HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
     
     
  #1  
Old Posted Jun 17, 2019, 6:11 AM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is offline
Registered User
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 5,306
Winnipeg Construction X

Winnipeg Construction X



Courtesy of Dan Harper Photography

Previous construction threads:
Winnipeg Construction 9
Winnipeg Construction 8
Winnipeg Construction 7
Winnipeg Construction 6
Winnipeg Construction 5
Winnipeg Construction 4
Winnipeg Construction 3
Winnipeg Construction 2
Winnipeg Construction 1


Winnipeg Developments


True North Square (Phase 1 complete, 17 floor Scotia Bank Tower & 25 floor retail, boutique office & residential tower)
Location: 242 Hargrave St, Winnipeg, MB
Developers: True North Real Estate Development Limited, True North Sports and Entertainment, James Richardson & Sons Limited, Northland Properties
Architect(s) : Perkins+Will in association with Architecture 49
Construction Manager: PCL Constructors Canada Inc
Completion: 2023
Size: 1.5M+ square feet
Project Type: office, retail, residential, hotel
Cost: $650 M+
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: U/C

True North Square Phase 2:
Sutton Place Hotel & Residences at True North Square
18-storey hotel tower, 13-storey La Grande Residences on 4-storey podium of retail & parking
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=130
Video Link


Aug 2021:
[img][/img]

True North Square Phase 3:
Wawanesa Mutual Insurance North American HQ
Location: 372 Graham Avenue and 236 Carlton Street, Winnipeg, MB
Developer: True North Real Estate Development (TNRED) & The Wawanesa Insurance
Architects: Architecture49
Contractor: PCL Constructors Inc
Status: Under Construction
Media: Wawanesa moving to new office tower at True North Square
Documents: http://clkapps.winnipeg.ca/DMIS/View...ctionId=576525
Project Thread: http://skyscraperpage.com/forum/showthread.php?t=245822

Aug 2021:


300 Main Street Apartment Tower
Location: 300 Main Street
Developers: Artis REIT https://300main.ca/
Architect: Raymond SC Wan Architects http://raymondscwanarchitect.com/300-main/
Floors: 42
Height: 465' | 142M
Phase 1: Reclad existing tower at 360 Main (complete)
Phase 2: Residential highrise (under construction)
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: U/C
Video Link


October 2020:


Canada's Diversity Gardens
Location: Assiniboine Park Winnipeg, MB
Developers: Assiniboine Park Conservancy
Architect(s) : KPMB (Design Architect) in association with Architecture 49
Completion: 2020
Size: 84,400 s.f.
Project Type: Cultural
Cost: 97.5M
Status: U/C
Description: 21st century botanical conservatory situated at the head of an existing Formal Garden at Assiniboine Park designed for LEED Silver Certification. It will be a signature piece of architecture that generates awareness and a presence in the park, an interactive destination that focuses on the interrelationships of plants and people, and a sustainable precedent focussing on horticulture, plants and the environment.
Fact: Main structure 'The Leaf' will be made of an extremely lightweight see-through plastic Ethylene tetrafluoroethylene (ETFE) and will contain the largest indoor waterfall in canada at 6-storey in height.
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Video Link


Nov 2020:


Red River College - Innovation Centre Exchange District Campus
Location: Location: 319 Elgin Avenue, Winnipeg, MB, Downtown Exchange District Campus
Architect: Diamond Schmitt Architects inc. and Number TEN Architectural Group
Developers: Red River College
Size: 100,000 sq. ft.
Budget: $95M
Completed: 2020 (targeted)
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: U/C
Video Link


Sept 2020:


James Ave Pumping Station Redevelopment
Location: 109 James Avenue, Winnipeg, MB
Developers: ALSTON PROPERTIES LTD.
Architect(s) : 5468796 Architecture Inc
Status: U/C
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=223833
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=122
Phase 1: 18,600 SF of office/retail space in the James Ave Pumping Station Building. Slated for demolition after 17 attempts to revive the historic structure over the last 14 years, the James Avenue Pumping Station was successfully preserved through the development of a financial / building pro forma that would make it financially feasible. 100% leased. Spring 2018 occupancy.
Phase 2: 28 high end rental apartments on Waterfront Drive available spring 2020.

