Smile NEW YORK | Mario Cuomo (Tappan Zee) Bridge

Never got around to posting all of the images of the 3 proposals to replace the Tappan Zee Bridge (I will), but here's the winning replacement.


http://archpaper.com/news/articles.asp?id=6415

Return of the Giants
New York kicks off one of the nation's largest public works projects: replacing the Tappan Zee Bridge.






December 19 2012
Aaron Seward


Quote:
On December 17, the New York State Thruway Authority unanimously selected a winning proposal for the replacement of the Tappan Zee Bridge in the Lower Hudson Valley. The authority picked the cheapest of three proposals it had under consideration—the $3.1 billion dollar design by Tappan Zee Contractors. Construction is scheduled to begin in early 2013 and completion is projected for 2018.

The winning design features a twin roadway with a central 350-foot-long, composite-deck, cable-stayed span supported by four reinforced concrete towers that resemble capital "As" turned on their heads. The outwardly inclined towers will be robust enough to handle the loads of rail and/or select bus rapid transit, which may be added to the project at a future date.

The replacement will be the single largest bridge project in New York history, with a construction price tag of $3.1 billion plus another $500 million to $800 million in environmental mitigation, management, and other costs—still considerably less than the original $5.2 billion estimated by the state. The state also enacted special legislation for the project that requires the design-build contractor to cover cost overruns and delays.

Winning design team Tappan Zee Contractors is a consortium between, among others, Pennsylvania-based American Bridge Company (the builder of the original crossing) and Texas-based Fluor Corporation. Those firms were members of the team that designed and constructed the recently completed San Francisco-Oakland Bay Bridge replacement. The team will make use of special heavy-lifting equipment it constructed for that project to cut costs and time from the Tappan Zee replacement, a factor that gave the firms the confidence to enter a bid that was approximately a billion dollars cheaper and a year faster than its competitors. It also proposes to reduce the amount of dredging necessary from 1.8 million cubic yards to less than one million cubic yards, reducing environmental impacts, costs, and the schedule.










__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Global Projects & Construction > General Development
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 10:39 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.