  #18221  
Old Posted Mar 4, 2021, 6:56 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
1625 Baronne St·Renovation (Structural) · Ref Code:RJH8LV
Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
Cornella M Porche
Status:
Application Submitted
Date Filed:
3/3/2021
Closed:
No
Description:
Construct a covered patio for seating in courtyard with outdoor counter per plans.

Avatar
djsnola
8807 S Claiborne Ave·Renovation (Structural) · Ref Code:GGCEX4
Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
Maple Ridge Architects
Status:
Application Submitted
Date Filed:
3/4/2021
Closed:
No
Description:
Renovate the facade of the existing laundromat.





LSU Dorm














lSU Med Center











Mercedes







Hard Rock From Yesterday






1111 Canal St·Dumpster/Construction Zone · Ref Code:FMUTKV
Print Summary Submit Add to Watch List
Type:
Dumpster/Construction Zone
Applicant:
Brad Rizzo
Status:
Application Submitted
Date Filed:
3/2/2021
Closed:
No
Description:
Street closure of N. Rampart Street from the neutral ground to the 1111 Canal Street building facade. The closure is to facilitate construction, dumpsters, and crane placement for the Saenger Theatre renovation (1111 Canal Street). Please see attached site plan for reference.

Avatar
djsnola
3226 Magazine St·HDLC COA · Ref Code:32KS8R
Print Summary Submit Add to Watch List
Type:
HDLC COA
Applicant:
Christione Turner
Status:
Draft Application
Date Filed:
3/4/2021
Closed:
No
Description:
Nonstructural exterior and interior renovation to existing restaurant.









1433 St Charles Ave·Interior Demolition · Ref Code:162RQH
Print Summary Submit Add to Watch List
Type:
Interior Demolition
Applicant:
Seamus McGuire
Status:
Application Submitted
Date Filed:
3/2/2021
Closed:
No
Description:
Interior Demo of Old Kitchen Equipment on Level 1 and Old Bathrooms on Level 2

Last edited by tennis1400; Mar 4, 2021 at 8:00 PM.
Reply With Quote
     
     
  #18222  
Old Posted Mar 4, 2021, 8:50 PM
prettyboyfloyd prettyboyfloyd is offline
Registered User
 
Join Date: Sep 2015
Location: New Orleans, LA
Posts: 30
http://www.bellechassebridge.com


BELLE CHASSE, LA, MARCH 1, 2021 - In the first major steps toward construction of the replacement bridge, the Plenary Infrastructure team is currently performing preconstruction activities including the building of roads and creation of project laydown yards in readiness for bridge building in 2021.

Project design finalizations and initial investigative efforts have occurred during 2020. These steps allowed the team to move forward with preconstruction activities. Clearing and grubbing begins this week for this laydown area, which will be located south of the Gulf Intracoastal Waterway between the north and southbound portions of LA 23. These activities are anticipated to continue for two to three weeks. Actual construction of the bridge is anticipated to begin in mid-2021 after pile driving tests are completed in March. Construction is expected to take approximately four years, with the new replacement bridge to be operational in 2024.
Reply With Quote
     
     
  #18223  
Old Posted Mar 5, 2021, 2:59 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Airport Flyover Progress
















Reply With Quote
     
     
  #18224  
Old Posted Mar 5, 2021, 5:31 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
FRITAI 1535 BASIN ST NEW ORLEANS LA Orleans AR.36.0200016729-BL AR.BL - CLASS A RESTAURANT BEER AND LIQUOR 3600016729 PENDING 03/04/2021



https://fritai.com/








21-416319
Tesla, Inc.
Jurisdiction:Jefferson
Type:Building Permit w/ Plan Review,Plan Processing Fee (Plan Review)
Create Date:2021-02-02T10:06:21.497
Status:Application Accepted
Business
Tesla, Inc.
Applicant
Justin Weil
Physical Address
211 VETERANS BLVD METER
70005 METAIRIE, LA
Mailing Address
,
Lot Number
W
SubDivision
METAIRIEVILLE
Square Footage
0
Description
Conversion of thirteen existing parking stalls to twelve electrical vehicle charging stalls and associated improvements necessary to provide sufficient space for ancillary charging support equipment





21-416244
Chipotle
Jurisdiction:Jefferson
Type:Building Permit w/ Plan Review,Plan Processing Fee (Plan Review)
Create Date:2021-02-01T07:59:52.413
Status:Application Accepted
Business
Red Architecture & Planning
Applicant
Thomas Lapens
Physical Address
3600 VETERANS BLVD
70002 METAIRIE, LA
Mailing Address
589 W Nationwide Blvd. Ste. B
43215 Columbus, OH
Lot Number
1C
SubDivision
HESSMER FARMS
Square Footage
2732
Description
200 SF Chipotle service window addition to serve digital order drive-up customers, floor of elevation must match the existing building floor elevation.