Sept 2020: (Phase 2)

Phase 3: 65 rental apartments. Winter 2021 occupancy.

Nov 2020 (Phase 3):


OSBORNE PLACE AT THE STATION (Phase 2)
Location 265 Osborne St
Developer: Imperial Properties Winnipeg https://www.imperialproperties.ca/ou...SACEgKo_vD_BwE
Architect: DIN Projects http://www.dinprojects.ca/#http://ww...o/257-osborne/
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=220693
Status: On Hold



Osborne 380
Location: 380 Osborne
Developer:
Architect: DIN Projects
Status: U/C
Media: Infill apartment block planned for 380 Osborne
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...7&postcount=81
Description: 7-storey residential mixed use building with 71 dwelling units and one commercial spac ewith two levels of indoor parking, one underground and one at grade



The Arc Phase 1
Location: Location: 2525 Pembina Hwy , Winnipeg, MB
Architect: Architects + Research + Knowledge, Inc.
Developer: Campus Suites
Size: 352-unit, 16-storey multi-family building
Completion date: Unknown
Budget: $70 M
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=236081
Status: U/C
Renderings & Construction pics: http://forum.skyscraperpage.com/show...1&postcount=91
Description: 570 bed mixed-use student housing community in phase 1, phase 2 under development
http://clkapps.winnipeg.ca/DMIS/View...ctionId=493074
Video Link


Phase 2: Phase 2: The current proposed building (phase 2) is approximately 60 meters tall (18 storeys plus a mechanical penthouse). This will be able to provide 432 Residential units that will vary between 1, 2 and 4-bedrooms. One major feature will be the commercial/retail uses on the main floor of the building, similar to the Arc (2525 Pembina) development. Please note that building details may change based on feedback received throughout the engagement process


281 River Ave
Location: 281 River Ave, Winnipeg, MB
Architect: BLDG architecture office inc.
Developer: Towers Realty Group
Size: five-storey, 100-unit residential complex
Status: Proposed


Royal Aviation Museum of Western Canada
Location: Winnipeg Airports Authority campus on Wellington Avenue
Developer: Royal Aviation Museum of Western Canada
Architect(s): Architecture 49
Budget $45 million
Size 86,000 sf
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=101
Media: Ottawa set to announce $8.8 million for the Royal Aviation Museum
Video Link


May 2021:


Market Lands (2 phases)

Phase 1:The ‘New Market Square’
Location: 151 - 171 Princess Street
Developer: CentreVenture Development Corporation & Winnipeg Housing Rehabilitation Corporation
Architect: Daoust Lestage https://daoustlestage.com/en/project/market-lands/
Status: Demolition complete; RFP issued
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=110
Description: Redevelopment site of former Public Safety Building and civic parkade in The east Exchange District

October 2020:


98 Albert street
Location: 90 Albert St & 98 Albert street Winnipeg, MB
Developer: Unknown
Architect(s) : AtLRG Architecture Inc.
Status: U/C
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=119
Description: 3-storey wedge, main floor restaurant space with future sidewalk patio, 2 prestige residential units and rooftop terrace with garden


31 Riel Ave
Address: 31 Riel Ave street Winnipeg, MB
Location: https://www.google.com/maps/place/31...!4d-97.1163212
Developer: http://www.trademarkbuilders.ca/ https://www.instagram.com/trademarkbuilders/
Architect: https://www.atlrg.ca/
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=121
Description: A four-storey, 82 suite residential building with ground floor commercial suites complete with underground parking. The gable roof extends the amount of liveable space with the inclusion of brightly-lit mezzanine space for the forth floor suites, while also providing a distinctive identity to the local multi-family housing typology.


