HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #2161  
Old Posted Jan 8, 2008, 7:01 PM
k1052 k1052 is offline
Registered User
 
Join Date: Oct 2007
Posts: 2,237
Quote:
Originally Posted by ardecila View Post
This was never part of the plan, I don't think.

Phase III involved building a new elevated Brown Line station at Halsted with a connection to the subway station.
That's not what I recall. They wanted to build a tunnel to cut out the curves over Clybourn/Halsted/North and link up directly with the new station.

I'm not sure there is sufficient track length over Halsted to construct a station that will accommodate the upcoming 8 car Brown Line service.
Reply With Quote
     
     
  #2162  
Old Posted Jan 8, 2008, 7:34 PM
VivaLFuego's Avatar
VivaLFuego VivaLFuego is offline
Registered User
 
Join Date: Feb 2005
Location: Blue Island
Posts: 6,480
Not directly transit related, but rather showing us where our state places priorities for transportation projects. $480 million for an uneeded, duplicative interchange.

http://www.southtownstar.com/news/73...change.article

Quote:
The long-awaited, long-stalled plans for an interchange between Interstates 57 and 294 will enter the new year with a whopping new price tag.

In the works for nearly two decades, the project now is expected to cost at least $480 million, state transportation officials disclosed at a hearing Monday in Oak Forest.
$480 million could substantially modernize the north branch of the Red Line, rehabilitated aging track/structure through the system, bring the bus fleet fully up to modern standards....need I go on. Is it really such a calamity that right now, people wanting to transfer between 57 and 294 need to travel on 80 for a couple miles?
Reply With Quote
     
     
  #2163  
Old Posted Jan 8, 2008, 9:49 PM
bjorda1 bjorda1 is offline
BANNED
 
Join Date: Sep 2007
Posts: 26
Quote:
Originally Posted by VivaLFuego View Post
Is it really such a calamity that right now, people wanting to transfer between 57 and 294 need to travel on 80 for a couple miles?
Yes.
Reply With Quote
     
     
  #2164  
Old Posted Jan 8, 2008, 11:40 PM
ardecila's Avatar
ardecila ardecila is offline
TL;DR
 
Join Date: Jun 2006
Location: the city o'wind
Posts: 16,384
This interchange is ridiculous. Out of the full complement of ramps (8) they only really need 4 (SB 57->SB 294, NB 294->NB 57, SB 294->NB 57, SB 57->NB 294). These 4 ramps shave 6-12 miles off trips. Unfortunately, 2 of them require costly flyovers or speed-reducing cloverleafs.

Any of the other 4 ramps would cut less than a mile from any journey.

If they want full connectivity, then the best way to do it is to build a 294 entrance at 147th. People switching highways can exit at 147th, drive 0.6 miles to the interchange at the other highway, and get on. Hell, they even could do a ton of improvements to 147th to make it limited-access for that 0.6 miles (removing two stoplights and widening), and still spend less than $480 million.
__________________
la forme d'une ville change plus vite, hélas! que le coeur d'un mortel...
Reply With Quote
     
     
  #2165  
Old Posted Jan 9, 2008, 3:30 AM
Busy Bee's Avatar
Busy Bee Busy Bee is offline
Show me the blueprints
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,375
$480 million is appalling. I don't really have a stinging remark or anything. I'm sort of in shock. DISGRACEFUL.
__________________
Everything new is old again

There is no goodness in him, and his power to convince people otherwise is beyond understanding
Reply With Quote
     
     
  #2166  
Old Posted Jan 9, 2008, 3:54 AM
the urban politician the urban politician is offline
The City
 
Join Date: Jul 2004
Location: Chicago region
Posts: 21,375
Study: Ill. Amtrak line could draw 111K
| 08 Jan 2008 | 07:10 PM ET
CHICAGO (AP) - Train feasibility studies don't normally elicit much excitement from casino executives like Bill Renk.

But an Amtrak report released this week gives casino operators in Illinois plenty of reason to smile, concluding that a proposed passenger-train route between Chicago and the Quad Cities could carry 111,000 riders a year.