Avatar
djsnola
21-416489
Paretti Jaguar Land Rover of New Orleans
Jurisdiction:Jefferson
Type:Building Permit w/ Plan Review,Plan Processing Fee (Plan Review)
Create Date:2021-02-05T08:07:53.493
Status:Application Accepted
Business
Applicant
John Lambertson, Jr.
Physical Address
4000 VETERANS BLVD
70002 METAIRIE, LA
Mailing Address
3400 Hessmer Avenue
70002 Metairie, LA
Lot Number
211
SubDivision
MANSON
Square Footage
11276
Description
Breezeway addition and new exterior cladding for the existing Jaguar parts and service building. Renovation of the "Parts write up" area.




21-415428
Ochsner Health
Jurisdiction:Jefferson
Type:Building Permit w/ Plan Review,Plan Processing Fee (Plan Review)
Create Date:2021-01-13T09:36:28.533
Status:Application Accepted
Business
Grace Hebert Curtis Architects, APAC
Applicant
Joseph Crowley
Physical Address
4400 VETERANS BLVD
70006 METAIRIE, LA
Mailing Address
650 Poydras Street Ste #1110
70130 New Orleans, LA
Lot Number
Z-2
SubDivision
PONTCHARTRAIN GARDENS SECT A
Square Footage
0
Description
Demo as per plans in preparations for a tenant build-out (**Non-Occupancy Permit**)




21-4161801712 S. Clearview PkwyJurisdiction:JeffersonType:Building Permit w/no Plan ReviewCreate Date:2021-01-28T15:42:03.263Statusermit IssuedBusinessDemo Diva LLCApplicantAlyssa WernetPhysical Address1712 S CLEARVIEW PKWY 70001 METAIRIE, LAMailing Address6246 Memphis St70124 New Orleans, LALot Number15BSubDivisionRICHLAND GARDENSSquare Footage0DescriptionDemolish all structures to ground with no slab to remain. All sidewalks must remain. Add to my account Request Inspection

21-415236
Demolition - 1704 S. Clearview Pkwy
Jurisdiction:Jefferson
Type:Building Permit w/no Plan Review
Create Date:2021-01-07T10:50:09.92
Statusermit Issued
Business
Demo Diva Demolition
Applicant
Alyssa Wernet
Physical Address
1704 S CLEARVIEW PKWY
70001 METAIRIE, LA
Mailing Address
6246 Memphis
70124 New Orleans, LA
Lot Number
15A
SubDivision
RICHLAND GARDENS
Square Footage
0
Description
Complete demolition of all structures including removal of concrete slab foundation. All debris hauled away. DEMOLISH ALL STRUCTURES TO GRADE AND BACK FILL.








21-417492
Main Squeeze Juice Company
Jurisdiction:Jefferson
Type:Building Permit w/ Plan Review,Plan Processing Fee (Plan Review)
Create Date:2021-03-03T12:13:26.773
Status:Application Accepted
Business
Maloney Services LLC
Applicant
Michael Maloney
Physical Address
1130 S CLEARVIEW PKWY E
70121 JEFFERSON, LA
Mailing Address
2801 Mount Sharp Road
78676 Wimberley, TX
Lot Number
EVP-2-B
SubDivision
MOUNES DIVISION ELMWOOD INDUSTRIAL PARK
Square Footage
1378
Description
Remodel existing vacant lease space to fit new retail juice / smoothie retail bar. (B) occupancy under 50 occupants



21-416048
Scores West
Jurisdiction:Jefferson
Typereliminary Zoning Clearance
Create Date:2021-01-27T09:28:56.783
Statusermit Closed
Business
Applicant
Lyle Doublet
Physical Address
1555 MANHATTAN BLVD 2
70058 HARVEY, LA
Mailing Address
108 Matherne dr
70030 Des Allemands, LA
Lot Number
L1A
SubDivision
WESSON SNOWDRIFT TRACT
Square Footage
0
Description
Bar and dancer entertainment (continuation of a legal non-conforming use that doesn't meet the distance requirements for Adult Uses; See Permit 14-325846)
Reply With Quote
     