238 wellington crescent
Address: 238 wellington crescent Winnipeg, MB
Location: https://www.google.com/maps/place/23...67!4d-97.15065
Developer: http://trademarkbuilders.ca
Architect: http://www.5468796.ca/
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=123
Description: Infill development in a mature Winnipeg neighbourhood is starting construction. Six units replacing a single house on Wellington in Osborne.


Smith Street Lofts
Location: 185 Smith St Winnipeg, MB
Developer: Edison Properties
Architect(s) : MMP Architects Inc.
Construction Manager: Akman Construction Ltd.
Status: U/C
Project Thread: https://forum.skyscraperpage.com/sho...d.php?t=240240
Description: Former social housing complex being retrofitted to mix of 250 market-rate rentals and affordable units, renovations expected to be completed in 2021
Media: Smith Street tower will 'look like a very different building'

Nov 2020:


Mayfair Tower
Location: 109 Mayfair Winnipeg, MB
Developer:
Architects: Otto Cheng Architect Incorporated
Status: Proposed
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=131
Description: WRE Developments is considering the construction of a 15-storey, 96 unit residential apartment building located at 109 Mayfair across from downtown along the Assiniboine River.
http://landmarkplanning.ca/project/1...air-avenue.php


NewPortCenter Redevelopment
Location: 330 Portage Ave, Winnipeg, MB
Developer: KingSett Real Estate Growth LP No. 6 and CCI Corpfin Capital Acquisition Fund 1 LP
Status: U/C
Renderings & Construction pics: http://skyscraperpage.com/forum/show...8&postcount=93
Description:Lobby renovations, podium refurbishment & exterior reclad




200 Portage Ave.
Location: 200 Portage Ave
Developer: 200 Portage INC. (Carmyn Aleshka)
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...2&postcount=75
Description:Landlord has comprehensive plan to completely renovate 200 Portage, including the main floor and concourse space, redevelopment plans include upgraded floor to ceiling windows giving unprecedented 360° views of Portage and Main and flooding office spaces with natural light. Other upgrades include new curtain wall, doors, lobbies and elevators which will be replaced or upgraded.


201 Portage Avenue lobby renovations
Address: 201 Portage Winnipeg, MB
Developer: Harvard Property Management Inc
Status: U/C



320 River Avenue
Address: 320 River Avenue
Location: https://www.google.ca/maps/@49.88102...7i13312!8i6656
Architects: http://www.prairiearchitects.ca/
Status: Proposed
3-storey multifamily building with 12 units, he development is clad in brick with some corten steel accents, The development locates the parking inside the building


456 Bannatyne Avenue
Address: 456 Bannatyne Avenue
Location:https://www.google.com/maps/place/45...60692329565936
Architects: http://www.h5architecture.ca/
Status: Proposed
(4) storey mixed use building comprising of twenty six (26) residential units above ground and one (1) commercial unit at grade. The existing row housing on site will be removed.


Terrasse Boisjoli
Location: 989 Ducharme Avenue, St. Norbert, Winnipeg,
Developer: https://legatumdevelopment.co/
Architect(s): 5468796 Architecture Inc
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=103
Media: Renaissance underway in St. Norbert, Planned residential complex incorporates elements of Franco-Manitoban architecture
Description: Terrasse Boisjoli is a new 5 storey mixed-use multi-family project consisting of 40 1-and 2-bedroom suites, in-suite laundry, 9ft ceilings, heated indoor parking, and commercial space on the ground floor.

