 
Join Date: Mar 2006
Location: Palatine
Posts: 4,128
Quote:
Originally Posted by SolarWind View Post
October 4, 2016
Quote:
Originally Posted by SolarWind View Post
October 4, 2017
A nice change from one year ago. A year from now it'll be making an impact.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 10:54 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.