HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Reply

 
Thread Tools Display Modes
     
     
  #13941  
Old Posted Dec 31, 2018, 8:34 PM
Orlando's Avatar
Orlando Orlando is offline
Registered User
 
Join Date: Nov 2007
Location: Seattle, WA
Posts: 3,990
Quote:
Originally Posted by mello View Post
So the developer wanted to build a 36 floor tower with very little parking, that's not going to fly. Funny how our whole society is falling apart due to parking, that will be the downfall of America not constructing our cities in such a matter where you don't need so much parking Then to build proper housing for our citizens parking makes the costs go up so much. Sad...
What is the minimum # of required parking spaces in San Diego? In Seattle there is no minimum, and above-grade parking counts towards FAR, and is not allowed to have street frontage. Lots of incentives to build it all underground or hidden. The existing above-grade parking garages in downtown are eyesores.
Reply With Quote
     
     
  #13942  
Old Posted Dec 31, 2018, 8:38 PM
Orlando's Avatar
Orlando Orlando is offline
Registered User
 
Join Date: Nov 2007
Location: Seattle, WA
Posts: 3,990
Quote:
Originally Posted by Will O' Wisp View Post
Found a post on reddit with the most perfect aerial shot of Manchester Pacific Gateway Progress


Courtesy Matt_Skywalker on reddit

I was out there myself the other day, I'd estimate that the entire site has been dug up by 5-6 feet and those deeper pits are closer to 30'. Underground parking perhaps?
What's under construction in the foreground of this photo? I'll be visiting in January and will be staying directly across it at the Embassy Suites hotel.
Reply With Quote
     
     
  #13943  
Old Posted Jan 1, 2019, 12:25 AM
Will O' Wisp Will O' Wisp is offline
Registered User
 
Join Date: May 2018
Location: San Diego
Posts: 481
Quote:
Originally Posted by Orlando View Post
What's under construction in the foreground of this photo? I'll be visiting in January and will be staying directly across it at the Embassy Suites hotel.
As I said in the original post, it's the Manchester Pacific Gateway. Largest project in SD history, 8 blocks worth of High/Mid rises.



Don't expect to see much more than a dirt patch when you visit though, it's a 4 year project and they're not even done with the underground portions yet.
Reply With Quote
     
     
  #13944  
Old Posted Jan 1, 2019, 12:25 AM
HurricaneHugo's Avatar
HurricaneHugo HurricaneHugo is offline
Category Five
 
Join Date: Aug 2002
Location: San Diego
Posts: 2,994
Manchester Pacific Gateway

5 towers and a park I think
Reply With Quote
     
     
  #13945  
Old Posted Jan 2, 2019, 8:27 PM
mello's Avatar
mello mello is offline
Babylon falling
 
Join Date: Sep 2002
Location: San Diego
Posts: 2,605
SD Fan or others with input can we have a more in depth discussion about this:

"Honestly, for residential high-rise projects, if it's not Bosa, Pinnacle, Alexan, or a project tied to the city (Park & Market, 7th & Market) I don't see much getting done anytime soon.

We have had a rash of towers proposed from obscure LLC entities who are just trying to get their entitlement permits done so they can increase the value of their properties for future sale". --------------------------------

Is this phenomenon routine in other cities as well? Why aren't other big developers who do projects in the Bay or LA coming here? Chinese guys, Miami guys, who knows? Why doesn't anyone come an challenge the hegemony of BOSA and Pinnacle its like they are a mafia with SD as their territory.

You are right SD Fan the are so many tall towers, 2 in Cortez Hill or close, 1st and Beech, this one just posted, and then 8th and Broadway possibly others that have full entitlements but have been sitting around for 2 years or more.

Thanks guys
__________________
<<<<< I'm loving this economic "recovery" >>>>>
Reply With Quote
     
     
  #13946  
Old Posted Jan 2, 2019, 8:44 PM
eburress's Avatar
eburress eburress is offline
Registered User
 
Join Date: Sep 2005
Posts: 1,526
Quote:
Originally Posted by mello View Post
SD Fan or others with input can we have a more in depth discussion about this:

"Honestly, for residential high-rise projects, if it's not Bosa, Pinnacle, Alexan, or a project tied to the city (Park & Market, 7th & Market) I don't see much getting done anytime soon.