Mar 2021:


The Halo
Location: 2021 Pembina Highway, Winnipeg, MB
Developer: Private Pension Partners
Architects: Affinity Architecture Inc
Contractor: Unknown
Status: U/C
Media: Mystery revealed
Renderings & Construction pics: https://skyscraperpage.com/forum/sho...3&postcount=92
Description: 2 apartment towers 15 and 16 storeys, combined 406 residential units


Address: 139 Notre Dame St
Location:https://www.google.ca/maps/place/139...!4d-97.1253026
Architects: https://www.2architecture.ca/
Status: Proposed


Address: 235 Dumoulin St
Location:https://www.google.ca/maps/place/235...!4d-97.1200569
Architects: https://www.2architecture.ca/
Status: Proposed
2 Storey townhouse, 6 1000 sq2 units


(RESIDENCE LANGEVIN)
Address: 210 rue Masson
Location:https://www.google.ca/maps/place/210...5!4d-97.120443
Architects: https://www.ft3.ca/
Developer: Towers Realty Group
Status: Proposed
Media: https://ici.radio-canada.ca/nouvelle...oniface-projet
60 unit, 4 storey residential. According to the plan, the three facades of the former 1902 Francophone Normal School will be preserved.


Railside Residential Village at The Forks
PDF Storyboard: http://s3.documentcloud.org/document...al-package.pdf
Developer: The Forks North Portage Partnership
Status: Proposed
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=217747
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=108
Description: Railside at The Forks[/B] is a new kind of development and a major step in the evolution of The Forks. Railside represents the first ever opportunity for residential development at The Forks, on two parking lots known as Railside and Parcel 4. Remaining true to The Forks' founding vision, this significant mixed-use project will build on the site's abundant cultural background.



BOXCAR ALLEY at Union Station
Location: Union Station/The Forks, Winnipeg, MB
Developer: The Forks North Portage Partnership
Architects: PUBLIC CITY
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=108
Description: As a part of the Railside Residential Village at The Forks development, The Box Car Alley design playfully highlights the space under the CN rail line at the Forks, a space that is currently under-utilized and overlooked. The project seeks to brighten the peripheries of The Forks, revitalizing an important public space through public engagement, local business promotion and creative opportunities for artists and visitors.


The Forks National Heritage Site Visitor Centre
Location: 45 Forks Market Road, The Forks National Historic Site, Winnipeg, MB
Developer: The Forks North Portage Partnership
Architect(s): 1x1 architecture inc.
Size: 7,653 sq.ft.
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=159
Description: Due to the requirement by Parks Canada to not increase the built form on the protected site, the proposed Visitor Centre is located at the site of the existing orientation node, and will renovate the existing washroom / office building which consists of a circular structure constructed of tyndall stone plinths carrying a wood trellis. A major east-west axis cuts through the National Historic Site. From the west, this axis starts at the dome of Union Station, situated at the end of the Broadway promenade, continues through the centre of the orientation node and culminates at the Saint Boniface Cathedral-Basilica Parish on the east side of the Red River. This axis symbolically connects St. Boniface to Winnipeg’s downtown. The design intent was not only to maintain this axis, but to enhance it, thus the Visitor Centre was split into two buildings.


227 Stafford
Location: 227 Stafford
Developer: Progressive Real Estate
Architects: Affinity Architecture Inc
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=112
Description: Office space proposed for 2nd and 3rd floor, 4 residential units proposed for top floor
Media The Sou'wester Winnipeg Free Press


PRINCESS STREET APARTMENTS
Location 265 Princess St, Exchange District
Developer: Unknown
Architects: VERNE REIMER ARCHITECTURE INCORPORATED
Status: U/C
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=113
Description: 88 Apartment Units


Urban Square
Location: 230 Good Street (West Broadway)
Developer: Iron Clad
Architects:
Status: U/C
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=115
Description: Six storey multifamily residential building with 145 units.
Media: Approval sought for West Broadway complex; Addition of 145 units would ease city's need for new housing, councillor says

Aug 2021:


129 McDermot Avenue
Location: 129 McDermot Avenue, Exchange District
Developer: United Equities Group
Architects: Number Ten
Status: Proposed; Multiple development options available with large floor plate ((+/-) 24,000 SF)
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=118


Portage Place Redevelopment
Location: 393 Portage Ave
Architects: ARK / PETROFF
Developer: Starlight Investments
Status: Development stage
Media: Portage Place to undergo up to $400-M retrofit, multi-income residential towers added
Description: $400m+ retrofit of exisiting mall; two 20-storey rental residential towers with 500 to 550, new shopping, office spaces, and as a pedestrian-friendly courtyard
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=206



Upper Fort Garry Provincial Park Interpretive Centre
Location: Assiniboine Ave
Architects: designed by landscape architects Hilderman Thomas Frank Cram and architects Cohlmeyer Architecture Ltd.
Status: Proposed; Fundraising stage
Description: An interpretive centre, complete with exhibit space, a multi-purpose theatre, food service, a digital library and office space, will be the final piece within the park.