     
  #18225  
Old Posted Mar 5, 2021, 5:31 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Banks Street Multifamily






Reply With Quote
     
     
  #18226  
Old Posted Mar 5, 2021, 5:34 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Things are really moving along at the site of the new City Square 162 affordable housing development! Check out these photos from our project partners Pontchartrain Mechanical Company to see our most recent progress












Reply With Quote
     
     
  #18227  
Old Posted Mar 6, 2021, 5:43 AM
SlidellWx's Avatar
SlidellWx SlidellWx is offline
Registered User
 
Join Date: Nov 2005
Location: New Orleans
Posts: 1,551
There is a ton of upside potential if this rare earth minerals proposal goes through both environmentally and economically. I'm quite excited about this project. There are currently no rare earth processing plants in the United States and only one active mine in Mountain Pass, CA. All of that material has to be shipped to China for processing.

https://www.theadvocate.com/baton_ro...c6fce08f8.html

These minerals are vital to the production of all types of electronic equipment. If I was a facilities planner for an electronics or battery maker, it would make economic sense to build facilities close to a vital source like this proposed plant. You would also have the bonus of a robust logistics network already in place via ship, rail, road, and air. The only negative in our area would be the risk of a major hurricane, but storm hardened facilities can be constructed much like earthquake hardened structures are in place in California.
__________________
Slidell, LA...The Camellia City
Reply With Quote
     
     
  #18228  
Old Posted Mar 8, 2021, 4:35 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
March 5, 2021

CITY OF NEW ORLEANS PROVIDES 'INVITATION TO BID' ON RESTORATION, LEASE OF HISTORIC TOURO-SHAKSPEARE HOME IN ALGIERS
NEW ORLEANS — After a decade and a half of non-use, on Friday the City of New Orleans is releasing an “invitation to bid” to residents and businesses for the opportunity to renovate and lease the historic Touro-Shakspeare Home in Algiers. The property is restricted in use and must remain as something that would qualify as a modern-day alms house. Please check nola.gov/purchasing for further information and “open house” dates.



From 1994 through 2005, the Touro-Shakspeare Home was operated as a nursing home facility, prior to being substantially damaged by Hurricane Katrina. Since 2005, the facility has been vacant and unused.



“The Touro-Shakspeare building is an architecturally significant property on the West Bank with a rich history,” said Ramsey Green, Deputy Chief Administrative Officer for Infrastructure. “This is a wonderful opportunity to restore the property to its original grandeur so that it can once again serve the community in its primary purpose.”



"Touro-Shakspeare is a beautiful, historic building that I believe has always been prime for redevelopment. I worked to re-zone the property in 2019, removing barriers for developers, and helped put this building back into commerce, serving our senior population. It's exciting that Algiers will soon have a newly redeveloped property that the community can be proud of," said Kristin Gisleson Palmer, City Councilmember, District C.



The Touro-Shakspeare Home is the legacy of the philanthropist Judah Touro, who sought care for the aged and indigent. Upon his death, Mr. Touro bequeathed funds for the purchase of immovable property for the construction of an “alms house.” An alms house was a term used in the 19th century for a form of housing for people (typically but not necessarily elderly) who could not earn enough money to pay rent.



Upon his death, the Touro Trust began construction of a 9th Ward alms house in keeping with the testament of Mr. Touro. At some point in the mid 1800s, the partially constructed alms house was commandeered by the Federal government for military use, and, while in possession by the U.S. military, the facility was destroyed by fire.



Act 100 of the 1867 Louisiana Legislature authorized the Board of Directors of the Touro Trust to transfer any funds and real estate owned by the trust to the City of New Orleans. The Act contained a restriction that required funds and property only be used for the purpose listed in the will of Mr. Touro — an alms house in the City of New Orleans.



In 1895, the funds were utilized to construct a second alms house in the Uptown area of New Orleans. In 1927, during the administration of Mayor Joseph Shakspeare, the City purchased immovable property in Orleans Parish on the west bank of the Mississippi River for the current Touro-Shakspeare Home. Construction of the William Burke-designed alms house began in 1932. The impressive structure is marked by diamond-pattern brickwork, stepped parapets, and a grand columned front entrance. It features a 20-foot domed ceiling in its chapel and two enclosed courtyards with decorative columns.