We have had a rash of towers proposed from obscure LLC entities who are just trying to get their entitlement permits done so they can increase the value of their properties for future sale". --------------------------------

Is this phenomenon routine in other cities as well? Why aren't other big developers who do projects in the Bay or LA coming here? Chinese guys, Miami guys, who knows? Why doesn't anyone come an challenge the hegemony of BOSA and Pinnacle its like they are a mafia with SD as their territory.

You are right SD Fan the are so many tall towers, 2 in Cortez Hill or close, 1st and Beech, this one just posted, and then 8th and Broadway possibly others that have full entitlements but have been sitting around for 2 years or more.

Thanks guys
Getting permits so as to increase property values definitely does happen elsewhere. Developers "specializing" in specific geographies also seems pretty common. You don't see Trammell Crow building much out here and you don't see Bosa developing projects in Chicago, for example.
Reply With Quote
     
     
  #13947  
Old Posted Jan 3, 2019, 4:34 AM
sandiego_urban sandiego_urban is offline
Registered User
 
Join Date: Mar 2004
Posts: 975
Quote:
Originally Posted by SDfan View Post
Honestly, for residential high-rise projects, if it's not Bosa, Pinnacle, Alexan, or a project tied to the city (Park & Market, 7th & Market) I don't see much getting done anytime soon.

We have had a rash of towers proposed from obscure LLC entities who are just trying to get their entitlement permits done so they can increase the value of their properties for future sale.

I mean, maybe this one will be different, but eh. The only way I see them actually being built is if one of the larger development companies buys them and decides to move forward (as Bosa did with the the Block) or they could just squash the project entirely to eliminate competition.

As for 7th and Market, from what we last heard they were going to break ground in Q1 or Q2 2019 for a 2021 completion date. Keep your fingers crossed!

Also, a friend at the downtown partnership told me that the owners of the Californian are currently negotiating with their opponents to reach an agreement that preserves the old building but also permits a new tower on-site. Who knows if that'll work out...
You make a good point about all of the LLC proposals out there. I guess something is better than nothing. I'm just glad commercial development has finally woken up. Good to hear about 7th and Market.
Reply With Quote
     
     
  #13948  
Old Posted Jan 3, 2019, 4:42 AM
sandiego_urban sandiego_urban is offline
Registered User
 
Join Date: Mar 2004
Posts: 975
Quote:
Originally Posted by SDfan View Post
Oh! sandiego_urban, the Park and Broadway project renders, was that a recent proposal submitted to Civic or was that something you dug up?
I came across it while browsing the interactive map on the Civic SD website. They do a pretty good job of including the PDF drawings for each project.

http://civicsd.maps.arcgis.com/apps/...74826c0553c575
Reply With Quote
     
     
  #13949  
Old Posted Jan 3, 2019, 5:50 AM
Northparkwizard's Avatar
Northparkwizard Northparkwizard is offline
Registered User
 
Join Date: Jan 2013
Posts: 244
Great photo from photographer Jim Grant (@SDjimgrant).


Last edited by Northparkwizard; Jan 3, 2019 at 7:04 AM.
Reply With Quote
     
     
  #13950  
Old Posted Jan 3, 2019, 4:53 PM
SDfan's Avatar
SDfan SDfan is offline
Registered San Diegan
 
Join Date: Aug 2009
Posts: 1,055
Quote:
Originally Posted by sandiego_urban View Post
I came across it while browsing the interactive map on the Civic SD website. They do a pretty good job of including the PDF drawings for each project.

http://civicsd.maps.arcgis.com/apps/...74826c0553c575
Whoa, had not seen this map before. Thank you.