Location: 160 Osborne St
Developer: Private Pension Partners
Architect(s) : BLDG architecture office inc.
Status: Development stage
Construction Manager: Pre-Con Builders
Construction Pics: https://forum.skyscraperpage.com/sho...&postcount=139
Project Thread: https://forum.skyscraperpage.com/sho...d.php?t=240379
Description: 3 new buildings at the site of the (soon to be demolished) Osborne Village Inn. All three buildings will have covered and underground parking with 207 apartment suites across two lots, a total of 54,110-square-feet and about 14,000 square feet of combined commercial space at street level.
Media: Redevelopment of Osborne Village Inn passes first test
Video Link

  • 160 Osborne St, a six-storey,mixed-use, multi-family apartment building with 89 units
  • 424 and 425 Wardlaw Ave. two four-storey, mixed-use, multi-family complexes with 59 units each


Vue Taché
Location: 780 Taché Ave, (North St. Boniface)
Developer: StreetSide Developments
Architect(s) : 701 Architecture Inc.
Status: Development stage
Construction Manager: Unknown
Renderings & Construction pics: http://skyscraperpage.com/forum/show...&postcount=231
Description:StreetSide Developments is currently developing a 7-storey, concrete multi-family rental building, featuring approximately 87 units and underground parking across from Parc Elzéar Goulet in old St. Boniface.


FORTWHYTE ALIVE EXPANSION
Location: 2505 McGillivray Blvd
Developer: FortWhyte Alive Outdoor Adventure Center
Architect(s): Unknown
Status: Proposed - Construction is slated to begin late 2019
Construction Manager: Unknown
Description: Funding will support FortWhyte Alive in two extensive improvement projects:
  • The renovation of one of FortWhyte Alive’s key facilities – a deep energy retrofit and interior renovation of the iconic 35-year old Interpretive Centre.
  • The construction of a new facility, Buffalo Crossing – an 18,000 square foot multi-purpose building that will serve as a new southern gateway to FortWhyte from McGillivray Blvd. and a hub for new and creative outdoor recreation and education.


Gregg Building (Residential Conversion)
Location: 52 Albert Street, Winnipeg, MB
Developers: Knysh Construction
Status: U/C
Media: 'Rock-solid' reincarnation
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=140
Description: Unoccupied for over a decade plans are to keep the first two floors as commercial space, while floors three, four, and five will be potentially converted into 16 residential spaces.


Cornish Library (ADDITION AND RENOVATION)
Location: 20 WestGate, Winnipeg, MB
Developer: City of Winnipeg
Architects: PUBLIC CITY
Cost: $2.8M
Status: U/C, Summer 2020 opening
Media: Cornish Library closes for upgrades
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=154
Description: Renovations to 104+ year old heritage building include accessible entrance and washroom, complete redesign of spaces with adult, children's and teen areas on main floor, a computer area, and study and leisure spaces. An addition to the south of the building will feature an inviting glass reading room, overlooking both the gardens and riverbank, providing an intriguing view from Sherbrook Street to the northwest.