# # #




Reply With Quote
     
     
  #18229  
Old Posted Mar 8, 2021, 4:57 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Hard Rock Demo pic from Yesterday:












201 N Rampart:




Reply With Quote
     
     
  #18230  
Old Posted Mar 8, 2021, 5:07 PM
York1 York1 is offline
Registered User
 
Join Date: Aug 2012
Location: Flyover Country
Posts: 217
It's good to see that building nearly gone.

At the same time, it's sad that a high-rise building that should have been a draw for tourists and a nice addition to Canal Street (if it had been done correctly) is now gone, with no clear picture of what will fill that spot.
Reply With Quote
     
     
  #18231  
Old Posted Mar 8, 2021, 7:34 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
4100 General De Gaulle Dr·Conditional Use · Project #ZD015-21 · Ref Code:JX8ELU
Download (13) Print Summary Submit Add to Watch List
Type:
Conditional Use
Applicant:
Pmat Algiers Plaza LLC, Chick-fil-A Attention: Patrick Davis
Status:
Staff Report
Date Filed:
1/5/2021
Closed:
No
Description:
Zoning Docket 015/21 - Request by PMAT Algiers Plaza, LLC for an amendment to Ordinance No. 24,812 MCS (Zoning Docket 120/11) to permit a fast food restaurant with drive-thru facilities in a C-3 Heavy Commercial District, an SC Suburban Corridor Use Restriction Overlay District, and CT Corridor Transformation Design Overlay District, on Square H-D, Lot 1, in the Fifth Municipal District, bounded by General De Gaulle Drive, Holiday Drive, MacArthur Boulevard, and Rue Parc Fontaine. The municipal addresses are 4110-4150 General De Gaulle Drive and 3008-3070 (except 3014) Holiday Boulevard (PD 12)







Reply With Quote
     
     
  #18232  
Old Posted Mar 9, 2021, 5:14 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
2114 Decatur St·HDLC COA · Ref Code:UWESLE
Download (1) Print Summary Submit Add to Watch List
Type:
HDLC COA
Applicant:
modus inc.
Status:
HDLC Signs and postcards
Date Filed:
3/5/2021
Closed:
No
Description:
Renovation and additions to existing contributing two-story commercial building and non-contributing one-story rear structure including installation of decking to redevelop the site for hotel use.















Reply With Quote
     
     
  #18233  
Old Posted Mar 11, 2021, 3:15 AM
nbrou nbrou is offline
Registered User
 
Join Date: Aug 2020
Posts: 4
Julia Street Mixed-Use Development

I've seen this development mentioned here before, but I came across it again on the Trahan Architects website. I noticed that they have an estimated completion date of 2024 listed. Anyone know anything about this? The renderings seem to leave Plaza Tower out of the mix.


https://trahanarchitects.com/work/ju...e-development/
Reply With Quote
     
     
  #18234  
Old Posted Mar 11, 2021, 4:16 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by nbrou View Post
I've seen this development mentioned here before, but I came across it again on the Trahan Architects website. I noticed that they have an estimated completion date of 2024 listed. Anyone know anything about this? The renderings seem to leave Plaza Tower out of the mix.


https://trahanarchitects.com/work/ju...e-development/
Trahan tends to have some projects listed that arent real proposals. No doubt its beautiful but as far as I know the property its on is still listed for sale. or at least part of that block is for sale. The renderings do for some reason purposefully avoid showing the plaza toewer.
Reply With Quote
     
     
  #18235  
Old Posted Mar 11, 2021, 4:18 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Mercedes Benz














LSU Dorm














Edwards Announces Plans for 50-Acre Louisiana ‘Space Campus’



https://www.bizneworleans.com/edward...-space-campus/
Reply With Quote
     
     
  #18236  
Old Posted Mar 11, 2021, 5:15 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
1100 Canal St·Electrical Repair / Replacement / Addition · Ref Code:1XBJ66
Print Summary Submit Add to Watch List
Type:
Electrical Repair / Replacement / Addition
Applicant:
Arthur Joseph Hartsell
Status:
Application Submitted
Date Filed:
3/10/2021
Closed:
No
Description:
File for inside of the building, clean up/safety, in preparation for building repairs. Entergy Acct#175868397