So many projects I had forgotten about. Really hoping 10th & E and 11th & E both get built. I noticed that the 10th & E project is from another Canadian developer, so that gives it a higher likelihood of being build in my opinion.

Also hoping Moderna at 14th & K gets scrapped. It's been sitting there since 2016 and is way below its max FAR potential.
Reply With Quote
     
     
  #13951  
Old Posted Jan 3, 2019, 5:34 PM
joemamma joemamma is offline
Registered User
 
Join Date: Aug 2016
Posts: 40
Quote:
Originally Posted by sandiego_urban View Post
I came across it while browsing the interactive map on the Civic SD website. They do a pretty good job of including the PDF drawings for each project.

http://civicsd.maps.arcgis.com/apps/...74826c0553c575

Another great find @sandiego_urban.


Any recent construction update photos from others wondering downtown?
Reply With Quote
     
     
  #13952  
Old Posted Jan 5, 2019, 6:08 AM
SDCAL SDCAL is offline
Registered User
 
Join Date: Apr 2007
Posts: 882
Quote:
Originally Posted by sandiego_urban View Post
I was hoping someone here would know more about the timeline. It's great seeing taller towers being built in the eastern of downtown.

Anyone know if there is any movement going on at 7th & Market yet?
I’m getting nervous about this one. I talked with someone involved with 7th/Market and they seemed iffy and alluded to more problems, but didn’t really give details. They told me it might break ground in the Fall, which was shocking because I thought all their issues were resolved and they were ready to break ground by April.

If this one falls through, that site, which is centrally located and had been a surface lot for decades, will probably remain a surface lot for another decade.

Perhaps someone can try and get more info. The person I talk to didn’t want to reveal much, but they weren’t very optimistic about it at all.
Reply With Quote
     
     
  #13953  
Old Posted Jan 5, 2019, 3:01 PM
SDfan's Avatar
SDfan SDfan is offline
Registered San Diegan
 
Join Date: Aug 2009
Posts: 1,055
Quote:
Originally Posted by SDCAL View Post
I’m getting nervous about this one. I talked with someone involved with 7th/Market and they seemed iffy and alluded to more problems, but didn’t really give details. They told me it might break ground in the Fall, which was shocking because I thought all their issues were resolved and they were ready to break ground by April.

If this one falls through, that site, which is centrally located and had been a surface lot for decades, will probably remain a surface lot for another decade.

Perhaps someone can try and get more info. The person I talk to didn’t want to reveal much, but they weren’t very optimistic about it at all.
Uhhhhhhh. The train is leaving the station for this cycle. If they don't break ground by end of Q2 they're not getting built period.
Reply With Quote
     
     
  #13954  
Old Posted Jan 6, 2019, 3:41 AM
mello's Avatar
mello mello is offline
Babylon falling
 
Join Date: Sep 2002
Location: San Diego
Posts: 2,605
^^^^ So you dont think the courthouse redevelopment, or BOSA's semi twin to Pac Gate will be built in this current cycle.... Alexan Little Italy said Q3 or 4 start in the recent UT piece. I hope that one slides in under the trap door.
__________________
<<<<< I'm loving this economic "recovery" >>>>>
Reply With Quote
     
     
  #13955  
Old Posted Jan 6, 2019, 6:56 AM
sandiego_urban sandiego_urban is offline
Registered User
 
Join Date: Mar 2004
Posts: 975
Quote:
Originally Posted by SDfan View Post
Whoa, had not seen this map before. Thank you.

So many projects I had forgotten about. Really hoping 10th & E and 11th & E both get built. I noticed that the 10th & E project is from another Canadian developer, so that gives it a higher likelihood of being build in my opinion.

Also hoping Moderna at 14th & K gets scrapped. It's been sitting there since 2016 and is way below its max FAR potential.
Yeah, that map is pretty cool. And I'm also a fan of the 11th & E project.
Reply With Quote
     
     
  #13956  
Old Posted Jan 6, 2019, 7:10 AM
sandiego_urban sandiego_urban is offline
Registered User
 
Join Date: Mar 2004
Posts: 975
Quote:
Originally Posted by SDCAL View Post
I’m getting nervous about this one. I talked with someone involved with 7th/Market and they seemed iffy and alluded to more problems, but didn’t really give details. They told me it might break ground in the Fall, which was shocking because I thought all their issues were resolved and they were ready to break ground by April.

