HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #21  
Old Posted Oct 18, 2019, 12:07 PM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283


KL/GREATER KUALA LUMPUR:
Line 1 - KTM Komuter Seremban Line
Line 2 - KTM Komuter Port Klang Line
Line 3 - LRT1 Ampang Line
Line 4 - LRT1 Sri Petaling Line
Line 5 - LRT2 Kelana Jaya Line - Petronas Twin Towers*, Four Seasons Places*, Menara Telekom*
Line 6 - ERL KLIA Ekspres Line
Line 7 - ERL KLIA Transit Line
Line 8 - KL Monorail Line - Merdeka118*
Line 9 - MRT1 SBK Line - The Exchange 106*, Merdeka118
Line 10 - KTM Skypark Link
Line 11 - LRT3 Klang Line (U/C) - 2024
Line 12 - MRT2 SSP Line (U/C) - 2021 - The Exchange 106*, Petronas Twin Towers*, M101*, Oxley Towers,* 8 Conlay*
KTM ETS - Electric Intercity Train (metre gauge)
ECRL - Electric Intercity Train (standard gauge) - (U/C) - 2026


*Supertall Connections / U/C
Reply With Quote
     
     
  #22  
Old Posted Oct 18, 2019, 12:44 PM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
UPDATE 2019:
METRO RAIL SYSTEMS
TOTAL: 151.1 KM 118 STATIONS
U/C: 89.2 KM 62 STATIONS


1. KUALA LUMPUR | MRT2 SSP Line | MRT | 52.2 KM | 37 STATIONS - LINE 9
[2021] Operated by: rapidKL: Sungai Buloh-Kajang
2. KUALA LUMPUR | MRT1 SBK Line | MRT | 51 KM | 34 STATIONS - LINE 9
[2016] Operated by: rapidKL: Sungai Buloh-Kajang
3. KUALA LUMPUR | LRT2 KELANA JAYA LINE | LRT | 46.4 KM | 37 STATIONS - LINE 5
[1998] Operated by: rapidKL: Gombak-Kelana Jaya-Putra Heights
4. KUALA LUMPUR | LRT1 AMPANG/SRI PETALING LINE | LRT | 45.1 KM | 36 STATIONS - LINE 3, LINE 4
[1997] Operated by: rapidKL: Sentul-Seri Petaling-Putra Heights
5. KUALA LUMPUR | LRT3 Line | LRT | 37 KM | 25 STATIONS - LINE 11
[2024] Operated by: rapidKL: Bandar Utama–Klang
6. KUALA LUMPUR | MONORAIL LINE | MONORAIL | 8.6 KM | 11 STATIONS - LINE 8
[2003] Operated by: rapidKL: KL Sentral Monorail Terminal-Titiwangsa

URBAN RAIL SYSTEMS
TOTAL: 344.4 KM 69 STATIONS

1. KUALA LUMPUR | SEREMBAN LINE | EMU | 135 KM | 26 STATIONS - LINE 1

[1995] Operated by: KTMB: Batu Caves-Seremban-Pulau Sebang/Tampin
2. KUALA LUMPUR | PORT KLANG LINE | EMU | 126 KM | 34 STATIONS - LINE 2
[1995] Operated by: KTMB: Tanjung Malim-Rawang-Port Klang
3. KUALA LUMPUR | EXPRESS RAIL LINK | EMU | 59.4 KM | 6 STATIONS - LINE 6, LINE 7
[2002] Operated by: ERL: KL Sentral-KLIA-KLIA2
4. KUALA LUMPUR | SKYPARK LINE | EMU | 24 KM | 3 STATIONS - LINE 10
[2018] Operated by: KTMB: KL Sentral-Subang Jaya-Terminal Skypark

Last edited by nazrey; May 23, 2021 at 2:06 AM.
Reply With Quote
     
     
  #23  
Old Posted Nov 18, 2019, 12:24 PM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283

Last edited by nazrey; Mar 11, 2021 at 7:21 AM.
Reply With Quote
     
     
  #24  
Old Posted May 20, 2020, 3:30 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
Reply With Quote
     