Mar 2021:


216 Sherbrook
Location: 216 Sherbrook St, Winnipeg, MB
Developer(s): Almaleki Developments Inc
Architect(s): 701 Architecture Inc.
Construction Manager: Ross Construction Limited
Status: Unknown
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=164
Description: 216 Sherbrook will be a mix use project featuring 24 stunning, luxurious apartments with incredible amenities like a rooftop terrace, top of the line finishes and so much more. This project will also include commercial space with exciting businesses to be announced very soon!
Status: In development


CRESCENT DRIVE PARK PAVILION
Location: 781 Crescent Drive, Winnipeg, MB
Developer: City of Winnipeg
Architects: PUBLIC CITY
Cost: $850,000
Status: U/C
Media: Design for Crescent Drive Park pavilion revealed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=157
Description: Crescent Drive Park Pavilion is an amenity structure that reaches into the landscape to support four-season activity beyond the building and within Winnipeg’s urban forest. Framed with native plantings, the structure supports new washrooms and change rooms and includes a fire pit, barbeque areas, and a skate change area.

Mar 2021:


Misericordia Assisted Living
Location: 691 Wolseley Ave.
Developer: Misericordia Corporation, Kastes Planning & Development
Architec(ts): Raymond SC Wan Architect Inc.
Contractor: Concord Projects Ltd.
Status: Proposed
Media: Seniors housing to replace Misericordia resource centre
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=160
Description: 10-storey 97 suite seniors living complex in West Broadway


Uptown Theatre (Redevelopment)
Location: 394 Academy Rd, Winnipeg, MB
Developers: Globe property management
Architect(s)/Engingeers: Nejmark Architect
Construction Manager: Concord Projects Ltd
Status: U/C
Description: The Uptown Theatre is a historic gem, located in the heart of the walkable Academy Road commercial area in River Heights. Redevelopment plans of this historic former theatre and bowling alley into a mixed-use development include 23 residential rental units ranging from 800 to 1,020 square feet, 4,000 sq. ft. of office space on the second floor and two ground-level retail storefronts.
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=166
Media: New life for River Heights landmark, Developer has vision for former theatre, bowling alley
Status: U/C


Winnipeg Hotel (Heritage restoration)
Location: 214 Main St
Developer: John Pollard
Architect: Unit 7 Architecture
Contractor: Jilmark Construction Ltd.
Status: In development
Media: Closing time for Winnipeg Hotel
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=167
Description: The hotel at 214 Main St. opened in 1881, it was purchased three years ago by a holding company fronted by John Pollard, co-chief executive officer of Pollard Banknote Ltd, plans are to refurbish the building and redevelop it into a boutique hotel. Pollard anticipates it could take as long as three years to complete the renovations on the Winnipeg Hotel.
A Brief History of the Winnipeg Hotel


National Research Council (NRC) advanced manufacturing development facility
Location: CentrePort Canada
Developer: National Research Council Canada
Architects: Number Ten Architectural Group & Diamond and Schmitt Architects Inc,
Contractor: Penn-Co Construction Canada (2003) Ltd.
Status: U/C
Media: National Research Council to be new CentrePort Canada tenant
Renderings & Construction pics: https://skyscraperpage.com/forum/sho...&postcount=169
Description: The 70,000-square-foot $60-million building will be located at CentrePort Canada, North America’s largest inland port, will broadly support the advanced manufacturing sector in areas such as additive manufacturing (3D printing), robotics and the integration of new digital technologies, such as artificial intelligence and the Internet of Things, into the manufacturing process. When completed, it will accommodate about 100 people, 40 per cent of those working in the building at any given time will be NRC staffers, while the rest will be from industry and academia.

Nov 2020:


Great West Metal (Redevelopment)
Location: 90 Alexander Ave (Exchange District)
Developer: RNDSQR
Architects: 5468796 Architecture
Contractor: Unknown
Status: In Development
Media: Waterfront wrap-around, Calgary developers planning to surround a rehabilitated heritage building with two new rental developments
Project thread: https://forum.skyscraperpage.com/sho...d.php?t=240542
Renderings & Construction pics: http://skyscraperpage.com/forum/show...&postcount=170
Description: $100 million investment, 300 rental apartments split between two recently acquired properties including the current site of Great West Metal; plans also include to rehabilitate an existing heritage building to create 16,000-square-feet of commercial/office space.