4215 S Claiborne Ave·New Construction · Ref Code:YPTVVT
Print Summary Submit Add to Watch List
Type:
New Construction
Applicant:
Modern Classic Concepts LLC
Status:
Application Submitted
Date Filed:
3/11/2021
Closed:
No
Description:
THE SCOPE OF WORK OF THIS PROJECT IS TO CONSTRUCT A NEW TWO TENANT MEDICAL OFFICE BUILDING ON A SINGLE LOT IN A C-2 COMMERCIAL DISTRICT WITH A HUC Historic Urban Corridor Use Restriction Overlay District. THE BUILDING IS A 5,167 SQUARE FOOT FACILITY WITH AN OCCUPANT LOAD OF LESS THAN 30 PERSONS (5,167 / 250 SQUARE FEET PER OCCUPANT = 21 PEOPLE). NEURO CLINIIC HAS 3,256 SF AND URGENT CARE CLINIC HAS 1,911 SF. THE BUILDING WILL BE FURNISHED WITH A TWO EXIT AS ALLOWED BY NFPA 101 SECTION 38.2.4.4 THE TRAVEL DISTANCE TO THE EXIT IS 100 FEET AS ALLOWED BY NFPA 101 SECTION 38.2.5.3.2. THERE WILL BE A 2 HOUR SEPARATION BETWEEN THE NEURO CLINIC AND URGENT CARE CLINIC












420 Robert E Lee Blvd·Renovation (Structural) · Ref Code:FGAHDH
Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
Architects Edr
Status:
Application Submitted
Date Filed:
3/10/2021
Closed:
No
Description:
'INTERIOR RENOVATION OF A HISTORIC BUILDING FORMERLY USED AS HOUSING AND MEETING SPACE FOR A RELIGIOUS ORDER, BECOMING SPACES FOR EDUCATIONAL, BUSINESS, AND ASSEMBLY OCCUPANCIES. THIS PROJECT IS NOT A SUBSTANTIAL RENOVATION: CONSTRUCTION BUDGET IS LESS THAN 50 PERCENT OF APPRAISED BUILDING VALUE
Reply With Quote
     
     
  #18237  
Old Posted Mar 12, 2021, 1:27 AM
jjslonaker jjslonaker is offline
NOLA Razorback
 
Join Date: Jan 2012
Location: New Orleans, LA
Posts: 455
[QUOTE=tennis1400;9214914]1100 Canal St·Electrical Repair / Replacement / Addition · Ref Code:1XBJ66
Print Summary Submit Add to Watch List
Type:
Electrical Repair / Replacement / Addition
Applicant:
Arthur Joseph Hartsell
Status:
Application Submitted
Date Filed:
3/10/2021
Closed:
No
Description:
File for inside of the building, clean up/safety, in preparation for building repairs. Entergy Acct#175868397





I guess the hotel tower/theater reno is happening??
Reply With Quote
     
     
  #18238  
Old Posted Mar 12, 2021, 3:05 AM
Larsonmobile Larsonmobile is offline
Registered User
 
Join Date: Feb 2019
Posts: 4
Have you seen Plaza Tower lately? Full of graffiti. That area has come along so nicely. That is the one challenge.
Reply With Quote
     
     
  #18239  
Old Posted Mar 12, 2021, 1:01 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
[QUOTE=jjslonaker;9215482]
Quote:
Originally Posted by tennis1400 View Post
1100 Canal St·Electrical Repair / Replacement / Addition · Ref Code:1XBJ66
Print Summary Submit Add to Watch List
Type:
Electrical Repair / Replacement / Addition
Applicant:
Arthur Joseph Hartsell
Status:
Application Submitted
Date Filed:
3/10/2021
Closed:
No
Description:
File for inside of the building, clean up/safety, in preparation for building repairs. Entergy Acct#175868397





I guess the hotel tower/theater reno is happening??
Could be my guess is this is more than likely to address building condition and upkeep complaints.. the city has been lenient because of Hard Rock collapse , but now that its basically cleared they are going to want to clean the street up
Reply With Quote
     
     
  #18240  
Old Posted Mar 12, 2021, 2:01 PM
sguil1 sguil1 is offline
Registered User
 
Join Date: Jan 2009
Posts: 661
American Airlines is adding non-stop service from New Orleans to this popular Texas

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 2:11 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.