     
  #25  
Old Posted Sep 5, 2020, 4:08 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
MRT Putrajaya Line (52.2 km)
PHASE 1 - 2021
PHASE 2 - 2022


https://www.mymrt.com.my/project-upd...sia-selatan-6/

Last edited by nazrey; Mar 11, 2021 at 7:19 AM.
Reply With Quote
     
     
  #26  
Old Posted Oct 6, 2020, 5:12 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
Quote:
Originally Posted by nazrey View Post
MRT Putrajaya Line (52.2 km)
PHASE 1 - 2021
PHASE 2 - 2022


https://www.mymrt.com.my/project-upd...sia-selatan-6/

Last edited by nazrey; Mar 11, 2021 at 7:19 AM.
Reply With Quote
     
     
  #27  
Old Posted Mar 10, 2021, 1:50 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283

Last edited by nazrey; Sep 1, 2021 at 3:21 AM.
Reply With Quote
     
     
  #28  
Old Posted Mar 11, 2021, 7:16 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
Quote:
Originally Posted by nazrey View Post
UPDATE 2019:
METRO RAIL SYSTEMS
TOTAL: 151.1 KM 118 STATIONS
U/C: 89.2 KM 62 STATIONS


1. KUALA LUMPUR | MRT Putrajaya Line | MRT | 52.2 KM | 37 STATIONS - LINE 9
[2021] Operated by: rapidKL: Sungai Buloh-Kajang
2. KUALA LUMPUR | MRT1 SBK Line | MRT | 51 KM | 34 STATIONS - LINE 9
[2016] Operated by: rapidKL: Sungai Buloh-Kajang
3. KUALA LUMPUR | LRT2 KELANA JAYA LINE | LRT | 46.4 KM | 37 STATIONS - LINE 5
[1998] Operated by: rapidKL: Gombak-Kelana Jaya-Putra Heights
4. KUALA LUMPUR | LRT1 AMPANG/SRI PETALING LINE | LRT | 45.1 KM | 36 STATIONS - LINE 3, LINE 4
[1997] Operated by: rapidKL: Sentul-Seri Petaling-Putra Heights
5. KUALA LUMPUR | LRT3 Line | LRT | 37 KM | 25 STATIONS - LINE 11
[2024] Operated by: rapidKL: Bandar Utama–Klang
6. KUALA LUMPUR | MONORAIL LINE | MONORAIL | 8.6 KM | 11 STATIONS - LINE 8
[2003] Operated by: rapidKL: KL Sentral Monorail Terminal-Titiwangsa

URBAN RAIL SYSTEMS
TOTAL: 354.4 KM 69 STATIONS

1. KUALA LUMPUR | SEREMBAN LINE | EMU | 135 KM | 26 STATIONS - LINE 1

[1995] Operated by: KTMB: Batu Caves-Seremban-Pulau Sebang/Tampin
2. KUALA LUMPUR | PORT KLANG LINE | EMU | 126 KM | 34 STATIONS - LINE 2
[1995] Operated by: KTMB: Tanjung Malim-Rawang-Port Klang
3. KUALA LUMPUR | EXPRESS RAIL LINK | EMU | 69.4 KM | 6 STATIONS - LINE 6, LINE 7
[2002] Operated by: ERL: KL Sentral-KLIA-KLIA2
4. KUALA LUMPUR | SKYPARK LINE | EMU | 24 KM | 3 STATIONS - LINE 10
[2018] Operated by: KTMB: KL Sentral-Subang Jaya-Terminal Skypark
MRT Putrajaya Line
PHASE 1 (JULY 2021)
  • Damansara Damai
  • Sri Damansara Barat
  • Sri Damansara Sentral
  • Sri Damansara Timur
  • Metro Prima
  • Kepong Baru
  • Jinjang
  • Sri Delima
  • Kampung Batu
Damansara Damai


https://www.mymrt.com.my/project-upd...sara-damai-28/

Sri Damansara Barat


https://www.mymrt.com.my/project-upd...sara-barat-10/

Sri Damansara Sentral


https://www.mymrt.com.my/project-upd...ara-sentral-8/

Sri Damansara Timur - INTERCHANGE WITH LINE 1 + KTM ETS


https://www.mymrt.com.my/project-upd...nsara-timur-4/

Metro Prima


https://www.mymrt.com.my/project-upd...etro-prima-19/

Kepong Baru


https://www.mymrt.com.my/project-upd...epong-baru-24/

Jinjang


https://www.mymrt.com.my/project-upd...ng-jinjang-23/

Sri Delima


https://www.mymrt.com.my/project-upd...sri-delima-19/

Kampung Batu - INTERCHANGE WITH LINE 2


https://www.mymrt.com.my/project-upd...mpung-batu-22/
Reply With Quote
     
     
  #29  
Old Posted Mar 14, 2021, 4:25 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
MRT Putrajaya Line (line 12)
Phase 2 - Open Jan 2023


ttps://www.mymrt.com.my/project-updates/jalan-tun-razak-intervention-shaft-1-25/
Reply With Quote
     
