Biguc is right. It looks like a mistake. They really have no choice but to install whatever panels they have, because you can't install the old ones in the new system. They will simply swap them out when the proper ones arrive.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #1042  
Old Posted Dec 3, 2016, 8:03 PM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,799
If you look at the original renderings though, it did look like they were trying to have different size horizontal stripes top to bottom. Like how there's the black strips at the bottom too.
Reply With Quote
     
     
  #1043  
Old Posted Dec 5, 2016, 2:40 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,791
Quote:
Originally Posted by biguc View Post
I'm not sure why they'd have a skinny piece of spandrel in that colour. I bet the glass maker sent them the wrong stuff. It won't take much to swap it out when they go around finishing the mullion cap.
I think they already have the mullion caps on. They have long silver pieces over he joints already.
Reply With Quote
     
     
  #1044  
Old Posted Dec 5, 2016, 3:14 PM
GarryEllice's Avatar
GarryEllice GarryEllice is offline
Registered User
 
Join Date: Apr 2015
Location: Winnipeg
Posts: 544
Quote:
Originally Posted by bomberjet View Post
I think they already have the mullion caps on. They have long silver pieces over he joints already.
The silver pieces don't look like the finished product to me. Aren't the mullion caps going to be thick and black, as in the rendering? There's a small section near the bottom of the tower done that way, with thick black trim (I assume as a test).
Reply With Quote
     
     
  #1045  
Old Posted Dec 5, 2016, 4:18 PM
MrMark MrMark is offline
Registered User
 
Join Date: Oct 2016
Posts: 3
This side almost looks finished. They put the last piece of glass at the top on friday.I actually like it more now that it's done, it does seem to be coming together better than I expected.

Reply With Quote
     
     
  #1046  
Old Posted Dec 5, 2016, 5:16 PM
biguc's Avatar
biguc biguc is offline
Registered User
 
Join Date: Mar 2003
Location: pinkoland
Posts: 11,678
Quote:
Originally Posted by bomberjet View Post
I think they already have the mullion caps on. They have long silver pieces over he joints already.
I haven't been close enough to confirm but I took those to be pressure plates.
__________________
no
Reply With Quote
     
     
  #1047  
Old Posted Dec 5, 2016, 5:27 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 8,748
Not very often do you get a 50% reclad of a building in the vertical fashion. Usually it is floor by floor. It gives a real neat visual impression of old vs new.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #1048  
Old Posted Dec 5, 2016, 5:52 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,791
Quote:
Originally Posted by biguc View Post
I haven't been close enough to confirm but I took those to be pressure plates.
Okay. I really have no idea! Just looks like a silver strip.

Anyways. Building is looking really nice. And like Biff mentioned, neat to seat a building so visually distinct in the vertical direction.

330 St Mary reclad will have 3 sides completed this year. South side will stay as is for the winter. So similar to 300 Main, but wont be such a distinct difference in colour.

Edit: They will in fact be completing the south side of 330 St Mary over the winter.

Last edited by bomberjet; Dec 5, 2016 at 9:20 PM. Reason: Added things.
Reply With Quote
     
     
  #1049  
Old Posted Dec 5, 2016, 5:56 PM
Urban recluse Urban recluse is offline
BANNED
 
Join Date: Oct 2015
Posts: 4,797
Such a dramatic difference to the boring beige that dominates the cluster. I would love to see this for the Bestlands Building:

http://www.greenlaunches.com/wp-cont...mb-450x317.jpg
Reply With Quote
     
     
  #1050  
Old Posted Dec 5, 2016, 9:00 PM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 25,881
Quote:
Originally Posted by Urban recluse View Post
Such a dramatic difference to the boring beige that dominates the cluster. I would love to see this for the Bestlands Building:

http://www.greenlaunches.com/wp-cont...mb-450x317.jpg
link doesnt work
Reply With Quote
     
     
  #1051  
Old Posted Dec 5, 2016, 9:32 PM
Urban recluse Urban recluse is offline
BANNED
 
Join Date: Oct 2015
Posts: 4,797
Reply With Quote
     
     
  #1052  
Old Posted Dec 5, 2016, 9:56 PM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 25,881
the silver piece is track the caps atached to
Reply With Quote
     
     
  #1053  
Old Posted Dec 6, 2016, 12:02 AM
Wolf13 Wolf13 is offline
Registered User
 
Join Date: Apr 2016
Posts: 1,664
I actually spoke to some folks at 360 about this today. They and the contractor were well aware that this; it is a mild error that will be fixed.

I think there was some testing done and they just had to seal it up immediately after also. Perhaps the right panel wasn't available at the time?

They laughed my concern off for thinking this would be permanent, so that's a relief.
Reply With Quote
     
     
  #1054  
Old Posted Dec 6, 2016, 12:07 AM
Wolf13 Wolf13 is offline
Registered User
 
Join Date: Apr 2016
Posts: 1,664
Quote:
Originally Posted by Ando View Post
They seem to indicate that they want to maintain a retail presence at a prominent intersection - and what could become more prominent soon!
Agreed.

All major banks are prominent in this area, working with/for the highest concentration of Winnipeg's business activity. Would be a huge fail if they moved away from that.

Right now, Hardvard has major presence with TD and Royal Bank, as does Artis with BMO and Royal Bank (not to mention CIBC in the Richardson).
Reply With Quote
     
     
  #1055  
Old Posted Dec 6, 2016, 2:24 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 8,748
Quote:
Originally Posted by Urban recluse View Post
Looks like the perfect reclad for the former Post Office Building/money pit on Graham.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #1056  
Old Posted Dec 6, 2016, 3:08 PM
Urban recluse Urban recluse is offline
BANNED
 
Join Date: Oct 2015
Posts: 4,797
Oh, yes, another potential project.
Reply With Quote
     
     
  #1057  
Old Posted Dec 6, 2016, 4:07 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,791
Quote:
Originally Posted by Wolf13 View Post
I actually spoke to some folks at 360 about this today. They and the contractor were well aware that this; it is a mild error that will be fixed.

I think there was some testing done and they just had to seal it up immediately after also. Perhaps the right panel wasn't available at the time?

They laughed my concern off for thinking this would be permanent, so that's a relief.
Good work haha One would assume they knew about it.
Reply With Quote
     
     
  #1058  
Old Posted Dec 13, 2016, 1:07 AM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 25,881
looks like they are fixing that mis match already
Reply With Quote
     
     
  #1059  
Old Posted Dec 13, 2016, 1:21 AM
Urban recluse Urban recluse is offline
BANNED
 
Join Date: Oct 2015
Posts: 4,797
Thank God. Thanks for the pic.
Reply With Quote
     
     
  #1060  
Old Posted Dec 13, 2016, 6:47 AM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 13,461
It's weird they didn't do the corners. I wonder what the deal is.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 7:51 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.