Many of those riders would likely be Chicago gamblers heading to casinos along the Mississippi River, the study concludes.

"We're very much delighted," Renk, vice president for sales and marketing at the Jumer's Casino Rock Island, said Tuesday. "What this would do is put us in a good position to expose Chicagoland to what the Quad Cities have to offer." There's also good news for longtime advocates of a Chicago-Quad Cities line who feared the project might be too pricey.

The upbeat study estimates costs of upgrading existing track for passenger-train use at between $14 million and $23 million -- lower than earlier estimates of around $30 million. State operating costs would run about $6 million a year, it says.

More at link:
http://www.cnbc.com/id/22562432/
__________________
Supercar Adventures is my YouTube channel:

https://www.youtube.com/channel/UC4W...lUKB1w8ED5bV2Q
Reply With Quote
     
     
  #2167  
Old Posted Jan 9, 2008, 8:54 AM
Rail Claimore's Avatar
Rail Claimore Rail Claimore is offline
Registered User
 
Join Date: Jul 2001
Location: Dallas
Posts: 6,231
Quote:
Originally Posted by ardecila View Post
This interchange is ridiculous. Out of the full complement of ramps (8) they only really need 4 (SB 57->SB 294, NB 294->NB 57, SB 294->NB 57, SB 57->NB 294). These 4 ramps shave 6-12 miles off trips. Unfortunately, 2 of them require costly flyovers or speed-reducing cloverleafs.

Any of the other 4 ramps would cut less than a mile from any journey.

If they want full connectivity, then the best way to do it is to build a 294 entrance at 147th. People switching highways can exit at 147th, drive 0.6 miles to the interchange at the other highway, and get on. Hell, they even could do a ton of improvements to 147th to make it limited-access for that 0.6 miles (removing two stoplights and widening), and still spend less than $480 million.
There'd be great benefit from SB 294 to SB 57 and NB 57 to NB 294 as well... though the Tollway would lose some money from traffic that uses WB 80 to get to SB 57.

It's been in the works for 20 years though, you don't plan for something that long and not build it. I take it most of the benefits for the new interchange would be seen by truck traffic. The fewer local roads trucks are forced to use, the better.

One complaint I do have though is that if they're going to spend money on updating the expressway/tollway system, they need to modernize existing interchanges by eliminating cloverleafs, such as 90/290 in Schaumburg and the Hillside Strangler. 294/55 could also use some work.
__________________
So am I supposed to sign something here?
Reply With Quote
     
     
  #2168  
Old Posted Jan 9, 2008, 2:28 PM
aaron38's Avatar
aaron38 aaron38 is offline
312
 
Join Date: Mar 2006
Location: Palatine
Posts: 4,132
Quote:
Originally Posted by the urban politician View Post
Study: Ill. Amtrak line could draw 111K
An Amtrak report released this week gives casino operators in Illinois plenty of reason to smile, concluding that a proposed passenger-train route between Chicago and the Quad Cities could carry 111,000 riders a year.
I was about to post that after seeing it this morning. As a former Quad Cities resident with family there, I think that's pretty excting. I can easily see myself taking the train as gas prices keep rising.
And I have a grandfather in Moline who's too old to drive to Chicago now, and an Aunt who always gets lost, a train is a great option.
There's also the Augustana College students.

The article also mentions the posibility of extending the line to Iowa City. That makes the most sense of all. Lots of Chicagoland kids go to college at the University of Iowa
Reply With Quote
     
     
  #2169  
Old Posted Jan 9, 2008, 4:02 PM
Busy Bee's Avatar
Busy Bee Busy Bee is offline
Show me the blueprints
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,375
Quote:
Lots of Chicagoland kids go to college at the University of Iowa.
They do?
__________________
Everything new is old again

There is no goodness in him, and his power to convince people otherwise is beyond understanding
Reply With Quote
     
     
  #2170  
Old Posted Jan 9, 2008, 4:48 PM
bjorda1 bjorda1 is offline
BANNED
 
Join Date: Sep 2007
Posts: 26
Quote:
Originally Posted by Rail Claimore View Post
There'd be great benefit from SB 294 to SB 57 and NB 57 to NB 294 as well... though the Tollway would lose some money from traffic that uses WB 80 to get to SB 57.