     
  #30  
Old Posted Mar 16, 2021, 4:42 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
Muzium Negara MRT underground station (line 9)

Artistic design of historic National Museum, Kuala Lumpur, Malaysia by Viv...., on Flickr
Reply With Quote
     
     
  #31  
Old Posted Mar 16, 2021, 5:00 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
Quote:
Originally Posted by nazrey View Post
KTM ETS - Intercity train connection with Klang Valley integrated transit system
Operated by KTM (Keretapi Tanah Melayu) | National Railway of Malaysia
Speed: 140-160 km/hr
Total Length: 755 km (as of 2021)
Extension Project: 192 km (2023)
Code:
STATION                      CONNECTION LINE
Tanjung Malim                Line 2
Batang Kali                  Line 2
Rawang                       Line 2
Sungai Buloh                 Line 2, 12
Kepong Sentral               Line 2, 12
Kuala Lumpur                 Line 1, 2 
KL Sentral                   Line 1, 2, 5, 6, 7, 8, 9, 10, Seremban Express
Bandar Tasik Selatan         Line 1, 4, 7
Kajang                       Line 1, 9
Seremban                     Line 1
Pulau Sebang                 Line 1

https://upload.wikimedia.org/wikiped...cropped%29.jpg

Last edited by nazrey; Mar 17, 2021 at 9:48 AM.
Reply With Quote
     
     
  #32  
Old Posted Mar 17, 2021, 2:33 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
Line 12 - Putrajaya Line (Phase 1 July 2021)

Reply With Quote
     
     
  #33  
Old Posted Mar 19, 2021, 12:43 PM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
Line 11 - February 2024







Reply With Quote
     
     
  #34  
Old Posted Mar 21, 2021, 5:41 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
Line 11 - Johan Setia Line



Reply With Quote
     
     
  #35  
Old Posted Mar 25, 2021, 3:24 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
Line 11 - Johan Setia Line (37 km)
Interchange @Glenmarie station (line 5)


@SZ-eagle Eye Studiors

@SZ-eagle Eye Studiors
Reply With Quote
     
     
  #36  
Old Posted Mar 26, 2021, 12:47 PM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
Line 12: MRT Putrajaya Line (57.7 km)
Phase 2


https://www.mymrt.com.my/project-updates/
Reply With Quote
     
     
  #37  
Old Posted Apr 4, 2021, 12:36 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
Line 13
Construction of MRT3 project to continue, says Wee
Bernama April 03, 2021 15:39 pm +08
Quote:
SUNGAI BULOH (April 3): The construction of the Mass Rapid Transit Line 3 (MRT3) project, which was suspended by the previous government, will begin in the second half of this year.

Transport Minister Datuk Seri Dr Wee Ka Siong said as such, the ministry had given Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) three months to update the studies conducted previously on the implementation of the project, to be presented to the Cabinet.
https://www.theedgemarkets.com/artic...lignment-study
Reply With Quote
     
     
  #38  
Old Posted Apr 5, 2021, 8:26 AM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
Sri Damansara Timur/Kepong Sentral Station
Line 1
Line 12
KTM ETS


https://www.mymrt.com.my/project-upd...sara-timur-13/
Reply With Quote
     
     
  #39  
Old Posted Apr 5, 2021, 4:20 PM
bilbao58's Avatar
bilbao58 bilbao58 is offline
Registered User
 
Join Date: Jul 2008
Location: Homesick Houstonian in San Antonio
Posts: 1,676
Amazing to see all this. My parents lived in KL in the late 70s and there was nothing like this then. Makes me feel really old.
Reply With Quote
     
     
  #40  
Old Posted Apr 5, 2021, 10:25 PM
nazrey's Avatar
nazrey nazrey is offline
Moderator
 
Join Date: Mar 2004
Posts: 2,283
KL first metro line start in 1997 before hosting Commonwealth Games in 1998 while first urban line start in 1995 after double of its track of existed ancient single track in Kuala Lumpur
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 9:24 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.