  #1021  
Old Posted May 27, 2021, 3:45 PM
WestsideLA WestsideLA is offline
Registered User
 
Join Date: Jan 2020
Location: Los Angeles
Posts: 141
This release says:

"He will remain engaged on selected University projects, including the...New Engineering and Science Building"

https://www.newswise.com/articles/iv...medical-center
Reply With Quote
     
     
  #1022  
Old Posted Jun 30, 2021, 6:36 AM
WestsideLA WestsideLA is offline
Registered User
 
Join Date: Jan 2020
Location: Los Angeles
Posts: 141
No real surprise but Dean Boyer confirms the University is still considering one more big dorm complex (31:40) and about 53:00 vaguely discusses the new science building. He says north of Ratner but I'm assuming he means south (by PME).

https://www.youtube.com/watch?v=xj5V7hKq1fA

Last edited by WestsideLA; Jul 1, 2021 at 12:10 AM.
Reply With Quote
     
     
  #1023  
Old Posted Jul 9, 2021, 5:55 PM
WestsideLA WestsideLA is offline
Registered User
 
Join Date: Jan 2020
Location: Los Angeles
Posts: 141
Update on cancer hospital. UCM annual report filed with state (below). One highlight:

"As noted in our prior Annual Progress Report we are reconsidering the design of the renovation in Mitchell Hospital and have scheduled a technical assistance meeting to discuss this change. Following the technical assistance meeting we anticipate filing for a Permit Alteration to reflect those changes."

Status Report filed June 9, 2021:

On May 10, 2016 the Illinois Health Facilities and Services Review Board granted a permit (the “Permit”) to the University of Chicago Medical Center (“UCMC”) for the Project referenced above. This Project included a newly constructed Adult Emergency Department (ED) for a Level I Trauma Center, a new Cellular Therapy Department, and renovation of the Mitchell Hospital building with the addition of 188 beds. 1. Current Status of the Project The new Emergency Department opened December 29, 2017 and approval for Level I Trauma services was approved by the Illinois Department of Public Health on May 1, 2018. The Cellular Therapy phase of the Project was completed and opened on December 31, 2018. The renovation of the Mitchell Hospital building remains ongoing. We have deployed 110 of the 188 patient beds approved for this Project to support the general growth in inpatient demand as well as accommodate additional patients using the Adult ED and Trauma Level I service. Adult ED visits have grown from the 57,201 for 2015 to 73,385 for 2020. As noted in our prior Annual Progress Report we are reconsidering the design of the renovation in Mitchell Hospital and have scheduled a technical assistance meeting to discuss this change. Following the technical assistance meeting we anticipate filing for a Permit Alteration to reflect those changes.

2. Project Costs The Project remains within approved requirements of the Permit. Attached are tables that present the costs incurred and compare current estimated costs to the permit Project Costs and Sources of Funds. Through May 31, 2021 expenses incurred are $98,951,823. As part of the Annual Project Report process we have reclassified some amounts from prior reports to reflect the proper line item. These changes were primarily in the Preplanning line and now shows interest expense from new market tax credits of $1,113,196 under “Net Interest Expense During Construction”.
Ms. Courtney Avery June 9, 2021 Page 2 38609063.1

3. Source of Funds As part of the planned Permit Alteration, we anticipate reducing or eliminating the use of debt and instead financing the Project primarily from cash and other sources. Please note that in our prior annual progress report we showed $8,849,100 in “Bond Issues” as a source of funds through August 2020. These funds are new market tax credits, and in the current report we report that amount as part of “Other Sources of Funds”.

4. Anticipated Date of Completion The Project Completion Date is June 30, 2022. At this point we are hoping to complete the Project by that date but acknowledge that there have been COVID-19 delays in the Project. Please let us know if you need further information.

The 2020 report noted: "Construction to modernize aging building infrastructure in UCMC’s Mitchell Hospital has begun and remains in progress."

The 2019 reported noted unexpectedly high cost of Mitchell renovations.
Reply With Quote
     
     
  #1024  
Old Posted Jul 17, 2021, 1:53 AM
WestsideLA WestsideLA is offline
Registered User
 
Join Date: Jan 2020
Location: Los Angeles
Posts: 141
Reply With Quote
     
     
  #1025  
Old Posted Aug 14, 2021, 4:21 AM
WestsideLA WestsideLA is offline
Registered User
 
Join Date: Jan 2020
Location: Los Angeles
Posts: 141
New website for improvements for OPC:

https://jacksonparkimprovements.org
Reply With Quote
     
     
  #1026  
Old Posted Aug 31, 2021, 5:39 PM
WestsideLA WestsideLA is offline
Registered User
 
