Quote:
Originally Posted by Zerton View Post
I thought those setback laws apart from the street wall were all gone in NY. I like the throwback massing
Nope, sky exposure planes are still going strong! There are just other options and lots of different special district massing rules these days as well.
Reply With Quote
     
     
  #22  
Old Posted Jul 7, 2022, 11:40 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,826
Under the radar NYC projects.





Reply With Quote
     
     
  #23  
Old Posted Aug 18, 2022, 1:59 AM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,826


Quote:
600 W. 125th Street
Current Phase of Construction: Excavation and Foundation:

Noisy work should be expected during most days during this phase of construction
Excavation and foundation is anticipated to be complete by the end of the third quarter of 2022
What is Happening During the Next Two Weeks:

Daytime utility work on the north side of 125th Street and Broadway has commenced. Work will involve the contractor saw cutting and breaking up the street and sidewalk to install the new building utility connections (for future water and sanitary) by using jackhammers, road saw, and backhoe. A dump truck will be used to remove material.
Site dewatering is in progress
Elevator pit excavation and concrete installation
Crane pad support of excavation installation
Installation of foundation and mat slab rebar, formwork, and waterproofing
Concrete trucks will be used to install the mud slabs and mat slabs
Underground utility layout and installation
An excavator will be used to complete site grading, clean up, and soil removal
Regular work hours temporarily extended until 8:00 p.m. Monday through Friday
=======================
https://neighbors.columbia.edu/news/...1522-and-82222
Reply With Quote
     
     
  #24  
Old Posted Sep 7, 2022, 12:40 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,826
Reply With Quote
     
     
  #25  
Old Posted Nov 15, 2022, 3:42 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,826
Reply With Quote
     
     
  #26  
Old Posted Jan 10, 2023, 2:10 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,826
Reply With Quote
     
     
  #27  
Old Posted Feb 4, 2023, 3:58 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,826
Construction Update: Weeks of 2/6/23 and 2/13/23



Quote:
Current Phase of Construction: Superstructure:

Noisy work should be expected during most days during this phase of construction
The superstructure phase is anticipated to be complete in Spring 2023
What is Happening During the Next Two Weeks:

Support of excavation removal from the cellar is ongoing. There may be some visible smoke that contractors will control to be away from adjacent buildings using air filtration equipment and fans.

Utilities and fire department standpipe are being installed throughout the building

Delivery and installation of rebar and formwork for columns and slabs for 13th to 16th floors

Concrete trucks and pumps will be used to pour columns, stairs, and floor slabs

The building enclosure contractor is completing deliveries and installing brackets for exterior panels
Installation of the vertical hoist is continuing
Regular work hours temporarily extended until 8:00 p.m., Monday through Friday
=======================
https://neighbors.columbia.edu/news/...2623-and-21323
Reply With Quote
     
     
  #28  
Old Posted Feb 23, 2023, 6:03 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,826

Credit: neighbors.columbia.edu



Quote:
600 W. 125th Street
Current Phase of Construction: Superstructure:

Noisy work should be expected during most days during this phase of construction

The superstructure phase is anticipated to be complete in Spring 2023
What is Happening During the Next Two Weeks:

Support of excavation removal from the cellar is ongoing. There may be some visible smoke that contractors will control to be away from adjacent buildings using air filtration equipment and fans.
Utilities and fire department standpipe are being installed throughout the building
Delivery and installation of rebar and formwork for columns and slabs for the 16th to 19th floors
Concrete trucks and pumps will be used to pour columns, stairs, and floor slabs
The building enclosure contractor is completing deliveries and installing exterior panels
The tower crane will be raised by adding new structural sections
Installation of the vertical hoist is continuing
Regular work hours temporarily extended until 8:00 p.m., Monday through Friday


Studebaker Building Façade Repairs and Roof Replacement
Joint cutting work at the elevator tower will continue, weather permitting. It will create grinding noise and dust but may not be noticeable to occupants.
The crew will continue to work mainly at the elevator tower bulkhead and work will be located primarily in the interior of the bulkhead. This work will create some intermittent noise but may not be noticeable to occupants.
The installation of new terra cotta units will begin at the south and north elevation, weather permitting. Terra cotta units are anchored to the building with about 2-4 pins each. Drilling for pins will create some intermittent noise followed by mostly quiet work
Reply With Quote
     
     
  #29  
Old Posted Apr 16, 2023, 4:38 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,826
Reply With Quote
     
     
  #30  
Old Posted Jun 9, 2023, 1:12 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,826
Reply With Quote
     
     
  #31  
Old Posted Jul 31, 2023, 4:02 AM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,826



Credit: FC
Reply With Quote
     
     
  #32  
Old Posted Aug 29, 2023, 3:19 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,826
Reply With Quote
     
     
  #33  
Old Posted Aug 29, 2023, 3:23 PM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
Show me the blueprints
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,373
Presence.
__________________
Everything new is old again

There is no goodness in him, and his power to convince people otherwise is beyond understanding
Reply With Quote
     
     
  #34  
Old Posted Dec 13, 2023, 2:51 AM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,826
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction
Forum Jump



Forum Jump


All times are GMT. The time now is 1:07 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.