Quote:
Originally Posted by bomberjet
I see the concrete pump out on site doing some work. Wondering if it's with the crane bases. I would assume we'll see some crane action over the next couple weeks.
|
You sir, are correct.
Crane bases were poured yesterday. I'll post a photo later if I remember.
Quote:
Originally Posted by esquire
I wonder when we'll see some more tenants in the office tower? I was walking up Donald today and from what I could see, it looks like only the Thompson Dorfman Sweatman levels are occupied... unless there are some tenants in the lower levels that I couldn't see from that angle.
|
Scotiabank has moved into 13 and 14.
MNP is supposed to be going in below them (I think it's 10 - 12).
Ceridian is going into the 3rd floor.
So, that leaves floors 5 to 9 open.
Quote:
Originally Posted by dmacc
I'm pretty surprised it's taken so long to get the floors ready for the tenants. I looked on their website a they have 9 floors leased. one would think they would want to fill those offices as quick as possible.
|
They got 9 of 14 floors announced well within the first year but I haven't heard anything lately.