Quote:
Originally Posted by Innsertnamehere
There are rumours around that a few big office buildings in the proposal stage right now are close to finalizing lead tenants, but we’ll have to wait and see. Toronto’s office market has something like a 2% vacancy rate.
|
Any hints? I'd be curious to know if
CC3 is moving forward (despite the dumbed-down design). Architectural top of CC3 is 302m plus an anorexic spire up to 376m.
3 supertalls underway at the same time (in one canuck city) would be a record that would stand for a long time.
Betting it might be CIBC Square 2 to start next or
The Hub given recent news/revisions (258m + cheater bird-box contraption and flagpole/spire up to 304m). Slight chance it could be BIG's Union Centre.