a few shots from the last couple weekends...
most of the scaffolding is down on the northern, creek-facing, side of Mercy Housing block 13E. here seen from the Fourth St Bridge, along with neighbors Sol and Arden:
here the entrance to Fourth St, with Channel MB on the left:
looking east down Channel:
west up Channel:
the little alleyway between blocks 13E and 13W ('Sol', on the right). burned-to-the-bones block 5 can be glimpsed behind, and Strata, whose boarded-up windows are finally being attended to, beyond:
'Sol' itself:
a long look east along Channel from approximately the roundabout
:
Kaiser construction seems to have slowed down. here looking south down Owens:
here from the roof of Rutter Center:
UCSF new medical office building has pavers at the ready, as the landscaping on the 16th St side begins to take shape...
...and is seeing some of the signature yellow stone walls go in...
speaking of yellow stone walls, the hospital across 16th is also getting them. the Fourth St drop-off loop is just to the right:
the south side of 16th never had real sidewalks, but soon will. looking west:
and east:
along the south side of the hospital, a reminder how much Mariposa will be widened - looking east, the curb-line of the new sidewalk alignment can be seen on the left, the existing sidewalk on the far right:
still along Mariposa, closer to Third, landscaping is going in along the sidewalk there:
a couple shots of the Gantry (2121 Third)... Third St side:
Illinois side:
the main entrance to the public safety building is also coming together: