Quote:
Originally Posted by TheSpud0
|
That's just the rat/waste slab that is poured to level the area and provide a base for them to build the rebar cage for the crane base, but those 4 caissons are both columns foundations and supporting the crane pad. They are getting closer to being ready for a crane, probably only a couple of weeks before that is poured.
Location is just splitting columns and will just leave a gap in the garage levels. The tower is not located in that area, it's open amenity deck, so they can build the tower and patch the garage floors once the crane comes down. PalmTower has a similar cut out in it's garage floors too for the crane that will need to be patched, but the tower itself steps back so both only affect the garage levels.