Nov 2020:


Location: 469, 471, 473, 475 and 481 St. Anne’s Rd.
Developer: Ryan Ridge owner of Ridgix Building Solutions Inc.
Architects: Northern Sky Architecture Inc.
Contractor: Unknown
Status: Proposed
Media: New life for vacant sites in St. Vital
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=172
Description: Six-storey, mixed-use building in the Lavalee neighbourhood of St. Vital with 77 residential units — and five commercial spaces at street level.


LOT 6
Location: 15 Berwick Crt.
Developer: Ironclad Developments Inc.
Status: Under Construction
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=173
Description: Transit oriented development at the Fort Rouge yards near the Fort Rouge Station along the Southwest Transitway.

July 2021:


96 Maryland St
Location: 96 Maryland St
Developer:
Architects: 2 Architecture Inc
Contractor:
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=176
Board of Adjustment: April 4, 2018
Description: four-storey multi-family residential building with 6 units in Wolseley


The Point of Wellington
Location: 254 Wellington Crescent
Developer: G&E Homes
Architects: 2 Architecture Inc
Contractor:
Status: U/C
Media:
Description: New 13 unit apartment building located at the intersection of Gertrude and Wellington in Osborne Village. The building is located on a pie shaped lot next to a city park, with unobstructed views of the surrounding area from all apartments. The building includes enclosed underground heated parking, a beautiful common roof top terrace, and a car share program made available to tenants and the public.


Regent
Location: 500 Regent, Trasncona neighborhood
Developer:
Architects: 2 Architecture Inc
Contractor:
Status: Design Development
Media:
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=178
Description: Residential apartment, 6 units ,5,520 SQ.FT


REVIVAL
Location: 817 St Paul ave. Winnipeg, MB
Developer: Privileged Communities
Architects:
Contractor:
Status: Design Development
Media:
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=179
Description: Infill apartment in the West End neighbourhood of St Mathews and Minto


350 River Ave.
Location: 350 River Ave. Winnipeg, MB
Developer: Andre Silva
Architect(s): 2 Architecture
Contractor:
Status: Proposed
Media: Changing plans over opposition; Osborne Village single-room-occupancy project revamped
Description: Plans are to redevelop lot it into a four-storey, single-room-occupancy building with 30 very small, private rooms. Shared spaces include kitchens, living and dining room, and roof terrace for social space.


Tech Offices
Location: 134 William Stephenson Way, Winnipeg, MB
Developers: Unknown
Architect(s)/Engingeers: StructureCraft Builders
Construction Manager: Unknown
Status: Permit Pending
Description: Two, six-storey, mass timber office buildings totaling 1600,000SF located in the cultural centre of downtown Winnipeg. The design includes ground floor commercial space and lobby access, with five floors of class A office space above. Other features include interior bleacher feature, convenience stairs, roof deck, and expansive views of the downtown.
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=196
Media: Hungry officials hoping SkipTheDishes delivers itself to Railside project at The Forks


THOMAS SCOTT MEMORIAL ORANGE HALL
Location: 216 Princess Street, Winnipeg, MB
Developer:
Architects: Northern Sky Architecture Inc.
Contractor:
Status: U/C
Media:
Description: This adaptive re-use project encompassed converting three existing buildings into a mixed use complex with an art gallery, commercial space and residential units. The heritage components of the building including the masonry, windows, storefronts and murals were rehabilitated and incorporated into the planning. The building was upgraded to meet the current life safety and accessibility standards.


530 River
Location: 530 River Ave, Winnipeg, MB
Developer: paragon design build.
Architects: Affinity Architecture Inc
Contractor: Unknown
Status: U/C
Media: City approves Village development; Neighbours concerned about increased density
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=213
Description: 530 River is an upscale apartment residence located in the heart of Winnipeg’s Osborne Village neighbourhood. This building will have an elevator, heated underground parkade, and will have 20 units available for rent Spring 2021.