Join Date: Jan 2020
Location: Los Angeles
Posts: 141
Construction of new south parking garage:

https://facilities.uchicago.edu/cons..._use_facility/


Last edited by WestsideLA; Sep 2, 2021 at 5:43 AM.
Reply With Quote
     
     
  #1027  
Old Posted Sep 1, 2021, 7:06 PM
WestsideLA WestsideLA is offline
Registered User
 
Join Date: Jan 2020
Location: Los Angeles
Posts: 141
Article on the new science and engineering building:

https://www.chicagobusiness.com/tech...esearch-expand
Reply With Quote
     
     
  #1028  
Old Posted Sep 5, 2021, 4:51 AM
WestsideLA WestsideLA is offline
Registered User
 
Join Date: Jan 2020
Location: Los Angeles
Posts: 141
Reply With Quote
     
     
  #1029  
Old Posted Sep 10, 2021, 4:28 PM
SIGSEGV's Avatar
SIGSEGV SIGSEGV is offline
He/his/him. >~<, QED!
 
Join Date: Jun 2018
Location: Loop, Chicago
Posts: 6,017
__________________
And here the air that I breathe isn't dead.
Reply With Quote
     
     
  #1030  
Old Posted Sep 10, 2021, 10:04 PM
WestsideLA WestsideLA is offline
Registered User
 
Join Date: Jan 2020
Location: Los Angeles
Posts: 141
Quote:
Originally Posted by SIGSEGV View Post
Nice pic.
Reply With Quote
     
     
  #1031  
Old Posted Sep 12, 2021, 11:00 PM
WestsideLA WestsideLA is offline
Registered User
 
Join Date: Jan 2020
Location: Los Angeles
Posts: 141
Regarding the cancer hospital...

The state released this update for the 9/24/21 meeting. Apparently UCMD has scaled back plans for Mitchell because of costs. Not sure whether it is hinting that it may eventually go for a brand new facility instead of major upgrade of Mitchell or not... Maybe more outpatient facilities...? Do not know...

https://www2.illinois.gov/sites/hfsr...0[1st].pdf

https://www2.illinois.gov/sites/hfsr...go-16-008.aspx
Reply With Quote
     
     
  #1032  
Old Posted Oct 28, 2021, 10:01 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Monterey CA
Posts: 4,208
Well, I think I have a better understanding now as to why the Obama Foundation never had any interest in the large, vacant square lot on 55th street just east of the Green Line stop, that many of our forum armchair experts thought 'would be a perfect', 'logical' or 'idiotic not to build there' location for the Obama Center. Met with an influential researcher today regarding a new space for them, and they not-so-subtly stated that UC has long-term plans to expand the University westward, in the general vacinity of Garfield Blvd/55th St, MLK Drive, all the way to Wabash. They have been purchasing many vacant lots over the past decade, with plans to build a variety of new University research and teaching facilities, housing and community outreach centers, etc. No timelines were mentioned, but the implication was that UC doesn't really have room to expand north of the current Quad/center, nor is there even a lot of space that they can expand south of the Midway, considering the already explosive growth that the south campus has experienced in the past 10 years alone. West of Washington Park is perceived as the next logical step in their continued expansion in the 21st century, in order to maintain the same level of quality as other top-tier US universities. And YES, there is something very specific and large planned for the big lot on the NW corner of Garfield Blvd/55th St and MLK Drive.
__________________
Don't be shy. Step into the light.

Last edited by sentinel; Oct 29, 2021 at 3:03 AM.
Reply With Quote
     
     
  #1033  
Old Posted Oct 29, 2021, 5:51 AM
WestsideLA WestsideLA is offline
Registered User
 
Join Date: Jan 2020
Location: Los Angeles
Posts: 141
Quote:
Originally Posted by sentinel View Post
Well, I think I have a better understanding now as to why the Obama Foundation never had any interest in the large, vacant square lot on 55th street just east of the Green Line stop, that many of our forum armchair experts thought 'would be a perfect', 'logical' or 'idiotic not to build there' location for the Obama Center. Met with an influential researcher today regarding a new space for them, and they not-so-subtly stated that UC has long-term plans to expand the University westward, in the general vacinity of Garfield Blvd/55th St, MLK Drive, all the way to Wabash. They have been purchasing many vacant lots over the past decade, with plans to build a variety of new University research and teaching facilities, housing and community outreach centers, etc. No timelines were mentioned, but the implication was that UC doesn't really have room to expand north of the current Quad/center, nor is there even a lot of space that they can expand south of the Midway, considering the already explosive growth that the south campus has experienced in the past 10 years alone. West of Washington Park is perceived as the next logical step in their continued expansion in the 21st century, in order to maintain the same level of quality as other top-tier US universities. And YES, there is something very specific and large planned for the big lot on the NW corner of Garfield Blvd/55th St and MLK Drive.
Interesting. So it sounds as though that expansion will be sooner rather than later? Will it be the new science and engineering building or something for the hospital?
Reply With Quote
     