If this one falls through, that site, which is centrally located and had been a surface lot for decades, will probably remain a surface lot for another decade.

Perhaps someone can try and get more info. The person I talk to didn’t want to reveal much, but they weren’t very optimistic about it at all.
If there's one project that I'm hoping will get built before the next crash, it's this one. It would be a real shame it this one gets axed. This project is just what Market Street needs to bring it to life.......Office, hotel, condo, retail, all in one.
Reply With Quote
     
     
  #13957  
Old Posted Jan 7, 2019, 2:29 AM
SDCAL SDCAL is offline
Registered User
 
Join Date: Apr 2007
Posts: 882
Quote:
Originally Posted by sandiego_urban View Post
If there's one project that I'm hoping will get built before the next crash, it's this one. It would be a real shame it this one gets axed. This project is just what Market Street needs to bring it to life.......Office, hotel, condo, retail, all in one.
Me too. I’m hoping someone can find out more info on what the hold up is. The union issue was resolved so something else must be happening.
Reply With Quote
     
     
  #13958  
Old Posted Jan 7, 2019, 3:07 AM
vietnamprivatecar vietnamprivatecar is offline
BANNED
 
Join Date: Jan 2019
Posts: 0
Good
Reply With Quote
     
     
  #13959  
Old Posted Jan 9, 2019, 5:03 PM
SDfan's Avatar
SDfan SDfan is offline
Registered San Diegan
 
Join Date: Aug 2009
Posts: 1,055
News on 7th & Market:

Quote:
“Lenders are more cautious and somewhat concerned about new supply coming into the marketplace, and for larger, full-service hotels they are requiring more equity from the developers,” said Atlas CEO Alan Reay.

“Secondly, the cost of construction, including the cost of raw materials and labor, has skyrocketed. One of the negatives of a very strong economy is the labor pool is very small in terms of finding people to work on your project so contractors are bidding high to find labor. If you’re not out of the ground today, I think it’s going to be a tough situation.”

In Southern California, Atlas says there are more than 90,000 hotel rooms in various stages of planning, including more than 17,000 in San Diego County, but it’s likely that only a fraction of those will ultimately move forward.

Cisterra, a San Diego-based developer, has long had plans to build a Ritz Carlton in downtown San Diego, but the $450 million project, which also includes office space, housing and a gourmet market, was delayed by a union-backed legal challenge. That litigation, though, has been settled, and Cisterra has now been trying to land financing.

Cisterra Project Principal Jason Wood said Tuesday that he is optimistic about securing financing by the end of this quarter.


https://www.sandiegouniontribune.com...109-story.html
Reply With Quote
     
     
  #13960  
Old Posted Jan 11, 2019, 8:13 PM
staplesla staplesla is offline
Registered User
 
Join Date: Feb 2008
Location: Downtown Los Angeles
Posts: 322
"Doubling down on a mission to connect public transportation to the airport, San Diego’s mayor and the county’s transit chief have landed on a 71-acre, airport- and freeway-adjacent site that they see as the region’s utopian transit hub of tomorrow....Specifics are slim, but the early plan, as outlined by Ikhrata and strongly advocated for by Faulconer, would combine the SPAWAR land with the existing Old Town Transit Center to create a 120-acre, mixed-use development. That project would be theoretically funded by multiple regional agencies and developed through a public-private partnership. As envisioned, the Grand Central transit hub would sit at the nexus of a larger project (with to-be-determined housing and office elements), and bring together all current and future rail options. Included in the hub would be a people mover to shuttle commuters to and from San Diego International Airport’s two terminals, Ikhrata said."

https://www.sandiegouniontribune.com...111-story.html

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 11:08 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.