It's been in the works for 20 years though, you don't plan for something that long and not build it. I take it most of the benefits for the new interchange would be seen by truck traffic. The fewer local roads trucks are forced to use, the better.

One complaint I do have though is that if they're going to spend money on updating the expressway/tollway system, they need to modernize existing interchanges by eliminating cloverleafs, such as 90/290 in Schaumburg and the Hillside Strangler. 294/55 could also use some work.
Yes, I hope they eventually create a flyover from SB I55 to S I294. As it is right now, you have to get off on La Grange. I'm all for this work on the I57/I294. It's retarded that there isn't a interchange already. While we're at it, lets extend Lake Shore drive both north and south.
Reply With Quote
     
     
  #2171  
Old Posted Jan 9, 2008, 4:52 PM
VivaLFuego's Avatar
VivaLFuego VivaLFuego is offline
Registered User
 
Join Date: Feb 2005
Location: Blue Island
Posts: 6,480
Quote:
Originally Posted by Busy Bee View Post
They do?
Tons. Where else would the students come from, Iowa?
Reply With Quote
     
     
  #2172  
Old Posted Jan 9, 2008, 6:53 PM
Dr. Taco Dr. Taco is offline
...
 
Join Date: Apr 2007
Location: 92626
Posts: 3,882
^ yeah, definitely. If you go by bars alone, two of my favorites are "hawkeyes" bars (right in wrigleyville and little italy)
Reply With Quote
     
     
  #2173  
Old Posted Jan 9, 2008, 10:38 PM
j korzeniowski's Avatar
j korzeniowski j korzeniowski is offline
Registered User
 
Join Date: Sep 2006
Location: logan square, chicago
Posts: 525
Quote:
Originally Posted by Busy Bee View Post
They do?
yup, all the one's who couldn't get into illinois ...

anyways, so when is the big vote gonna happen today? i'm on tenterhooks here after a day of emailing and calling and checking google news and local news sites.

ps that interchange story is sickening.
Reply With Quote
     
     
  #2174  
Old Posted Jan 9, 2008, 11:07 PM
Abner Abner is offline
Registered User
 
Join Date: Jan 2007
Posts: 577
One would hope there would be some sort of cost-effectiveness analysis weighing, say, the aggregate time savings and other benefits allowed by a $480 million interchange compared to the benefits of, say, an equivalent investment in mass transit. I would hazard a guess that more people are delayed for more time on the north branch of the Red Line than are delayed because of the absence of that interchange.
Reply With Quote
     
     
  #2175  
Old Posted Jan 9, 2008, 11:12 PM
ardecila's Avatar
ardecila ardecila is offline
TL;DR
 
Join Date: Jun 2006
Location: the city o'wind
Posts: 16,384
Quote:
Originally Posted by Rail Claimore View Post
One complaint I do have though is that if they're going to spend money on updating the expressway/tollway system, they need to modernize existing interchanges by eliminating cloverleafs, such as 90/290 in Schaumburg and the Hillside Strangler. 294/55 could also use some work.
The cloverleaf from NB 294 to NB 290 is horrible. Tons of trucks use it to go northwest from the industrial belt along the Tri-State. It's one lane, and because of the geometry of the interchange, the round cloverleaf becomes an ellipse with even tighter turns. The traffic for that one backs up for miles. It takes me less time to continue north on 294 to O'Hare and then take 90 to Schaumburg. A fly-under would be awesome here.

I've never noticed huge issues on the 90/294 cloverleaf in Schaumburg. Construction on IL-53 has caused some congestion near the southbound exit to Algonquin Road, but that's about it.
__________________
la forme d'une ville change plus vite, hélas! que le coeur d'un mortel...