Stradbrook Apartments
Location: 606 Stradbrook Avenue , Winnipeg, MB
Developer: Uknown
Architects: BLDG architecture office inc.
Contractor:Unknown
Status: In Development
Media: -
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=214
Description: 4-storey, 32-unit multifamily dwelling


Taylor Lee Residence
Location: 1170 Taylor Ave, Winnipeg, MB
Developer: Shindico
Architects: BLDG architecture office inc.
Contractor: -
Status: In Development
Media: Retail developer moves into multi-family, industrial projects in Winnipeg;
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=215
Description: 124-suite apartment building at Grant Park Festival, The concrete, steel and glass structure will also have 1.2 parking spots per unit.


Polo Park (mall Parking lot redevelopment)
Location: 1485 Portage Ave, Winnipeg, MB
Developer(s): Shindico & Cadillac Fairview Corporation Limited.
Architect(s): Unknown
Contractor: Unknown
Status: Rezoning Application
Media: Exclusive renderings show possible apartment development plans around Polo Park
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=217
Description: Development around Winnipeg's largest retail mall, Polo Park. The site currently sits in the Airport Vicinity Protection Area (AVPA), a bylaw, that is meant to “protect the 24-hour air operations of the airport by limiting residential noise complaints.”


433 Main - Tower Residential Conversion
Location: 433 Main Street, Winnipeg, MB
Developer: Alston Properties Ltd
Architect(s): AtLRG Architecture
Contractor:
Status: Under Construction
Media: City real estate continues to evolve
Renderings & Construction pics: http://skyscraperpage.com/forum/show...&postcount=220
Project Thread: http://skyscraperpage.com/forum/showthread.php?t=242936
Description: A 14 storey tower constructed in 1974 sits amongst Winnipeg’s historic collection of turn-of-the-Centrury building stock. A post-tensioned concrete & curtainwall building, its panoramic views are unmatched within the historic district. This project is converting the top 10 office floors into 94 residential units. The building will receive an envelope upgrade which includes glazing the front half of the existing precast panels and the development of a hung amenity space balcony on the penthouse level.

Sept 2020:


RIVERWOOD HOUSE
Location: 65 Stadacona Street, Winnipeg, MB
Developer: Riverwood Church Community & Winnipeg Supportive Housing Inc
Architects: Sputnik Architecture Inc.
Contractor:
Status: In Development
Media: City to mull Elmwood church sober-living facility plan; Transitional housing will be safe, supportive place to live after recovery
Renderings & Construction pics:
Description: With this new housing initiative by Winnipeg Supportive Housing Inc., in partnership with Riverwood Church Community, plans to construct a 40-unit housing complex that takes aim at poverty by developing supportive and safe housing for 40 of Winnipeg’s at-risk population in the emerging neighborhood of Elmwood.
Participants will have the opportunity to experience a community environment with peer based supports while gaining access to professional services and relational supports provided by on-site staff, partnering organizations and volunteers.


McLaren Hotel, mixed use residential development
Location: 554 Main Street, Winnipeg, MB
Developer: Rubi Gill
Architects: Verne Reimer
Status: Proposed
Contractor:
Media: McLaren owner wants to build new 'dignified living' space next to Main Street hotel; 110-year-old Winnipeg hotel moves closer to historical designation as plans revealed for development next door
Renderings & Construction pics: http://skyscraperpage.com/forum/show...&postcount=224
Description: As part of the renovations to the historic McLaren Hotel a new 12-storey mixed use residential building is proposed. Plans are to have one-third of the 108 suites designated as affordable housing.


Steinbach Credit Union
Location: 2100 McGillivray Blvd, Winnipeg, MB
Developer: Steinbach Credit Union
Architects: Raymond S.C. Wan
Contractor: Unknown
Status: In Development
Media: Branching out; SCU plans to overhaul Linden Ridge location while remaining open for business
Renderings & Construction pics: https://skyscraperpage.com/forum/sho...&postcount=227
Description: 45,000 square feet, $15 million new branch for SCU