     
  #1034  
Old Posted Oct 29, 2021, 1:09 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Monterey CA
Posts: 4,208
Quote:
Originally Posted by WestsideLA View Post
Interesting. So it sounds as though that expansion will be sooner rather than later? Will it be the new science and engineering building or something for the hospital?
No timeline on an 'West Campus' expansion, so definitely not sooner than later. The new science & engineering building will be located on the existing science quad, while a new cancer hospital will still be within the hospital campus, as far as I know on each of the latter two.
__________________
Don't be shy. Step into the light.
Reply With Quote
     
     
  #1035  
Old Posted Oct 29, 2021, 8:53 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Monterey CA
Posts: 4,208
Also, coincidentally, I believe the new UC president is being sworn in today, to replace Dr. Zimmer who is retiring.
__________________
Don't be shy. Step into the light.
Reply With Quote
     
     
  #1036  
Old Posted Oct 29, 2021, 9:33 PM
southoftheloop southoftheloop is offline
Registered User
 
Join Date: Mar 2018
Posts: 111
Quote:
Originally Posted by sentinel View Post
Also, coincidentally, I believe the new UC president is being sworn in today, to replace Dr. Zimmer who is retiring.
Indeed. Zimmer led the university's prolific fundraising and building boom over the past decade-plus. High hopes for President Alivisatos. The university will continue to be in good hands.
Reply With Quote
     
     
  #1037  
Old Posted Oct 30, 2021, 1:10 AM
thegoatman thegoatman is offline
BANNED
 
Join Date: Oct 2021
Posts: 646
Is UC up there with Stanford, Duke, Harvard, Yale, Princeton, MIT?

Great to see more possible expansion for the university
Reply With Quote
     
     
  #1038  
Old Posted Oct 30, 2021, 12:29 PM
southoftheloop southoftheloop is offline
Registered User
 
Join Date: Mar 2018
Posts: 111
Quote:
Originally Posted by thegoatman View Post
Is UC up there with Stanford, Duke, Harvard, Yale, Princeton, MIT?
Yes.
Reply With Quote
     
     
  #1039  
Old Posted Oct 30, 2021, 5:00 PM
BruceP BruceP is offline
Registered User
 
Join Date: Jun 2020
Location: Chicago, IL
Posts: 60
Quote:
Originally Posted by southoftheloop View Post
Yes.
If we're talking absolute dollar amount, not by a long shot, except for Duke:
1) Harvard: $41.9 billion
2) Yale: $31.1 billion
3) Stanford: $28.9 billion
4) Princeton: $26.6 billion
5) MIT: $18.4 billion
6-10) Etc.
11) U. of Chicago: $10.0 billion
12) Duke: $8.5 million

BUT, What may be more meaningful is endowment per student. Here, Princeton is #1 at $2.9 million and Chicago is only #39 at $449M.

BUT BUT, none of this directly correlates to quality. Many 2nd and 3rd rate schools have larger endowments per student than Chicago, while Chicago has the 2nd highest number of official Nobel laureates, after Cambridge in the UK, and well ahead of Harvard, Princeton, etc.

Having said all this, more money is always better than less money. (And all numbers are approx.)
Reply With Quote
     
     
  #1040  
Old Posted Oct 31, 2021, 6:11 AM
WestsideLA WestsideLA is offline
Registered User
 
Join Date: Jan 2020
Location: Los Angeles
Posts: 141
Quote:
Originally Posted by BruceP View Post
If we're talking absolute dollar amount, not by a long shot, except for Duke:
1) Harvard: $41.9 billion
2) Yale: $31.1 billion
3) Stanford: $28.9 billion
4) Princeton: $26.6 billion
5) MIT: $18.4 billion
6-10) Etc.
11) U. of Chicago: $10.0 billion
12) Duke: $8.5 million

BUT, What may be more meaningful is endowment per student. Here, Princeton is #1 at $2.9 million and Chicago is only #39 at $449M.

BUT BUT, none of this directly correlates to quality. Many 2nd and 3rd rate schools have larger endowments per student than Chicago, while Chicago has the 2nd highest number of official Nobel laureates, after Cambridge in the UK, and well ahead of Harvard, Princeton, etc.

Having said all this, more money is always better than less money. (And all numbers are approx.)

I'm not sure what this has to do with architecture...but if you want to go there, for one thing, just listen to Steven Chu from Stanford discuss during Alivisatos' inauguration why UChicago is the best school in the world at producing young scientists. He said Berkeley was second. Indeed, UChicago produced James Watson, who is a greater scientist than anyone ever produced by HYPSM--by a long shot.

Finally, UChicago, as this blog shows, is the most popular college by far at the Top 50 prep schools in the U.S.:

https://tophscollege.blogspot.com/20...at-top-50.html
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > General Development
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 9:54 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.