Last edited by ardecila; Jan 9, 2008 at 11:25 PM.
Reply With Quote
     
     
  #2176  
Old Posted Jan 9, 2008, 11:39 PM
j korzeniowski's Avatar
j korzeniowski j korzeniowski is offline
Registered User
 
Join Date: Sep 2006
Location: logan square, chicago
Posts: 525
oddly buried on the trib home page considering how much news this issue has generated:

House passes mass transit funding plan

Link, Chicago Tribune
Reply With Quote
     
     
  #2177  
Old Posted Jan 10, 2008, 5:34 AM
VivaLFuego's Avatar
VivaLFuego VivaLFuego is offline
Registered User
 
Join Date: Feb 2005
Location: Blue Island
Posts: 6,480
Quote:
Originally Posted by Abner View Post
I would hazard a guess that more people are delayed for more time on the north branch of the Red Line than are delayed because of the absence of that interchange.
Wouldn't be too hard to figure out, but unfortunately for us planner types, it's fantasy to think such rational considerations factor into capital project (i.e. pork) planning.
Reply With Quote
     
     
  #2178  
Old Posted Jan 10, 2008, 1:26 PM
Taft Taft is offline
Registered User
 
Join Date: May 2006
Posts: 638
Quote:
Originally Posted by j korzeniowski View Post
House passes mass transit funding plan
Link, Chicago Tribune
Followed shortly by:

Transit-aid legislation hits bumps
Link, Chicago Tribune

Basically, the original bill passed by the House came up for a vote in the Senate and fell one vote short of passing.

As a personal gripe, I offer this quote from the article:

Quote:
House Republican leader Tom Cross of Oswego said it was "absurd" to pass transit bills without addressing other transportation needs throughout Illinois.

"It is the Chicago power grab," Cross said.
To think of the insane amounts of money the state has spent in the last ten years on maintaining, repairing and adding roads boggles the mind. Compare that to the relative pittance allotted to the RTA. This guy's got nerve.

Taft
__________________
We are building a religion, we are making it bigger.
We are widening the corridor and adding more lanes.
Reply With Quote
     
     
  #2179  
Old Posted Jan 10, 2008, 1:49 PM
j korzeniowski's Avatar
j korzeniowski j korzeniowski is offline
Registered User
 
Join Date: Sep 2006
Location: logan square, chicago
Posts: 525
Quote:
Originally Posted by Taft View Post
Followed shortly by:

Transit-aid legislation hits bumps
Link, Chicago Tribune

Basically, the original bill passed by the House came up for a vote in the Senate and fell one vote short of passing.

As a personal gripe, I offer this quote from the article:



To think of the insane amounts of money the state has spent in the last ten years on maintaining, repairing and adding roads boggles the mind. Compare that to the relative pittance allotted to the RTA. This guy's got nerve.

Taft
and round and round we go!

as frustrating as the state dems have been, the repubs have been just as revolting.
Reply With Quote
     
     
  #2180  
Old Posted Jan 10, 2008, 2:35 PM
jpIllInoIs's Avatar
jpIllInoIs jpIllInoIs is offline
Registered User
 
Join Date: Dec 2005
Posts: 1,213
Yeah Tom Cross (R) is Dennis Hasterts sock puppet FWB. What he means by "Illinois other transportation needs" is the Prairie Parkway freeway.

If you really want to get sick check out the IDOT web page for project planning;

There is a plan for a 4 lane highway connecting Peoria to Macomb (pop. 18,000) A 60 mile- $640 millino dollar project.
http://www.peoriatomacomb.com/

Or the "Gateway Connector" project. Which is bassically a 3rd ring road FREEWAY around the Illinois side of the the St.Louis metro. Meanwhile Chicago still does not have a completed 2nd ring and ours are tollways.
http://dot.state.il.us/gateway/maplink2.shtml

But the best is the 209.5 mile route that would eventually link Davenport,IA to Alton,IL by a four lane freeway. Est cost $1.295 billion not including the 58 mile section between Jacksonville and Alton.
http://dot.state.il.us/us67/Map.html

I would love to see them complete those projects with Zero dollars from the Chicago 6-7 county region.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:05 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.